Wiluna’s 247g/t gold at Golden Age: stope design and scheduling notes for mine planners
Reviewed by Joe Ashwell

First reported on Australian Mining
30 Second Briefing
Wiluna Mining Corporation has reported underground infill drilling at the Golden Age deposit in Western Australia returning up to 247.78g/t gold, including 2.6m at 45.36g/t from 124m with a 0.5m sub-interval at markedly higher grade. The 27-hole programme targeted mineralisation within existing underground workings, indicating potential for additional high-grade stopes without major new development. For mine planners and geotechs, the results support tighter stope designs and updated resource models focused on short- to medium-term production scheduling.
Technical Brief
- Underground infill programme comprised 27 closely spaced holes within existing Golden Age workings.
- Peak assay reported was 247.78g/t Au from a narrow, very high‑grade sub‑interval.
- Target zone lies within the current Golden Age mining envelope at Wiluna, Western Australia.
- Similar brownfield underground gold operations can leverage infill campaigns to unlock remnant high‑grade panels.
Our Take
Grades above 200g/t in underground gold, as reported at the Golden Age deposit, sit at the extreme high end of intercepts in our gold project coverage and typically underpin very small-footprint, high-margin stopes that can materially improve short-term cashflow even at modest tonnages.
Within the 446 gold-tagged pieces in our database, most Australian underground hits of this tenor are associated with complex narrow-vein geometries, which usually demand tighter geological control and more selective mining methods to avoid dilution and preserve realised head grade.
Western Australian underground gold operations reporting similar high-grade intercepts often use them to justify incremental capital on infill drilling and short-range modelling, signalling that Wiluna Mining Corporation may be positioning Golden Age for near-term mine plan optimisation rather than large-scale expansion.
Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.
Related Articles
Related Industries & Products
Mining
Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.
Tunnelling
Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.
CMRR-io
Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.
HYDROGEO-io
Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.
GEODB-io
Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.