Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Op-Ed
    Projects
    Sustainability

    Tony Gee CEO on UK infrastructure: delivery and risk lessons for civil engineers

    March 25, 2026|

    Reviewed by Tom Sullivan

    Tony Gee CEO on UK infrastructure: delivery and risk lessons for civil engineers

    First reported on New Civil Engineer

    30 Second Briefing

    Tony Gee and Partners chief executive Alasdair Fowler argues that civil engineers must tackle systemic issues in UK infrastructure delivery, including fragmented risk allocation between clients, designers and contractors and short-term procurement focused on lowest capital cost. He calls for earlier contractor involvement, integrated design–build teams and longer-term alliancing frameworks to reduce rework, claims and programme overruns on major schemes such as highways and rail upgrades. Fowler also stresses that better data on whole-life performance and carbon, aligned with NEC contracts, should drive design decisions rather than purely initial cost.

    Technical Brief

    • He notes repeated late-stage design changes on large schemes, often triggered by unresolved ground and utilities risk.
    • Interface risk between civils, systems and permanent way is identified as a major driver of claims.
    • Fowler points to inconsistent client data on existing assets, hampering reliable whole-life performance and carbon assessments.
    • NEC-style collaborative behaviours are said to be undermined when geotechnical and structural designers are novated mid-project.
    • For future UK megaprojects, he argues that stable, multi-year funding settlements are as critical as technical standards.

    Our Take

    Tony Gee and Partners’ leadership commentary sits alongside New Civil Engineer’s recent Heathrow Early Careers Innovation Challenge coverage, signalling that both senior and emerging practitioners are being targeted with messages about changing how UK infrastructure is conceived and delivered.

    Within our 747 Infrastructure stories, New Civil Engineer appears frequently as a convenor of awards and innovation platforms (BCIAs, TechFest), so a 34‑year industry veteran speaking through this channel is likely to influence how systemic delivery issues are framed in award criteria and best‑practice benchmarks.

    For practitioners, the mix of op‑eds like this and New Civil Engineer’s tech‑ and innovation‑focused events in our database suggests that systemic issues in project delivery are increasingly being linked to digital and sustainability performance, rather than treated purely as programme or cost‑control problems.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Strabag’s Pfaffensteig Tunnel contract: design and delivery notes for rail engineers
    Infrastructure
    about 1 month ago

    Strabag’s Pfaffensteig Tunnel contract: design and delivery notes for rail engineers

    Strabag and Group company Züblin have secured the design-and-build structural works for the ABS Gäubahn Nord/Pfaffensteig Tunnel in south-west Germany, centred on an 11km twin-bore rail tunnel linking Stuttgart Airport station directly to the Gäubahn line towards Switzerland. About 9.8km will be driven by two TBMs, with conventional tunnelling for the A8 motorway undercrossing and airport connection, plus a 240m cut-and-cover section, retaining structures, railway underpasses and a grade-separated crossing. A 3km surface section will be upgraded and partially realigned for 200km/h operation, delivered under an integrated project delivery model with Ed. Züblin, Wayss & Freytag and Strabag AG sharing tunnelling, structural and earthworks packages.

    National Grid TBM under the Thames: tunnelling design and risk notes for engineers
    Infrastructure
    3 months ago

    National Grid TBM under the Thames: tunnelling design and risk notes for engineers

    A 271.5‑tonne Herrenknecht Mixshield TBM, Caroline, has started driving a 2.2km electricity cable tunnel with a 4m internal diameter beneath the River Thames in Essex for National Grid’s Grain to Tilbury project, delivered by the Ferrovial BEMO joint venture. The drive will pass through variable Thames estuary ground conditions between 35m‑deep launch and reception shafts of 15m and 12m diameter, with tunnelling continuing into 2026 and overall scheme completion targeted for 2029. The new tunnel will replace the 1969 Thames Cable Tunnel and carry new high‑voltage circuits between Grain and Tilbury substations.

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers
    Infrastructure
    4 months ago

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers

    A 13.46m diameter Herrenknecht Mixshield TBM has broken through into the future Balboa station on Panama Metro Line 3 after completing the first-ever TBM undercrossing of the Panama Canal at depths exceeding 60m below sea level. The 5,600kW, 26,616kNm machine, fitted with an accessible cutterhead and more than 4,500 sensors linked via the Herrenknecht.Connected platform, has achieved peak advance of 150 segment rings (about 300m) per month through mixed sandstone, tuff, breccias and basalt. Around 1.5km of the 4.5km twin-track tunnel remains to final breakthrough.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy