Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Sustainability

    ABB power conversion at Fortescue’s North Star: grid‑stability lessons for mine power

    October 7, 2026|

    Reviewed by Tom Sullivan

    First reported on International Mining – News

    30 Second Briefing

    Fortescue is installing an ABB power conversion system at its North Star Junction hub in the Pilbara to stabilise its emerging high‑voltage power network for large‑scale iron ore operations. The PCS will manage bidirectional power flows between grid, renewables and storage, providing fast frequency and voltage support to maintain quality supply for heavy mining loads and long overland conveyors. For engineers, the project signals growing demand for grid‑scale PCS integration in remote mines transitioning away from diesel generation.

    Technical Brief

    • ABB’s PCS is being deployed at Fortescue’s North Star Junction hub in the Pilbara network.

    Our Take

    Fortescue’s Pilbara iron ore operations have just delivered record FY26 shipments of 201.3 Mt in our coverage, so any ABB power conversion upgrade at the North Star Junction hub is likely being sized for high utilisation and incremental throughput rather than early-stage ramp-up risk.

    ABB’s involvement at a Western Australia iron ore hub dovetails with Fortescue Zero’s push into the ABB FIA Formula E World Championship, suggesting Fortescue is cultivating ABB’s electrification and power electronics expertise across both its Pilbara mining systems and its branded technology ventures.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 3 hours ago

    Finsch Diamond Mine mobile fleet sale: asset value and fit for hard-rock operators

    Large-scale underground and surface equipment from Finsch Diamond Mine (Pty) Ltd near Lime Acres in South Africa’s Northern Cape is being sold through a structured asset disposal process run by Park Village Auctions as part of business rescue proceedings. The package includes a substantial mobile mining fleet, processing plant components and supporting infrastructure, with the process explicitly geared to maximising realisable value. For operators in hard-rock underground mining, the sale offers a rare opportunity to acquire compatible diamond-mine-grade assets without greenfield lead times.

    Mining
    about 3 hours ago

    BME’s smarter explosive supply for African mining: logistics and safety notes for engineers

    BME, part of Omnia Holdings, is rolling out modular, containerised emulsion plants to give remote African mines secure on-site explosive manufacture instead of relying on long-haul bulk deliveries. Production and Logistics General Manager Dirk Voogt says the units are designed for regions such as West Africa where poor road infrastructure, border delays and port congestion frequently disrupt ammonium nitrate and emulsion supply. The plug-and-play plants allow mines to stabilise blasting schedules and stock levels, with process control and security integrated into the container footprint.

    Mining
    about 3 hours ago

    EORA Energy–Tulla Group JV: hybrid power lessons from Norseman gold mine

    EORA Energy has formed a joint venture with Kevin Maloney’s Tulla Group to expand from battery storage into integrated energy infrastructure development for mining and remote operations. The JV’s first reference project is the Norseman gold mine and associated camp site in Western Australia, signalling a push towards dedicated on-site power solutions for off-grid resources projects. For mine operators, this points to more tailored hybrid power and storage options for camps and processing plants in remote locations.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental