Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Alkane’s thousand g/t Costerfield hits: design and dilution notes for mine planners

    August 24, 2026|

    Reviewed by Tom Sullivan

    Alkane’s thousand g/t Costerfield hits: design and dilution notes for mine planners

    First reported on Australian Mining

    30 Second Briefing

    Alkane Resources has defined a new high‑grade mineralised zone within the Cuffley Lode at its Costerfield gold–antimony mine in Victoria, using 23 diamond drill holes into previously unmined ground between historical high‑grade Cuffley panels. Intercepts include 0.61m at 580.9g/t gold and other “thousand grams per tonne” hits, pointing to very narrow but ultra‑high‑grade vein structures typical of the district. For mine planners and geotechs, the results suggest potential for additional high‑margin stopes but with challenging ground control and dilution management in sub‑metre widths.

    Technical Brief

    • New mineralised zone sits within the existing Cuffley Lode footprint at Costerfield, not a satellite discovery.
    • Target area lies between historically mined high‑grade Cuffley panels, implying remnant, previously unrecognised shoots.
    • All 23 holes were diamond core, giving good structural and geotechnical information for narrow‑vein modelling.
    • Discovery is within an operating gold–antimony mine, so access, services and ventilation are already established.
    • Location in a mature underground camp suggests potential to tie new stopes into existing decline and level development.
    • Narrow‑vein geometry will favour highly selective mining methods (e.g. cut‑and‑fill, resue, narrow longhole).

    Our Take

    Alkane Resources has been steadily building a Victorian antimony–gold pipeline, with this Costerfield hit following its June 2026 start of diamond drilling at the historic Nagambie mine under an earn-in, signalling a multi-asset strategy in the state rather than a single discovery play.

    With Alkane’s recent record quarterly net profit of $93 million and cash, bullion and listed investments of $374 million from its Tomingley operations, the company appears well funded to rapidly follow up high-grade intercepts at the Cuffley Lode without needing near-term external capital.

    Gold–antimony combinations feature in only a small subset of the 1301 Mining stories and 423 keyword-matched pieces in our coverage, so Costerfield’s grades position Alkane in a relatively niche but strategically important space given antimony’s critical mineral status and limited non-Chinese supply.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners
    Mining
    about 3 hours ago

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners

    McEwen has agreed to sell its Fuller and Paymaster gold properties in Ontario’s Timmins district to Discovery Mining for $55 million in cash and stock, freeing capital to push a production target of 250,000–300,000 gold-equivalent ounces per year by 2030. The deal covers 210 hectares at Fuller, a 60% stake in the 179-hectare Paymaster property, and associated surface rights, consolidating Paymaster under Discovery’s Dome Mine subsidiary. Proceeds will be reinvested into the Fox Complex (Froome, Stock, Grey Fox), Nevada’s Gold Bar Complex, and Mexico’s El Gallo build, with Stock Mine slated for first ore in Q4 2026 and commercial output in Q1 2027.

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams
    Mining
    about 3 hours ago

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams

    South America’s Lithium Triangle holds about 64 million tonnes of identified lithium resources (43% of the global 150 million tonnes), yet geologist José Cabello’s review of 43 salt flats across Argentina, Bolivia and Chile shows that variable brine chemistry, impurities and groundwater behaviour make recovery and costs highly site-specific. Salar de Atacama benefits from ultra‑dry climate, relatively clean brines and strong logistics, while other basins such as Altoandinos, Pedernales, Hombre Muerto Oeste, Rincón, Sal de los Ángeles and Sal de Vida face tighter water and hydrogeological constraints. Direct lithium extraction (DLE) could unlock lower‑grade or impurity‑rich brines, but Cabello stresses that trade‑offs between brine withdrawal and freshwater consumption mean technology selection must be tailored to each basin’s hydrology and ecosystem.

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners
    Mining
    about 3 hours ago

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners

    EU regulators have granted strategic status under the Critical Raw Materials Act to KGHM’s 9.5‑billion‑zloty ($2.44bn) Retków‑Grodziszcze mine and Legnica smelter conversion, unlocking faster permitting, streamlined administration and access to preferential financing. Retków‑Grodziszcze is planned to deliver over 100 million tonnes of ore by 2055, yielding about 1.5 million tonnes of copper and 5,000 tonnes of silver, while Legnica’s recycling line targets 135,000 tonnes of electrolytic copper and 250 tonnes of nickel per year. The move materially boosts EU copper and nickel recycling capacity, central to the CRMA’s 25% recycling target.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental