Thames Water White Horse Reservoir DCO: design and risk notes for engineers
Reviewed by Joe Ashwell

First reported on New Civil Engineer
30 Second Briefing
Thames Water has submitted a development consent order for the £7bn White Horse Reservoir, a proposed 150bn litre raw water storage scheme south-west of Abingdon in Oxfordshire. The strategic reservoir would be one of the UK’s largest, implying major earthworks, long embankment sections and extensive cut‑off and drainage systems on lowland geology. For civil and geotechnical teams, the scale points to significant dam engineering, seepage control, and long-distance pipeline and tunnel connections into the regional supply network.
Technical Brief
- For other large UK water-resource schemes, the DCO pathway is becoming the default consenting mechanism for regional-scale assets.
Our Take
The £7bn White Horse Reservoir sits alongside a separate £5.7bn main works tender already in our coverage, signalling that Thames Water is effectively committing a multi‑billion, multi‑package capital programme around this single asset rather than a standalone scheme.
Recent drought coverage in London and the Thames Valley in our database, with Farmoor and Queen Mary reservoirs below long‑term averages, suggests the Abingdon/Oxfordshire location is being chosen to diversify storage away from already stressed existing impoundments.
Taken with Thames Water’s concurrent £150M–£65M wastewater upgrade packages with Costain and Kier, the DCO move indicates the utility is trying to lock in a long pipeline of civils work across the Thames Valley, which may influence contractor capacity and pricing for large earthworks and reservoir engineering in the region.
Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.
Related Articles
Related Industries & Products
Construction
Quality control software for construction companies with material testing, batch tracking, and compliance management.
Tunnelling
Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.
CMRR-io
Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.
HYDROGEO-io
Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.
GEODB-io
Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.


