Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Willmott Dixon half-year profit rise: project pipeline insights for engineers

    October 16, 2026|

    Reviewed by Joe Ashwell

    Willmott Dixon half-year profit rise: project pipeline insights for engineers

    First reported on The Construction Index

    30 Second Briefing

    Willmott Dixon reported a 13% rise in underlying profit to £12.5m for the six months to 30 June on flat turnover of £544.8m, supported by £127.3m cash, no debt and a £1.37bn secured order book. By the end of July the contractor had converted £746.7m of new work, 89% as main contracts, including a £92.6m College of North West London campus at Wembley and the £58.1m Mosslands secondary school. Additional awards span affordable housing at Princes Gate in Oldham (£27.7m), Bransbury Park Leisure Centre in Portsmouth (£21.7m), Bath Fire Station (£16.2m) and defence work at Kendrew Barracks.

    Technical Brief

    • Emergency Care Building at Derriford Hospital, Plymouth, reached structural topping-out in September, indicating superstructure completion.
    • By end-July, £746.7m of new work had been secured, predominantly as main contracts for 2027+.
    • College of North West London Wembley campus awarded to Willmott Dixon at £92.6m for United Colleges Group.
    • Mosslands secondary school project for the Department for Education secured at £58.1m contract value.
    • Affordable housing at Princes Gate, Oldham, for Muse procured as a £27.7m design-and-build package.
    • Bransbury Park Leisure Centre, Portsmouth City Council scheme, let on a £21.7m construction contract.
    • Bath Fire Station redevelopment for Avon Fire & Rescue structured as a £16.2m blue-light facilities project.
    • Defence work at Kendrew Barracks extends Willmott Dixon’s secured workload in the defence estate modernisation pipeline.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Strabag’s Pfaffensteig Tunnel contract: design and delivery notes for rail engineers
    Infrastructure
    5 months ago

    Strabag’s Pfaffensteig Tunnel contract: design and delivery notes for rail engineers

    Strabag and Group company Züblin have secured the design-and-build structural works for the ABS Gäubahn Nord/Pfaffensteig Tunnel in south-west Germany, centred on an 11km twin-bore rail tunnel linking Stuttgart Airport station directly to the Gäubahn line towards Switzerland. About 9.8km will be driven by two TBMs, with conventional tunnelling for the A8 motorway undercrossing and airport connection, plus a 240m cut-and-cover section, retaining structures, railway underpasses and a grade-separated crossing. A 3km surface section will be upgraded and partially realigned for 200km/h operation, delivered under an integrated project delivery model with Ed. Züblin, Wayss & Freytag and Strabag AG sharing tunnelling, structural and earthworks packages.

    National Grid TBM under the Thames: tunnelling design and risk notes for engineers
    Infrastructure
    7 months ago

    National Grid TBM under the Thames: tunnelling design and risk notes for engineers

    A 271.5‑tonne Herrenknecht Mixshield TBM, Caroline, has started driving a 2.2km electricity cable tunnel with a 4m internal diameter beneath the River Thames in Essex for National Grid’s Grain to Tilbury project, delivered by the Ferrovial BEMO joint venture. The drive will pass through variable Thames estuary ground conditions between 35m‑deep launch and reception shafts of 15m and 12m diameter, with tunnelling continuing into 2026 and overall scheme completion targeted for 2029. The new tunnel will replace the 1969 Thames Cable Tunnel and carry new high‑voltage circuits between Grain and Tilbury substations.

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers
    Infrastructure
    8 months ago

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers

    A 13.46m diameter Herrenknecht Mixshield TBM has broken through into the future Balboa station on Panama Metro Line 3 after completing the first-ever TBM undercrossing of the Panama Canal at depths exceeding 60m below sea level. The 5,600kW, 26,616kNm machine, fitted with an accessible cutterhead and more than 4,500 sensors linked via the Herrenknecht.Connected platform, has achieved peak advance of 150 segment rings (about 300m) per month through mixed sandstone, tuff, breccias and basalt. Around 1.5km of the 4.5km twin-track tunnel remains to final breakthrough.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.

    AllGeotechnicalInfrastructureHazardsEnvironmental