Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    XCMG Australia–Wirlu-Murra visit: fleet planning and OEM selection notes for mines

    May 12, 2026|

    Reviewed by Tom Sullivan

    XCMG Australia–Wirlu-Murra visit: fleet planning and OEM selection notes for mines

    First reported on Australian Mining

    30 Second Briefing

    XCMG Australia has hosted a Wirlu-Murra Enterprises delegation from the Pilbara at XCMG Group’s Xuzhou headquarters to deepen collaboration on mining equipment supply and support. The visit centred on large-scale haul trucks, excavators and autonomous-ready fleets for iron ore operations, along with discussions on parts warehousing, technician training and lifecycle service models tailored to remote Western Australian sites. For geotechnical and mining teams, the partnership signals closer integration of Traditional Owner enterprises into OEM selection, site maintenance contracts and long-term fleet planning.

    Technical Brief

    • Engagement model positions Wirlu-Murra for potential roles in site-based maintenance, rebuild centres and logistics support.

    Our Take

    XCMG Australia’s engagement with Wirlu-Murra in the Pilbara sits alongside its push into net-zero mining fleets in our coverage, suggesting the OEM is trying to pair technology sales with visible social licence credentials for Tier 1 iron ore country.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Expander pivot pins: reducing long-term maintenance costs for mine fleets
    Mining
    about 10 hours ago

    Expander pivot pins: reducing long-term maintenance costs for mine fleets

    Hidden costs from traditional pivot pin maintenance on haul trucks, forestry harvesters and excavators are driving interest in Expander System’s oversized pivot pins with tapered sleeves, according to Nord-Lock Group head of sales Robin Persson. The retrofit design allows installation in worn pivot eyes without line boring or welding, using conical sleeves to create full-surface contact and reduce clearance growth. For mine maintenance teams, this can cut repeated pin replacement shutdowns and lower life-cycle costs on high-load joints such as dump body hinges, loader booms and articulation points.

    Canadian Chrome Company First Nations committee: M&A risk notes for project teams
    Mining
    about 10 hours ago

    Canadian Chrome Company First Nations committee: M&A risk notes for project teams

    Canadian Chrome Company has formed a three-person First Nations steering committee, including former Attawapiskat Chief Theresa Okimaw-Hall and former Marten Falls Chief Lawrence Baxter, to advise on its Ring of Fire chromite, nickel, copper and platinum assets in Ontario’s James Bay Lowlands. The committee will provide Indigenous perspectives to prospective buyers or partners ahead of any sale or merger involving CCC’s 90% interest in the Koper Lake project and 30% in the Big Daddy project. Both projects remain at pre‑PFS stage, with no new economic analysis disclosed.

    Boron One Serbia PEA update: economics and design notes for mine planners
    Mining
    about 10 hours ago

    Boron One Serbia PEA update: economics and design notes for mine planners

    Boron One’s updated PEA for the Piskanja underground boron project in southern Serbia lifts the after-tax IRR to 89% and NPV (10% discount) to US$558.8 million, with unchanged initial capex of US$79.9 million and a sub‑one‑year payback, but shortens mine life to 13 years and trims average annual EBITDA to US$87.7 million. The plan now targets average yearly output of 157,600 tonnes of colemanite, 83,800 tonnes of ulexite and 25,000 tonnes of boric acid, at all‑in sustaining costs of US$231.44 per tonne. The revised study incorporates new geotechnical testing, a 3D resource model by borate type and a binding offtake for at least 25,000 tonnes of boron products per year, subject to permitting and plant qualification.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental