Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Barton’s Tunkillia drilling: JORC upgrade implications for pit design and PFS teams

    August 7, 2026|

    Reviewed by Joe Ashwell

    Barton’s Tunkillia drilling: JORC upgrade implications for pit design and PFS teams

    First reported on Australian Mining

    30 Second Briefing

    Barton Gold has completed a 39,000m phase 2 drilling campaign at the Tunkillia gold project in South Australia, comprising 38,760m of reverse circulation and diamond drilling across 311 holes over five months. The work targets upgrades to JORC resource classifications ahead of a pre-feasibility study, focusing on better definition of existing mineralisation rather than pure step-out exploration. For mine planners and geotechnical teams, the expanded diamond core dataset should materially improve structural, geometallurgical and rock mass characterisation for pit design and scheduling.

    Technical Brief

    • Additional diamond core will support detailed rock mass classification for slope design and bench height optimisation.
    • Structural logging from oriented core is expected to refine fault geometries controlling orebody continuity and dilution.
    • Expanded assay dataset should tighten variography, allowing shorter search ranges and reduced kriging smoothing in models.
    • Geometallurgical characterisation from core (alteration, sulphides, hardness) will feed into comminution and recovery assumptions.
    • Closer-spaced drilling around existing lodes aims to convert inferred ounces, improving early-year production confidence.
    • For similar Archaean gold systems, such dense infill drilling often reduces strip ratio uncertainty and cutback risk.

    Our Take

    With 311 holes completed over five months at the Tunkillia gold project, Barton Gold is generating the kind of dense dataset typically used to tighten pit-shell geometry and convert a meaningful portion of Inferred ounces to Indicated ahead of pre-feasibility work.

    The recent pre-feasibility study launch at Tunkillia, led by GR Engineering Services, means these JORC upgrades in South Australia are likely to feed directly into plant sizing and mine scheduling assumptions rather than being a purely corporate resource update.

    In our database of gold-focused Mining/Projects coverage, Barton Gold now appears alongside only a handful of Australian juniors running parallel drilling and study programs at multiple assets (Tunkillia and Challenger), which usually signals an intent to build a regional production hub rather than a single-mine play.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners
    Mining
    about 21 hours ago

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners

    McEwen has agreed to sell its Fuller and Paymaster gold properties in Ontario’s Timmins district to Discovery Mining for $55 million in cash and stock, freeing capital to push a production target of 250,000–300,000 gold-equivalent ounces per year by 2030. The deal covers 210 hectares at Fuller, a 60% stake in the 179-hectare Paymaster property, and associated surface rights, consolidating Paymaster under Discovery’s Dome Mine subsidiary. Proceeds will be reinvested into the Fox Complex (Froome, Stock, Grey Fox), Nevada’s Gold Bar Complex, and Mexico’s El Gallo build, with Stock Mine slated for first ore in Q4 2026 and commercial output in Q1 2027.

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams
    Mining
    about 21 hours ago

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams

    South America’s Lithium Triangle holds about 64 million tonnes of identified lithium resources (43% of the global 150 million tonnes), yet geologist José Cabello’s review of 43 salt flats across Argentina, Bolivia and Chile shows that variable brine chemistry, impurities and groundwater behaviour make recovery and costs highly site-specific. Salar de Atacama benefits from ultra‑dry climate, relatively clean brines and strong logistics, while other basins such as Altoandinos, Pedernales, Hombre Muerto Oeste, Rincón, Sal de los Ángeles and Sal de Vida face tighter water and hydrogeological constraints. Direct lithium extraction (DLE) could unlock lower‑grade or impurity‑rich brines, but Cabello stresses that trade‑offs between brine withdrawal and freshwater consumption mean technology selection must be tailored to each basin’s hydrology and ecosystem.

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners
    Mining
    about 21 hours ago

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners

    EU regulators have granted strategic status under the Critical Raw Materials Act to KGHM’s 9.5‑billion‑zloty ($2.44bn) Retków‑Grodziszcze mine and Legnica smelter conversion, unlocking faster permitting, streamlined administration and access to preferential financing. Retków‑Grodziszcze is planned to deliver over 100 million tonnes of ore by 2055, yielding about 1.5 million tonnes of copper and 5,000 tonnes of silver, while Legnica’s recycling line targets 135,000 tonnes of electrolytic copper and 250 tonnes of nickel per year. The move materially boosts EU copper and nickel recycling capacity, central to the CRMA’s 25% recycling target.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental