Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Failure
    Safety

    Artemis Gold Blackwater outage: reliability and schedule notes for mine engineers

    March 12, 2026|

    Reviewed by Tom Sullivan

    Artemis Gold Blackwater outage: reliability and schedule notes for mine engineers

    First reported on MINING.com

    30 Second Briefing

    Artemis Gold has halted processing at its Blackwater mine in central British Columbia after a ball mill gearbox failure forced a production outage expected to last 8–10 days, though mining activities continue and a replacement gear is on hand. First-quarter output will be below plan, but full-year guidance of 265,000–290,000 oz remains unchanged as the company brings forward second-quarter maintenance to use the downtime. The shutdown briefly knocked Artemis’ market capitalisation below C$9 billion, despite Blackwater having produced 192,808 oz of gold in its first eight months of operation in 2025.

    Technical Brief

    • Failure mechanism is a ball mill gearbox malfunction, implying drivetrain torsional/gear tooth distress rather than shell or bearing damage.
    • Investigation will centre on gearbox inspection, oil/particle analysis and alignment checks to distinguish wear, lubrication or overload causes.
    • Repair scope is limited to gear replacement with parts already on site, avoiding extended lead-time procurement risk.
    • With mining activities continuing, ore stockpiles will build at Blackwater, requiring short-term ROM pad capacity and material blending planning post-restart.
    • Maintenance originally scheduled for Q2 is being advanced into the outage window, effectively converting unplanned downtime into planned mechanical and electrical works.
    • For similar single-train grinding circuits, the event reinforces the value of online vibration/temperature monitoring and condition-based maintenance on gearboxes to reduce sudden outages.

    Our Take

    With Artemis Gold’s Blackwater mine in British Columbia experiencing a short outage, it contrasts with Enami’s focus on long-life copper assets like the Llurimagua project in Ecuador, underscoring how state-backed Latin American players in our database are emphasising multi-decade stability while Canadian gold producers manage early ramp-up reliability risk.

    A sub‑two‑week repair window at a C$9 billion‑class gold producer places this incident at the lower end of disruption severity among the 2058 tag‑matched ‘Failure’ and ‘Safety’ pieces in our coverage, suggesting more of a commissioning reliability issue than a structural threat to asset value.

    The 192,808 oz of gold produced over eight months in 2025 at Blackwater positions Artemis Gold among the more substantial single‑asset gold names in our database, meaning even brief stoppages can have outsized market reactions, as reflected in the 6% intraday share price move.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    US Elemental Nasdaq path and McDermitt lithium: project timing and risk notes for engineers
    Mining
    about 16 hours ago

    US Elemental Nasdaq path and McDermitt lithium: project timing and risk notes for engineers

    Jindalee Lithium will spin out its US assets into Nasdaq-bound US Elemental via a merger with a US-listed SPAC, retaining about 80% ownership and targeting a Q3–Q4 2026 listing as work accelerates at the McDermitt lithium project on the Oregon–Nevada border. A 2024 pre-feasibility study for McDermitt, one of the two largest known US lithium resources alongside Thacker Pass, outlined a 60+ year mine life from only part of the resource, with in-fill drilling and a full feasibility study scheduled for 2026–27. McDermitt’s inclusion in the FAST-41 federal permitting programme aims to secure key permits by end-2028, positioning the project ahead of many peers while remaining insulated from current construction cost spikes.

    Litus–UWin Nanotech critical minerals JV: flowsheet design notes for engineers
    Mining
    3 days ago

    Litus–UWin Nanotech critical minerals JV: flowsheet design notes for engineers

    Calgary-based Litus has signed a 25 May memorandum of understanding with Taiwan’s UWin Nanotech to jointly develop selective extraction, separation, recovery and purification flowsheets for cobalt, lithium, nickel and other elements from battery recycling and other secondary sources. The collaboration will combine Litus’ LiNC one-step direct lithium extraction platform for low- and high-concentration brines and its ReLiGN battery recycling process with UWin’s hydrometallurgical systems used in Apple-certified e‑waste and Li-ion recycling. Engineers should watch for integrated nanomaterial–hydromet circuits targeting both critical minerals and rare earth elements in circular supply chains.

    Gold price erases 2026 gains: cost-of-carry and project impacts for miners
    Mining
    3 days ago

    Gold price erases 2026 gains: cost-of-carry and project impacts for miners

    Gold fell as much as 3.5% to $4,315/oz, its lowest since March, erasing 2026 gains after a strong US May nonfarm payrolls print pushed Treasury yields and the dollar higher and lifted Fed rate hike odds. US gold futures dropped over 3.2% to $4,342/oz, with CME FedWatch now pricing about a 68% chance of a December hike versus roughly 50% pre-data. Since the Iran war began and the Strait of Hormuz closure drove energy prices up, bullion has slid nearly 18%, raising the cost of carry for non-yielding gold.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental