Geomechanics.io

  • Free Tools
Sign UpLog In
AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    WA Major Projects Conference 2026: pipeline and delivery insights for engineers

    February 24, 2026|

    Reviewed by Tom Sullivan

    WA Major Projects Conference 2026: pipeline and delivery insights for engineers

    First reported on Roads & Infrastructure (AU)

    30 Second Briefing

    WA Major Projects Conference 2026 will bring government and industry leaders to the Perth Convention and Exhibition Centre on 26–27 March 2026 to examine Western Australia’s next wave of transport, resources and social infrastructure works. The programme, led by the Honourable David Michael MLA, Minister for Mines and Petroleum; Finance; Electoral Affairs, will cover major road and rail corridors, port and logistics upgrades, and enabling works for new mining and energy projects. Geotechnical, civil and materials specialists can expect detail on upcoming tenders, delivery models and long‑term capital pipelines across the state.

    Technical Brief

    • Two-day format (26–27 March 2026) allows sequencing of transport, resources and social infrastructure sessions.
    • Ministerial leadership by David Michael MLA signals direct alignment with Mines, Petroleum, Finance and procurement portfolios.
    • ExpoTrade as organiser typically structures sessions around upcoming capex programs, contract packaging and delivery models.
    • Concentration of “industry leaders and decision makers” supports early contractor involvement and alliance/PPP market sounding.

    Our Take

    Western Australia features heavily in our 738-item Infrastructure category, and Perth-based events such as the WA Major Projects Conference often act as de facto pipeline briefings for upcoming transport, energy and social infrastructure contracts in the state.

    With 2006 tag-matched pieces under ‘Projects’ and ‘Contract Award’, conferences run by organisers like ExpoTrade tend to precede visible waves of tender announcements in our database, suggesting this 2026 edition may flag which WA packages move from planning to procurement over the following 12–24 months.

    Given Western Australia’s outsized share of resources-related infrastructure in our coverage, a Perth-focused forum of this scale is likely to be particularly relevant for contractors and consultants chasing enabling works around ports, rail and regional roads that support mining and energy projects.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers
    Infrastructure
    in 9 months

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers

    A 13.46m diameter Herrenknecht Mixshield TBM has broken through into the future Balboa station on Panama Metro Line 3 after completing the first-ever TBM undercrossing of the Panama Canal at depths exceeding 60m below sea level. The 5,600kW, 26,616kNm machine, fitted with an accessible cutterhead and more than 4,500 sensors linked via the Herrenknecht.Connected platform, has achieved peak advance of 150 segment rings (about 300m) per month through mixed sandstone, tuff, breccias and basalt. Around 1.5km of the 4.5km twin-track tunnel remains to final breakthrough.

    Hudson Tunnel funding deadline: schedule and risk takeaways for project teams
    Infrastructure
    in 8 months

    Hudson Tunnel funding deadline: schedule and risk takeaways for project teams

    Federal funding for New York’s US$16bn Hudson Tunnel Project has been frozen, forcing the Gateway Development Commission to suspend works from 6 February after spending over US$1bn and employing about 1,000 site workers. A Manhattan federal judge has issued a temporary restraining order, giving the administration until 5 p.m. on 12 February to restore reimbursements or appeal, while contractors warn that demobilisation, resequencing and remobilisation will add cost and delay. Sites are now in “safe-pause” mode, with dewatering, ground support and environmental monitoring maintained, and assembly of two Herrenknecht TBMs in New Jersey likely to slip beyond the planned spring 2026 launch without funding certainty.

    Implenia/Marti JV MehrSpur Zurich–Winterthur: design and risk notes for engineers
    Infrastructure
    in 5 months

    Implenia/Marti JV MehrSpur Zurich–Winterthur: design and risk notes for engineers

    Swiss Federal Railways has awarded an Implenia/Marti 50:50 joint venture five of six MehrSpur Zurich–Winterthur lots worth just under CHF 1.7 billion, including the 8.3 km Brüttener tunnel (Lot 240) with twin 10 m diameter single-track tubes and a 1 km spur to Zurich Airport. TBM excavation will start in August 2029, with a roughly ten-year construction phase using BIM for planning and execution and extensive special foundations, earthworks and embankments. Additional works cover full redevelopment of Dietlikon station, about 6 km of new track across Dietlikon and Wallisellen sections, multiple underpasses, bridges and the Neumühle railway bridge and Storchen underpass near Winterthur.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.