Geomechanics.io

  • Free Tools
Sign UpLog In
AllMiningInfrastructureMaterialsPolicy

Geomechanics.io

Geomechanics, Simplified.

© 2025 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsRelease NotesBlog

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Construction
    Ground Engineering
    Contract Award
    Sustainability

    Timber consolidator set for break up

    November 17, 2025
    Timber consolidator set for break up

    First reported on The Construction Index

    30 Second Briefing

    National Timber Group, Britain's largest timber merchant, is on the brink of breaking up as it faces insolvency, with notices of intent to appoint administrators filed for each part of the group. Established by Cairngorm Capital in 2018, the group consolidated several timber companies, including Thornbridge and Arnold Laver, but reported a pre-tax loss of £6.3 million on a £197 million turnover for 2023. Now controlled by Sylvan Span and led by CEO Mark Dixon, the group is in advanced talks to sell substantial parts of its business while seeking additional funding to stabilise operations.

    Technical Brief

    • National Timber Group, Britain's largest timber merchant, faces potential break-up due to insolvency risks, with administrators potentially being appointed.
    • Established in 2018 by Cairngorm Capital, the group consolidated multiple timber companies, including Thornbridge and Arnold Laver.
    • The group reported a pre-tax loss of £6.3 million on a £197 million turnover for 2023, highlighting financial instability.
    • Advanced talks are underway to sell significant parts of the business, with interim moratoriums preventing creditor enforcement.
    • Efforts to stabilise include cost reduction measures and seeking additional funding, reflecting liquidity challenges in the timber sector.
    • Notices of intent to appoint administrators have been filed for each entity within the group, providing temporary protection.
    • The group's restructuring aims to ensure continued operations and explore strategic options for business continuity.
    • Industry context: The timber sector faces challenging trading conditions, impacting liquidity and operational stability.
    • For further updates, stakeholders are advised to monitor developments as the group navigates potential sales and funding opportunities.

    Context From Recent Coverage

    • National Timber Group's pre-tax loss of £6.3 million for 2023, despite a turnover of £197 million, suggests financial pressures that might influence strategic decisions, such as the potential break-up mentioned in the article.
    • With only a small cluster of infrastructure-related pieces in the last 90 days, the timber sector's financial challenges may not be widely covered, highlighting the significance of National Timber Group's situation in the current market landscape.

    Related Articles

    Let’s Talk Slope Stabilisation
    Infrastructure
    about 19 hours ago

    Let’s Talk Slope Stabilisation

    Aarsleff Ground Engineering has implemented diverse slope stabilisation solutions across three UK sites, addressing unique challenges with tailored techniques. In Alnwick, 57.6m of driven steel sheet piles were installed using a silent press to stabilise a slope near historic buildings, while in Tynemouth, a 10m deep contiguous pile wall with a 120-year design life was constructed to secure a cliff face at King Edwards Bay. In Northampton, an 80m soil nailed solution with R32 hollow threadbars was deployed to stabilise a failing reinforced soil wall, overcoming buried service clashes through detailed 3D visualisation.

    Dubai developer takes over £2.5bn Royal Docks scheme
    Infrastructure
    about 21 hours ago

    Dubai developer takes over £2.5bn Royal Docks scheme

    Dubai-based developer Arada has acquired an 80% stake in the £2.5bn Thameside West development at London's Royal Docks, marking its second major investment in the city's residential market. The Foster & Partners masterplan includes at least 5,000 residential apartments over 47 acres, with 1,000 homes in the first phase starting construction in 2027. The project, featuring a kilometre of waterfront and extensive green spaces, aims to transform the former industrial site into a connected, sustainable neighbourhood with 35% affordable housing.

    O’Brien moves from earthworks to infrastructure at Fairham
    Infrastructure
    about 21 hours ago

    O’Brien moves from earthworks to infrastructure at Fairham

    O’Brien Contractors has commenced the infrastructure phase at the 606-acre Fairham development in Nottinghamshire, following the completion of major earthworks ahead of schedule. This £100 million investment, led by Clowes Developments and Homes England, will support the construction of 3,000 homes and over a million square feet of employment space. The current phase involves installing essential infrastructure such as highways, drainage, and utilities, including water, gas, electricity, and telecoms, while coordinating with local councils and National Highways to minimise transport disruption.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.