Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    WA resources sector $34b capex surge: project pipeline signals for engineers

    November 13, 2026|

    Reviewed by Joe Ashwell

    WA resources sector $34b capex surge: project pipeline signals for engineers

    First reported on Australian Mining

    30 Second Briefing

    Western Australia’s resources sector recorded 141,531 full-time equivalent mining jobs and $34.2 billion in investment in 2025–26, the highest capital spend in a decade. Mineral and petroleum sales reached $227 billion, signalling sustained high production across iron ore, LNG and critical minerals operations. For contractors and project engineers, the investment profile points to continued demand for new pits, processing plant upgrades and associated haul roads, ports and rail, with corresponding pressure on labour availability and construction schedules.

    Technical Brief

    • Mineral exploration spend increased alongside capex, signalling more drilling, camp builds and access track works.

    Our Take

    In our database of 1271 Mining stories, Western Australia consistently dominates project and contract coverage, so a multi‑billion‑dollar 2025–26 investment pipeline is likely to keep Perth-based contractors and service providers operating at or near capacity.

    With mineral and petroleum sales in WA projected at well over A$200 billion for 2025–26, operators face mounting pressure to manage water and safety risks at scale, echoing recent Australian Mining coverage of containerised RO water treatment and real-time separation systems from suppliers like Xylem and Aptella.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    43 minutes ago

    EACON’s 4,000-truck AHS milestone: haul road and traffic design notes for mine planners

    EACON has passed 4,000 mining trucks deployed with its ORCASTRA autonomous haulage system (AHS) across Chinese mine sites, more than doubling the fleet count of its nearest competitor. The scale-up, focused on large open-pit coal and iron ore operations using 90–220 t class rigid trucks, signals rapid normalisation of AHS for production haulage rather than limited pilots. For mine planners and OEMs, this volume stresses interoperability, traffic management algorithms, and brownfield haul road design suitable for high-density autonomous fleets.

    Mining
    43 minutes ago

    Tier IV–Komatsu quarry truck autonomy: key design and safety notes for engineers

    Tier IV has started joint development with Komatsu on autonomous driving systems for three quarry-class dump truck models, targeting deployment at quarrying and civil engineering sites in Japan and North America. The work, led through Tier IV subsidiary EARTHBRAIN Inc, builds on a collaboration with Komatsu that began in September 2025 and aims to move beyond mine-haul fleets into smaller, mixed-traffic operations. For operators, the project signals upcoming autonomy options on rigid trucks and articulated dump trucks suited to short-haul quarry cycles and tighter benches.

    Mining
    43 minutes ago

    ALLU high-capacity coal bucket: in-pit processing gains for mine engineers

    ALLU is introducing a new high-capacity coal bucket designed to process coal and associated waste rock, clay and other impurities directly on smaller carrier machines, cutting out separate loading, haulage, crushing and screening stages. By integrating sizing and impurity separation at the face, the attachment targets in-pit coal conditioning where conventional fixed or semi-mobile crushers are impractical or underutilised. The concept is aimed at reducing double-handling, shortening haul distances and enabling more flexible deployment on smaller excavators or loaders in constrained pits and stockyards.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental