Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Yilgarn Iron–Thiess Koolyanobbing restart: mining and logistics notes for engineers

    May 11, 2026|

    Reviewed by Joe Ashwell

    Yilgarn Iron–Thiess Koolyanobbing restart: mining and logistics notes for engineers

    First reported on Australian Mining

    30 Second Briefing

    Yilgarn Iron has appointed Thiess to restart iron ore production at the Koolyanobbing operations in Western Australia’s Yilgarn region, reviving a site that previously supplied lump and fines to export markets via the Esperance port rail corridor. Thiess is expected to provide contract mining services including drill-and-blast, load-and-haul and ore handling, with a focus on quickly re-establishing pit access, waste stripping and ROM stockpile capacity. The partnership signals renewed demand for mid-grade hematite from smaller Yilgarn deposits, with implications for local rail logistics and port throughput planning.

    Technical Brief

    • For similar brownfield iron ore restarts, contract mining models like this reduce upfront owner capex exposure.

    Our Take

    Thiess’ recent win at Koolyanobbing sits alongside its new Sunday Creek underground contract in Victoria, signalling that the contractor is actively rebuilding a diversified Australian book across both iron ore and hard‑rock metals rather than leaning on a single commodity cycle.

    With Thiess concurrently trialling FLANDERS hybrid diesel‑electric haul trucks and participating in autonomous haulage tests at Mulgarrie, the Koolyanobbing iron ore restart gives it another Western Australian platform where low‑emission or automation initiatives could later be deployed at scale.

    Iron ore is one of the more frequently covered commodities in our mining database, and Yilgarn Iron’s move to restart Koolyanobbing via a contract miner suggests smaller owners are favouring outsourced operational models to stay flexible against price volatility and WA labour cost pressures.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 18 hours ago

    Schlam installation kit programme: interface control and uptime gains for mines

    Schlam has launched a new in-house engineered installation kit programme for mining truck bodies and excavator buckets, giving sites a standardised, end-to-end package covering attachment supply and fit-out. Developed under a three-year product development effort, the kits are designed to integrate with Schlam’s load and haul attachments, reducing the need for bespoke on-site fabrication and ad hoc hardware selection. For maintenance and asset teams, this points to more predictable installation times, simplified spares management and tighter control of attachment interface geometry.

    Integra’s 74% reserve lift at Florida Canyon: project economics for mine planners
    Mining
    1 day ago

    Integra’s 74% reserve lift at Florida Canyon: project economics for mine planners

    Integra Resources’ updated feasibility study for the Florida Canyon heap leach mine in Nevada lifts proven and probable reserves 74% to 1.1 million oz at 0.31 g/t, raises planned output to 82,000 oz gold per year over eight years, and boosts the 5% NPV to US$601 million using a US$4,200/oz price. All-in sustaining costs climb 43% to US$2,331/oz with recovery steady at 62%, but post-tax free cash flow is projected at US$800 million, averaging US$90 million annually. Integra is drilling 42,500 metres around the existing operation to grow resources and fund its DeLamar gold-silver project in Idaho.

    DRC critical minerals strategy: price-setting and supply risks for mine planners
    Mining
    1 day ago

    DRC critical minerals strategy: price-setting and supply risks for mine planners

    Democratic Republic of Congo has shifted from price-taker to price-setter in cobalt by imposing ARECOMS-managed export quotas and planning state stockpiles of cobalt, coltan and germanium. Cobalt prices have climbed from about $21,000/t in early 2025 to just over $56,000/t, with Kinshasa forecasting $2.3 billion in fiscal revenues this year versus an estimated $617 million without intervention. Advisory input from Vectus Global and new investment moves such as Virtus Minerals’ acquisition of Chemaf signal tighter supply discipline and a push for higher value-added partnerships.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy