Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Hinkley Point C Bylor JV fire notice: compliance lessons for project teams
    Infrastructure
    10 months ago

    Hinkley Point C Bylor JV fire notice: compliance lessons for project teams

    Fire enforcement notice has been served on Bylor JV (Laing O’Rourke and Bouygues Travaux Publics) at Hinkley Point C after ONR inspectors found significant fire safety shortfalls in multiple advanced-stage site buildings, including inadequate general fire precautions and absence of a compliant emergency lighting system. The notice, issued under the Regulatory Reform (Fire Safety) Order 2005, requires improvements to be completed by 30 June 2026, with interim risk controls expected. Bylor is already facing two ONR prosecutions over a November 2022 fatality and an August 2022 rebar mesh wall collapse causing serious injury.

    ACE and Autodesk’s AI in Engineering call: key policy takeaways for UK designers
    Policy
    10 months ago

    ACE and Autodesk’s AI in Engineering call: key policy takeaways for UK designers

    ACE and Autodesk are urging the UK government to develop a national “AI in Engineering” strategy to coordinate deployment of tools such as generative design, automated clash detection and model-based quantity take-off across infrastructure delivery. They argue that a government-led framework is needed to address data standards for BIM models, liability around AI-assisted design decisions and procurement rules for digitally enabled consultancies. For civil and geotechnical engineers, a formal strategy could accelerate adoption of AI for design optimisation, risk analysis and asset management while clarifying regulatory expectations.

    Dogger Bank Wind Farm foundations: design and installation notes for engineers
    Infrastructure
    10 months ago

    Dogger Bank Wind Farm foundations: design and installation notes for engineers

    Dogger Bank offshore wind farm has completed installation of all foundation components, with contractors fitting the final transition piece to bring the total to 277 units across the three phases in the North Sea. The transition pieces, which connect monopile foundations to turbine towers, are critical for tolerances, corrosion protection and access systems in water depths and metocean conditions typical of the central North Sea. Completion of the foundation phase clears the way for full-scale turbine erection and cable hook-up, locking in geotechnical and structural design assumptions for the remaining works.

    Flood risk mitigation and retrofitting: practical design notes for engineers
    Infrastructure
    10 months ago

    Flood risk mitigation and retrofitting: practical design notes for engineers

    Retrofitting existing drainage networks with targeted flood alleviation systems is presented as a cost‑effective way to cut flood damage to roads, bridges and buildings without full asset replacement. Measures such as upsizing critical pipe runs, adding offline attenuation tanks and retrofitting flow‑control devices to manholes can be installed within constrained urban corridors and brownfield sites, often using trenchless techniques to limit traffic disruption. For designers, the key message is to prioritise adaptable, modular components that can be phased in as rainfall data, catchment behaviour and development density evolve.

    Gloucestershire £60M highways framework: delivery and risk notes for project teams
    Infrastructure
    10 months ago

    Gloucestershire £60M highways framework: delivery and risk notes for project teams

    Gloucestershire County Council has launched procurement for a four‑year, multi‑supplier highways construction framework worth an estimated £60M to deliver works across the county’s strategic road network. The framework is expected to bundle major schemes such as carriageway reconstruction, junction upgrades and structures maintenance into call‑off contracts, replacing one‑off tenders to cut programme time and interface risk. Contractors will need capability for traffic management on live A‑roads, drainage and pavement rehabilitation, and coordination with existing term maintenance providers.

    Gravis Robotics funding: autonomous excavators and what it means for earthworks planning
    Infrastructure
    10 months ago

    Gravis Robotics funding: autonomous excavators and what it means for earthworks planning

    Gravis Robotics has raised $23M (£17.4M) and signed commercial agreements to deploy its autonomous excavator and earthmoving control systems across the UK, United States and Europe. The company’s retrofit technology automates standard excavators for tasks such as bulk earthworks and trenching, using sensor suites and software to operate without an in-cab driver. For contractors and clients, the move signals faster adoption of robotic plant on major infrastructure schemes, with implications for site staffing models, machine utilisation and earthworks planning.

    Aecom’s Leamside Line feasibility work: design and staging insights for engineers
    Infrastructure
    10 months ago

    Aecom’s Leamside Line feasibility work: design and staging insights for engineers

    Aecom has been appointed by the North East Combined Authority to undertake new technical and economic feasibility studies for reopening the 34km Leamside Line between Pelaw and Tursdale Junction, a key parallel route to the East Coast Main Line. The work will assess track, signalling and structures requirements for restoring passenger and freight capacity on the currently disused corridor, including potential electrification options and junction upgrades. Outcomes will guide future business case development, funding bids and staging of any phased reconstruction works.

    Cemex £30M HS2 compensation: land valuation and supply-chain lessons for engineers
    Infrastructure
    10 months ago

    Cemex £30M HS2 compensation: land valuation and supply-chain lessons for engineers

    Cemex UK has secured almost £30M in High Court–ordered compensation after land compulsorily purchased for the HS2 rail scheme forced the closure of one of its concrete manufacturing plants. The ruling centres on valuation of industrial land taken for the high-speed line and loss of production capacity from a strategically located ready-mix facility. Contractors relying on HS2-aligned supply chains may face further disruption as similar compensation claims from displaced quarries, batching plants and depots progress.

    Heritage railway bridge collapse: RAIB safety lessons for project engineers
    Infrastructure
    10 months ago

    Heritage railway bridge collapse: RAIB safety lessons for project engineers

    A 19th‑century heritage footbridge in Gloucestershire collapsed when an excavator, incorrectly loaded onto a works train, struck the structure on the Gloucestershire Warwickshire Steam Railway. RAIB found the plant had been positioned too high on a flat wagon by a volunteer with limited competence and no formal loading plan, breaching the line’s own loading rules. The report presses heritage and volunteer‑run railways to adopt formal competence management, documented loading procedures and clearer structural clearance checks for overbridges and footbridges.

    Network Rail West Coast Main Line Christmas works: delivery notes for engineers
    Infrastructure
    10 months ago

    Network Rail West Coast Main Line Christmas works: delivery notes for engineers

    Thousands of Network Rail engineers and contractors will deliver a 22‑day blockade of the West Coast Main Line from 24 December to 15 January for concentrated upgrades between London and the Scottish border. Works are expected to focus on track renewals, signalling and overhead line equipment on key four‑track sections, timed to coincide with the seasonal shutdown to minimise passenger and freight disruption. Geotechnical and civil teams should anticipate intensive access to constrained rail corridors, tight possession windows at junctions, and complex interface management with existing electrification and drainage assets.

    £7.3bn local roads funding: asset management takeaways for engineers
    Infrastructure
    10 months ago

    £7.3bn local roads funding: asset management takeaways for engineers

    Government has committed a “record” £7.3bn in capital funding for local highway maintenance between 2026‑27 and 2029‑30, earmarked for carriageway resurfacing, bridge works and drainage upgrades on council‑managed A, B and unclassified roads in England. Access to funds will be conditional on new transparency rules, including annual publication of network condition data, planned works and actual spend at local authority level. For engineers, the package signals a medium‑term pipeline of pavement rehabilitation, structures maintenance and asset management commissions, but with closer central scrutiny of performance and value for money.

    Greatland’s Havieron feasibility: design and haulage insights for mine planners
    Mining
    10 months ago

    Greatland’s Havieron feasibility: design and haulage insights for mine planners

    Greatland Resources has released a feasibility study for the Havieron gold–copper project in Western Australia’s Paterson Province, confirming a long-life underground operation using bulk stoping beneath the existing Telfer processing hub. The study details a decline-access mine targeting high-grade breccia and sulphide mineralisation, with ore to be trucked to Telfer for treatment through existing crushing, grinding and flotation circuits. For geotechnical and mine planners, the integration with Telfer infrastructure reduces surface footprint and shifts design focus to deep underground stability, paste backfill and haulage optimisation.

    Pilbara Minerals’ new CFO: growth, capex and Pilgangoora signals for engineers
    Mining
    10 months ago

    Pilbara Minerals’ new CFO: growth, capex and Pilgangoora signals for engineers

    Pilbara Minerals has appointed Alex Willcocks as chief financial officer as it pursues “global growth opportunities” for its Pilgangoora lithium operation in Western Australia. The ASX 100 miner, which produced over 600,000 tonnes per annum of spodumene concentrate in recent years, is signalling a stronger focus on capital allocation, downstream partnerships and potential offshore expansion. For mining engineers and project teams, the move points to sustained investment in Pilgangoora expansions, processing upgrades and possible conversion capacity outside Australia.

    MASPRO precision components: reliability and shutdown planning notes for mines
    Mining
    10 months ago

    MASPRO precision components: reliability and shutdown planning notes for mines

    MASPRO is expanding supply of precision-engineered, locally manufactured mining components such as drill rig parts, wear assemblies and hydraulic fittings to reduce downtime and freight delays in Australian operations. The company focuses on tight-tolerance machining, material traceability and rapid turnaround for OEM-equivalent components, aiming to extend service life in high-impact applications like underground development drilling and production stoping. For maintenance and reliability teams, local manufacture reduces lead times, supports planned shutdowns and mitigates supply-chain risk compared with imported spares.

    Gold explorers up their spending: drilling and cost implications for mine teams
    Mining
    10 months ago

    Gold explorers up their spending: drilling and cost implications for mine teams

    Australian gold exploration spending jumped 45 per cent in the 12 months to 30 September, driven by higher budgets for greenfields drilling and resource definition around existing operations. Explorers are targeting both traditional Archean lode systems in Western Australia and emerging intrusion-related prospects in New South Wales, with juniors and mid-tiers lifting metreage on RC and diamond programmes. The uplift signals stronger demand for drilling services, geophysical surveys and resource modelling, with knock-on implications for rig availability, labour costs and access to suitable tailings and water management infrastructure.

    FMS Group–Schlam Cru deal: maintenance consolidation insights for mine operators
    Mining
    10 months ago

    FMS Group–Schlam Cru deal: maintenance consolidation insights for mine operators

    FMS Group has acquired Cru Services (Schlam Cru) and its subsidiary, expanding its integrated maintenance offering across mobile plant, fixed plant and shutdown services for large mining fleets. The deal brings together FMS’ condition monitoring and asset management capabilities with Schlam Cru’s on-site labour, field service and shutdown crews, particularly in Western Australian iron ore operations. For mine operators, the combined business signals further consolidation of maintenance contracts, with potential for bundled service agreements covering everything from haul truck component rebuilds to crusher and conveyor overhauls.

    Midas starts Otavi copper drilling: early geology and M&A signals for mine planners
    Mining
    10 months ago

    Midas starts Otavi copper drilling: early geology and M&A signals for mine planners

    Midas Minerals has started drilling at the Otavi Copper Project in Namibia ahead of completing the acquisition of a 1,776km² licence package, deploying two diamond rigs at the T-13 deposit and one reverse circulation rig at the Spaatzu (Monty) prospect. Historical T-13 intercepts guiding current targeting include 17.2m at 7.24% copper and 144.4g/t silver from 125.8m, and 45m at 2.43% copper and 54.5g/t silver from 193m, as rigs test extensions and continuity. Nearly 2,000 soil samples have been screened by onsite portable XRF, with certified lab assays pending to refine further drilling across Otavi and the South Otavi Project.

    Fast2Mine–Weir integration: fleet data, FMS and MMS takeaways for mine engineers
    Software
    10 months ago

    Fast2Mine–Weir integration: fleet data, FMS and MMS takeaways for mine engineers

    Weir Group has completed its acquisition of Belo Horizonte-based Fast2Mine, adding an open-pit fleet and maintenance management platform that already supports over 85 mines, monitors 7,000+ assets and serves 25,000 daily users across Latin America, Africa, Australia and North America. Fast2Mine joins Micromine, NEXT Intelligent Solutions, MOTION METRICS and Track Pro in Weir’s new Software Solutions group, integrating planning, FMS/MMS, telemetry, analytics and AI, with deployments such as ArcelorMittal’s large iron ore operation in Liberia. Modular products like Mining Control, Maintenance Control, Telemetry Control, MineVERSE and Mining Control BI are designed for rapid, weeks-scale rollout and future semi-autonomous fleet operation.

    Southeast Alaska Tribes vs BC mining projects: legal risk lens for engineers
    Policy
    10 months ago

    Southeast Alaska Tribes vs BC mining projects: legal risk lens for engineers

    Southeast Alaska Indigenous Transboundary Commission has filed a judicial review in the Supreme Court of British Columbia, arguing the province unlawfully denied its 14 member Tribes “Participating Indigenous Nation” status and limited them to notification-only engagement on major mines in the Taku, Stikine and Unuk headwaters. Projects cited include Skeena Gold and Silver’s proposed Eskay Creek open-pit gold mine near the Alaska–Canada border and Newmont’s Red Chris copper-gold mine, one of the first five schemes in Canada’s new Major Projects Office fast-track. The challenge leans on the 2021 R v. Desautel ruling, raising fresh legal risk for transboundary mine approvals and environmental assessments.

    Revizto on Warringah Freeway Upgrade: coordination lessons for civil teams
    Software
    10 months ago

    Revizto on Warringah Freeway Upgrade: coordination lessons for civil teams

    Revizto is being used by Arcadis on the Warringah Freeway Upgrade in New South Wales, one of Australia’s most complex road infrastructure packages, to federate design models and site data into a single digital coordination hub. The cloud-based platform supports clash detection, issue tracking and 3D/2D model viewing across disciplines, enabling designers, constructors and client teams to work off a common data environment in real time. For geotechnical and civil teams, this centralised model management tightens interface control around retaining structures, cut-and-cover works and staging constraints on a heavily trafficked urban corridor.

    Coomera Connector opening: early design and operations notes for road engineers
    Infrastructure
    10 months ago

    Coomera Connector opening: early design and operations notes for road engineers

    Stage One North of Queensland’s Coomera Connector has opened as a four-kilometre, four-lane motorway between Coomera and Helensvale, designated M9 and operating as an alternative north–south route to the congested M1. The new link is designed to divert local and regional traffic from the existing motorway, reducing peak-hour delays and improving incident resilience on the M1 corridor. For designers and contractors, early performance of this initial section will inform pavement, drainage and interchange configurations for subsequent Coomera Connector stages.

    Interface force measurement products: reliability and safety notes for mine engineers
    Mining
    10 months ago

    Interface force measurement products: reliability and safety notes for mine engineers

    Interface is supplying mining and heavy industrial customers with thousands of standard force measurement products each year, including load cells, torque transducers and multi‑axis sensors designed by in‑house engineering specialists. The catalogue covers tension, compression and shear applications across hoists, draglines and conveyor systems, with rugged housings and sealed connectors tailored for dirty, high‑vibration environments. For site engineers, the key value is drop‑in, pre‑engineered instrumentation that simplifies calibration, reduces custom design time and supports more reliable load monitoring on critical lifting and haulage equipment.

    Bravus–Powertech mine sustainability trials: retrofit lessons for site engineers
    Mining
    10 months ago

    Bravus–Powertech mine sustainability trials: retrofit lessons for site engineers

    Bravus Mining & Resources and Powertech Energy are collaborating to cut diesel use and emissions at Bravus’ Queensland coal operations by deploying site-wide energy-efficiency upgrades and alternative power systems for ancillary plant. The partnership is trialling modular hybrid power units and smart load-management controls on non-process infrastructure such as workshops, crib rooms and lighting towers, targeting measurable reductions in fuel burn and generator run-hours. For mine operators, the work provides a template for retrofitting existing sites with containerised power modules and data-driven monitoring rather than large greenfield overhauls.

    Fortescue Pilbara battery storage: design and civil works lens for mine engineers
    Mining
    10 months ago

    Fortescue Pilbara battery storage: design and civil works lens for mine engineers

    Fortescue has delivered a large-scale battery energy storage system to its Pilbara iron ore operations as a key step in decarbonising mine power supply. The installation, supplied as containerised units, is designed to stabilise high-penetration renewable generation and reduce diesel and gas use across remote processing plants and haulage infrastructure. For geotechnical and civil teams, the project signals growing demand for heavy-duty foundations, high-capacity cable corridors and thermal management structures integrated into brownfield mine sites.

    • Previous
    • 1
    • More pages322
    • 323
    • 324
    • More pages335
    • Next
    AllGeotechnicalInfrastructureHazardsEnvironmental