Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Apex’s Rift rare earth assays: resource growth and grade lens for mine planners

    August 13, 2026|

    Reviewed by Joe Ashwell

    Apex’s Rift rare earth assays: resource growth and grade lens for mine planners

    First reported on MINING.com

    30 Second Briefing

    Apex Critical Metals has reported further high-grade rare earth intercepts at its Rift project in Nebraska, including 10.2 metres at 5.27% TREO from 178.6 metres in hole RIFT26-14 and 8 metres at 4.48% TREO from 273 metres in RIFT26-12, both within ~150-metre zones above 2% TREO in the shallow west-dipping Trinity Zone. Earlier 2026 holes such as RIFT26-008 cut 191.9 metres at 2.5% REO, including 14.9 metres at 5.09% and 12.3 metres at 5.63%, with NdPr-enriched intervals averaging 49% NdPr over 10 metres. Mineralisation now extends over more than 700 metres of strike in the Elk Creek carbonatite complex, remains open in all directions, and is targeting an initial resource in Q1 2027.

    Technical Brief

    • Rift lies ~100 km south of Lincoln within the Elk Creek carbonatite complex, proximal to NioCorp’s Elk Creek niobium project.
    • April–May drilling defined an NdPr-enriched horizon, with RIFT26-002 averaging 49% NdPr over 10 m at 0.75% REO.
    • Hole RIFT26-003 extended this NdPr-rich zone to at least 120 m of strike length.
    • Earlier 2026 holes include RIFT26-002 (81.6 m @ 2.02% REO from 221.2 m) and RIFT26-005A (137.2 m @ 2.01% REO from 252.6 m).
    • RIFT26-008 intersected 191.9 m @ 2.5% REO from 211.5 m, including 14.9 m @ 5.09% and 12.3 m @ 5.63% REO.
    • Mineralisation now traced over >700 m strike and remains open in all directions, guiding step-out drill planning.
    • Market reaction: Apex Critical Metals’ share price rose 7.6% to C$1.28, implying >C$123 million valuation.
    • Rift is being benchmarked against North American rare earth assets such as Mountain Pass, Wicheeda and Ucore’s planned Louisiana separation plant, underscoring potential strategic relevance for non-Chinese magnet supply chains.

    Our Take

    With MP Materials and USA Rare Earth already facing Chinese export controls on dual-use goods at Mountain Pass, a domestic hard-rock source like Apex Critical Metals’ Rift project in southeastern Nebraska could become more strategically important to US policymakers looking to diversify rare earth supply away from California-centric assets.

    The high NdPr proportions reported at Rift align with OEM demand for magnet materials highlighted in several of our 136 rare-earth keyword-matched pieces, suggesting this project is better positioned for downstream offtake discussions than US rare earth prospects skewed toward lower-value light REO suites.

    Our database shows most recent North American rare earth coverage clustering around California (Mountain Pass and nearby San Bernardino exploration), so Rift’s location in the Elk Creek district of Nebraska signals a geographic broadening of US critical mineral exploration that may ease permitting and infrastructure bottlenecks concentrated in the US southwest.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners
    Mining
    about 16 hours ago

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners

    McEwen has agreed to sell its Fuller and Paymaster gold properties in Ontario’s Timmins district to Discovery Mining for $55 million in cash and stock, freeing capital to push a production target of 250,000–300,000 gold-equivalent ounces per year by 2030. The deal covers 210 hectares at Fuller, a 60% stake in the 179-hectare Paymaster property, and associated surface rights, consolidating Paymaster under Discovery’s Dome Mine subsidiary. Proceeds will be reinvested into the Fox Complex (Froome, Stock, Grey Fox), Nevada’s Gold Bar Complex, and Mexico’s El Gallo build, with Stock Mine slated for first ore in Q4 2026 and commercial output in Q1 2027.

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams
    Mining
    about 16 hours ago

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams

    South America’s Lithium Triangle holds about 64 million tonnes of identified lithium resources (43% of the global 150 million tonnes), yet geologist José Cabello’s review of 43 salt flats across Argentina, Bolivia and Chile shows that variable brine chemistry, impurities and groundwater behaviour make recovery and costs highly site-specific. Salar de Atacama benefits from ultra‑dry climate, relatively clean brines and strong logistics, while other basins such as Altoandinos, Pedernales, Hombre Muerto Oeste, Rincón, Sal de los Ángeles and Sal de Vida face tighter water and hydrogeological constraints. Direct lithium extraction (DLE) could unlock lower‑grade or impurity‑rich brines, but Cabello stresses that trade‑offs between brine withdrawal and freshwater consumption mean technology selection must be tailored to each basin’s hydrology and ecosystem.

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners
    Mining
    about 16 hours ago

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners

    EU regulators have granted strategic status under the Critical Raw Materials Act to KGHM’s 9.5‑billion‑zloty ($2.44bn) Retków‑Grodziszcze mine and Legnica smelter conversion, unlocking faster permitting, streamlined administration and access to preferential financing. Retków‑Grodziszcze is planned to deliver over 100 million tonnes of ore by 2055, yielding about 1.5 million tonnes of copper and 5,000 tonnes of silver, while Legnica’s recycling line targets 135,000 tonnes of electrolytic copper and 250 tonnes of nickel per year. The move materially boosts EU copper and nickel recycling capacity, central to the CRMA’s 25% recycling target.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental