Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Broken Hill Rasp mine ore sources: production and planning notes for engineers

    July 31, 2026|

    Reviewed by Joe Ashwell

    Broken Hill Rasp mine ore sources: production and planning notes for engineers

    First reported on Australian Mining

    30 Second Briefing

    Broken Hill Mines has lifted silver, lead and zinc output at the Rasp mine as ore from the high‑grade Main Lode deposit starts feeding the plant, supporting a push towards 750,000 tonnes per annum capacity from multiple new ore sources. June quarter results show improved production and financial metrics, with the diversified feed expected to stabilise mill throughput and extend mine life beyond the existing Western Mineralisation and Centenary resources. Geotechnical and planning teams will need to manage sequencing and ground conditions across several lodes while maintaining consistent ore quality to the concentrator.

    Technical Brief

    • Ore from the high-grade Main Lode deposit is now physically feeding the Rasp processing plant.
    • Multiple new ore sources are being integrated into the existing underground mine layout at Broken Hill.
    • Production uplift spans all three commodities mined at Rasp: silver, lead and zinc.
    • June quarter performance data show concurrent improvement in both metallurgical output and financial metrics.
    • Diversified ore feed demands tighter control of blend ratios to maintain concentrator performance and recoveries.
    • Additional ore sources will necessitate revised ventilation, haulage and backfill scheduling underground.
    • Similar multi-lode brownfield expansions often trigger updates to ground control management plans and seismic monitoring coverage.

    Our Take

    Broken Hill Mines’ work at the Rasp Mine sits alongside its newer exploration push noted in April 2026, where it was also progressing gold and base metal targets, suggesting the company is trying to balance mature silver‑lead‑zinc production at Broken Hill with a broader pipeline of polymetallic prospects.

    Within our 1276 Mining stories, silver‑lead pieces like this are relatively concentrated around a few long‑life districts such as Broken Hill and Hermosa, signalling that established polymetallic camps remain central to supply even as greenfield critical‑minerals projects gain attention.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners
    Mining
    1 day ago

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners

    McEwen has agreed to sell its Fuller and Paymaster gold properties in Ontario’s Timmins district to Discovery Mining for $55 million in cash and stock, freeing capital to push a production target of 250,000–300,000 gold-equivalent ounces per year by 2030. The deal covers 210 hectares at Fuller, a 60% stake in the 179-hectare Paymaster property, and associated surface rights, consolidating Paymaster under Discovery’s Dome Mine subsidiary. Proceeds will be reinvested into the Fox Complex (Froome, Stock, Grey Fox), Nevada’s Gold Bar Complex, and Mexico’s El Gallo build, with Stock Mine slated for first ore in Q4 2026 and commercial output in Q1 2027.

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams
    Mining
    1 day ago

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams

    South America’s Lithium Triangle holds about 64 million tonnes of identified lithium resources (43% of the global 150 million tonnes), yet geologist José Cabello’s review of 43 salt flats across Argentina, Bolivia and Chile shows that variable brine chemistry, impurities and groundwater behaviour make recovery and costs highly site-specific. Salar de Atacama benefits from ultra‑dry climate, relatively clean brines and strong logistics, while other basins such as Altoandinos, Pedernales, Hombre Muerto Oeste, Rincón, Sal de los Ángeles and Sal de Vida face tighter water and hydrogeological constraints. Direct lithium extraction (DLE) could unlock lower‑grade or impurity‑rich brines, but Cabello stresses that trade‑offs between brine withdrawal and freshwater consumption mean technology selection must be tailored to each basin’s hydrology and ecosystem.

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners
    Mining
    1 day ago

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners

    EU regulators have granted strategic status under the Critical Raw Materials Act to KGHM’s 9.5‑billion‑zloty ($2.44bn) Retków‑Grodziszcze mine and Legnica smelter conversion, unlocking faster permitting, streamlined administration and access to preferential financing. Retków‑Grodziszcze is planned to deliver over 100 million tonnes of ore by 2055, yielding about 1.5 million tonnes of copper and 5,000 tonnes of silver, while Legnica’s recycling line targets 135,000 tonnes of electrolytic copper and 250 tonnes of nickel per year. The move materially boosts EU copper and nickel recycling capacity, central to the CRMA’s 25% recycling target.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental