Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Research
    Projects
    Sustainability

    ABx rare earths grants: leach testwork and project economics for mine planners

    March 20, 2026|

    Reviewed by Joe Ashwell

    ABx rare earths grants: leach testwork and project economics for mine planners

    First reported on Australian Mining

    30 Second Briefing

    ABx Group has secured roles in two Federal Government-backed research initiatives to advance rare earths extraction from its ionic adsorption clay deposits in northern Tasmania and bauxite-hosted resources in Queensland. The grants, awarded under national critical minerals and industry growth programmes, will fund testwork on low-acid leach processes, beneficiation flowsheets and pilot-scale recovery of magnet rare earths such as neodymium and praseodymium. Outcomes could materially affect project economics, tailings chemistry and permitting pathways for clay-hosted rare earths developments in Australia.

    Technical Brief

    • Research includes testwork on low-acid leach chemistries to minimise reagent consumption and aggressive acid use.
    • Beneficiation flowsheet development will examine pre-concentration options to upgrade rare earth grades before leaching.
    • Tailings characterisation will assess how modified leach conditions alter tailings mineralogy, pH and potential contaminants.
    • Outcomes are expected to inform mine design, process plant configuration and tailings storage permitting for clay-hosted rare earths.

    Our Take

    ABx Group’s critical minerals work in Australia links directly to its Deep Leads ionic clay rare earths project in Tasmania, where related coverage in December 2025 highlighted low-acid, ambient-temperature heap leach testwork that could materially lower processing costs versus conventional hard-rock rare earths operations.

    Our database shows only a subset of the 1094 Mining stories and 115 critical minerals pieces involve ionic clay rare earths in Australia, so ABx Group is positioning itself in a relatively uncrowded domestic niche where permitting and ESG narratives can be as important as grade and tonnage.

    The earlier production of a mixed rare earth carbonate sample at Deep Leads, noted in a December 2025 article, suggests ABx Group is already moving along the value chain beyond simple exploration, which can make government grants more likely to target scale-up and commercialisation rather than pure research.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners
    Mining
    about 2 hours ago

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners

    McEwen has agreed to sell its Fuller and Paymaster gold properties in Ontario’s Timmins district to Discovery Mining for $55 million in cash and stock, freeing capital to push a production target of 250,000–300,000 gold-equivalent ounces per year by 2030. The deal covers 210 hectares at Fuller, a 60% stake in the 179-hectare Paymaster property, and associated surface rights, consolidating Paymaster under Discovery’s Dome Mine subsidiary. Proceeds will be reinvested into the Fox Complex (Froome, Stock, Grey Fox), Nevada’s Gold Bar Complex, and Mexico’s El Gallo build, with Stock Mine slated for first ore in Q4 2026 and commercial output in Q1 2027.

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams
    Mining
    about 2 hours ago

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams

    South America’s Lithium Triangle holds about 64 million tonnes of identified lithium resources (43% of the global 150 million tonnes), yet geologist José Cabello’s review of 43 salt flats across Argentina, Bolivia and Chile shows that variable brine chemistry, impurities and groundwater behaviour make recovery and costs highly site-specific. Salar de Atacama benefits from ultra‑dry climate, relatively clean brines and strong logistics, while other basins such as Altoandinos, Pedernales, Hombre Muerto Oeste, Rincón, Sal de los Ángeles and Sal de Vida face tighter water and hydrogeological constraints. Direct lithium extraction (DLE) could unlock lower‑grade or impurity‑rich brines, but Cabello stresses that trade‑offs between brine withdrawal and freshwater consumption mean technology selection must be tailored to each basin’s hydrology and ecosystem.

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners
    Mining
    about 2 hours ago

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners

    EU regulators have granted strategic status under the Critical Raw Materials Act to KGHM’s 9.5‑billion‑zloty ($2.44bn) Retków‑Grodziszcze mine and Legnica smelter conversion, unlocking faster permitting, streamlined administration and access to preferential financing. Retków‑Grodziszcze is planned to deliver over 100 million tonnes of ore by 2055, yielding about 1.5 million tonnes of copper and 5,000 tonnes of silver, while Legnica’s recycling line targets 135,000 tonnes of electrolytic copper and 250 tonnes of nickel per year. The move materially boosts EU copper and nickel recycling capacity, central to the CRMA’s 25% recycling target.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental