Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Product
    Projects

    VEGA radar at Quartzline: level control lessons for materials engineers

    June 15, 2026|

    Reviewed by Tom Sullivan

    VEGA radar at Quartzline: level control lessons for materials engineers

    First reported on Roads & Infrastructure (AU)

    30 Second Briefing

    VEGA’s radar level and point level instruments are being used by Dutch floor screed manufacturer Quartzline in Dordrecht to continuously monitor raw material stocks in silos and storage vessels. Non-contact radar sensors and point level switches provide real-time data on resin, sand and filler levels, allowing tighter batching control and reducing manual silo checks and over-ordering. For materials and plant engineers, the case shows how robust level measurement in abrasive, dusty bulk environments can stabilise mix quality and cut inventory and production downtime.

    Technical Brief

    • Non-contact measurement avoids wear from abrasive aggregates, unlike mechanical probes or guided wave devices.
    • Instrument housings and process fittings are selected for compatibility with polymer resins and fine mineral powders.
    • Maintenance teams now rely on sensor diagnostics rather than physical silo entry for fault-finding and verification.
    • Similar radar-based level schemes are directly transferable to cement, grout and shotcrete batching plants.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Interface 5600 2-Axis Axial Torsion Load Cell: test rig gains for engineers
    Materials
    about 18 hours ago

    Interface 5600 2-Axis Axial Torsion Load Cell: test rig gains for engineers

    The Interface 5600 2-Axis Axial Torsion Load Cell combines compressive force and torsional moment measurement in a single flange-mount transducer, capturing both at the same point for demanding test and measurement rigs. Its compact, multi-axis design reduces fixture complexity compared with separate axial and torque sensors, freeing space around test specimens and simplifying alignment. For mining equipment OEMs and materials labs, the unit supports more accurate characterisation of drill strings, couplings and rotating components under combined loading.

    Siniat plasterboard carbon cuts: EPD data and design implications for engineers
    Materials
    4 days ago

    Siniat plasterboard carbon cuts: EPD data and design implications for engineers

    Drywall manufacturer Siniat has achieved a 5% reduction in carbon intensity across its plasterboard products following a £170m upgrade of its Bristol HQ production line (opened March 2025) and improvements at its Ferrybridge plant, enabling retirement of older, less energy‑efficient equipment. The programme forms part of parent company Etex’s target to cut Scope 1 and 2 emissions by 35% using higher recycled content, lower energy intensity per tonne and a zero‑waste‑to‑landfill approach. Verified Environmental Product Declarations now cover over 86% of Siniat products, giving designers and contractors project‑level carbon data aligned with UK Net Zero Carbon Building Standard reporting.

    Niron $150M iron nitride magnet plant: supply chain signals for materials engineers
    Materials
    6 days ago

    Niron $150M iron nitride magnet plant: supply chain signals for materials engineers

    Niron Magnetics has secured a $150 million loan from the Shakopee Mdewakanton Sioux Community and a conditional $150 million, 20‑year direct loan commitment from the US Department of War’s Office of Strategic Capital to build its first full‑scale iron nitride magnet plant in Sartell, Minnesota. The facility, targeting start-up in 2027, will manufacture rare-earth-free iron nitride permanent magnets, aiming to establish a domestic supply for defence and other critical industries. For materials and mining suppliers, the project signals growing demand for iron-based magnet feedstocks and equipment for end-to-end magnet manufacturing lines.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental