Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Auric’s Union Jack acquisition: pit footprint and haulage synergies for Burbanks planners

    October 7, 2026|

    Reviewed by Tom Sullivan

    Auric’s Union Jack acquisition: pit footprint and haulage synergies for Burbanks planners

    First reported on Australian Mining

    30 Second Briefing

    Auric Mining has completed the $9.5 million acquisition of the Union Jack gold project in Western Australia, securing the granted M15/120 mining lease with $6.5 million in cash and $3 million in shares, subject to shareholder approval. The project, located about 15km from Auric’s existing Burbanks operations near Coolgardie, is described as a near-term open-pit opportunity that will feed into and expand the Burbanks growth strategy. For mine planners and geotechs, the deal consolidates local tenure and supports a larger, potentially more continuous open-pit mining footprint around Burbanks.

    Technical Brief

    • Consideration structure splits $6.5 million cash and $3 million in scrip, affecting upfront capex profile.
    • Granted status of M15/120 removes mining lease lead time, shortening permitting and pre-strip schedule.
    • Near-term open-pit focus implies shallow oxide and transitional ore, simplifying geotechnical design and drill‑and‑blast patterns.

    Our Take

    Auric Mining’s earlier coverage in our database shows the Munda gold project near Widgiemooltha already generating revenue, so consolidating the Union Jack mining lease (M15/120) within 15 km likely supports a hub-style processing and scheduling strategy across multiple Western Australian gold assets.

    The mixed $6.5 million cash and $3 million share consideration for Union Jack fits a pattern in recent Australian gold M&A where juniors preserve balance-sheet flexibility by paying partly in scrip, which can cushion near-term cashflow pressure while they ramp drilling or pre-strip.

    Across the 1262 Mining stories in our database, Western Australia gold items featuring Auric Mining recur in several project-advancement pieces, signalling that the company is positioning itself as a multi-asset operator rather than a single-mine play in the state’s mature goldfields.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 2 hours ago

    Finsch Diamond Mine mobile fleet sale: asset value and fit for hard-rock operators

    Large-scale underground and surface equipment from Finsch Diamond Mine (Pty) Ltd near Lime Acres in South Africa’s Northern Cape is being sold through a structured asset disposal process run by Park Village Auctions as part of business rescue proceedings. The package includes a substantial mobile mining fleet, processing plant components and supporting infrastructure, with the process explicitly geared to maximising realisable value. For operators in hard-rock underground mining, the sale offers a rare opportunity to acquire compatible diamond-mine-grade assets without greenfield lead times.

    Mining
    about 2 hours ago

    BME’s smarter explosive supply for African mining: logistics and safety notes for engineers

    BME, part of Omnia Holdings, is rolling out modular, containerised emulsion plants to give remote African mines secure on-site explosive manufacture instead of relying on long-haul bulk deliveries. Production and Logistics General Manager Dirk Voogt says the units are designed for regions such as West Africa where poor road infrastructure, border delays and port congestion frequently disrupt ammonium nitrate and emulsion supply. The plug-and-play plants allow mines to stabilise blasting schedules and stock levels, with process control and security integrated into the container footprint.

    Mining
    about 2 hours ago

    ABB power conversion at Fortescue’s North Star: grid‑stability lessons for mine power

    Fortescue is installing an ABB power conversion system at its North Star Junction hub in the Pilbara to stabilise its emerging high‑voltage power network for large‑scale iron ore operations. The PCS will manage bidirectional power flows between grid, renewables and storage, providing fast frequency and voltage support to maintain quality supply for heavy mining loads and long overland conveyors. For engineers, the project signals growing demand for grid‑scale PCS integration in remote mines transitioning away from diesel generation.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental