Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Yilgarn Iron–Thiess Koolyanobbing restart: mining and logistics notes for engineers

    May 11, 2026|

    Reviewed by Joe Ashwell

    Yilgarn Iron–Thiess Koolyanobbing restart: mining and logistics notes for engineers

    First reported on Australian Mining

    30 Second Briefing

    Yilgarn Iron has appointed Thiess to restart iron ore production at the Koolyanobbing operations in Western Australia’s Yilgarn region, reviving a site that previously supplied lump and fines to export markets via the Esperance port rail corridor. Thiess is expected to provide contract mining services including drill-and-blast, load-and-haul and ore handling, with a focus on quickly re-establishing pit access, waste stripping and ROM stockpile capacity. The partnership signals renewed demand for mid-grade hematite from smaller Yilgarn deposits, with implications for local rail logistics and port throughput planning.

    Technical Brief

    • For similar brownfield iron ore restarts, contract mining models like this reduce upfront owner capex exposure.

    Our Take

    Thiess’ recent win at Koolyanobbing sits alongside its new Sunday Creek underground contract in Victoria, signalling that the contractor is actively rebuilding a diversified Australian book across both iron ore and hard‑rock metals rather than leaning on a single commodity cycle.

    With Thiess concurrently trialling FLANDERS hybrid diesel‑electric haul trucks and participating in autonomous haulage tests at Mulgarrie, the Koolyanobbing iron ore restart gives it another Western Australian platform where low‑emission or automation initiatives could later be deployed at scale.

    Iron ore is one of the more frequently covered commodities in our mining database, and Yilgarn Iron’s move to restart Koolyanobbing via a contract miner suggests smaller owners are favouring outsourced operational models to stay flexible against price volatility and WA labour cost pressures.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Litus–UWin Nanotech critical minerals JV: flowsheet design notes for engineers
    Mining
    1 day ago

    Litus–UWin Nanotech critical minerals JV: flowsheet design notes for engineers

    Calgary-based Litus has signed a 25 May memorandum of understanding with Taiwan’s UWin Nanotech to jointly develop selective extraction, separation, recovery and purification flowsheets for cobalt, lithium, nickel and other elements from battery recycling and other secondary sources. The collaboration will combine Litus’ LiNC one-step direct lithium extraction platform for low- and high-concentration brines and its ReLiGN battery recycling process with UWin’s hydrometallurgical systems used in Apple-certified e‑waste and Li-ion recycling. Engineers should watch for integrated nanomaterial–hydromet circuits targeting both critical minerals and rare earth elements in circular supply chains.

    Gold price erases 2026 gains: cost-of-carry and project impacts for miners
    Mining
    1 day ago

    Gold price erases 2026 gains: cost-of-carry and project impacts for miners

    Gold fell as much as 3.5% to $4,315/oz, its lowest since March, erasing 2026 gains after a strong US May nonfarm payrolls print pushed Treasury yields and the dollar higher and lifted Fed rate hike odds. US gold futures dropped over 3.2% to $4,342/oz, with CME FedWatch now pricing about a 68% chance of a December hike versus roughly 50% pre-data. Since the Iran war began and the Strait of Hormuz closure drove energy prices up, bullion has slid nearly 18%, raising the cost of carry for non-yielding gold.

    Mining
    1 day ago

    Codelco’s El Teniente Copper & Moly Marks: ESG design notes for mine engineers

    Codelco’s El Teniente Division has secured both The Copper Mark and The Molybdenum Mark after a rigorous independent on-site assessment of its responsible production practices. The international assurance process verified that El Teniente’s policies and operational controls meet high environmental, social and governance criteria, including responsible mineral value chain management. For engineers and project teams, the dual certification signals that future brownfield expansions, tailings management and underground operations at this major Chilean copper–molybdenum complex will be scrutinised against these ESG benchmarks.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental