Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Standard/Guideline
    Safety

    Tailings 2026 in Chile: design, monitoring and closure takeaways for engineers

    September 3, 2026|

    Reviewed by Tom Sullivan

    Tailings 2026 in Chile: design, monitoring and closure takeaways for engineers

    First reported on International Mining – News

    30 Second Briefing

    Tailings 2026 in Santiago, Chile, will convene more than 160 technical presentations from practitioners and researchers across 18 countries on tailings storage facility design, monitoring and closure. Topics flagged by Katie Kruger, Manager of Tailings, Crushed Leach, include applying the Global Industry Standard on Tailings Management, integrating real-time instrumentation and remote sensing, and improving beach slope control and seepage management. Engineers can expect detailed case studies on upstream, downstream and centreline facilities, filtered tailings, and risk-based governance frameworks directly applicable to active and legacy sites.

    Technical Brief

    • Tailings 2026 is scheduled for Santiago, Chile, providing direct context for Andean and seismic TSF design.
    • Over 160 technical presentations indicate broad coverage of failure modes, monitoring regimes and closure strategies.
    • Contributions from 18 countries enable comparison of regulatory expectations and safety factors across multiple jurisdictions.
    • Manager of Tailings, Crushed Leach, Katie Kruger, signals strong operator-side input rather than purely academic content.

    Our Take

    International Mining also features prominently in coverage of IMARC and the World Mining Congress 2026, signalling that Tailings 2026 in Chile is being positioned alongside the major global forums where ESG, safety and standards are being shaped rather than as a niche technical event.

    With more than 160 presentations and authors from 18 countries, Tailings 2026 looks comparable in scale to other flagship gatherings in our database, which typically becomes a de facto venue for stress-testing new tailings guidelines before they are referenced in corporate standards and lender due-diligence frameworks.

    Chile’s role as host aligns with our broader mining coverage, where the country frequently appears in safety- and standards-tagged pieces; this suggests that practices discussed at Tailings 2026 are likely to influence regulatory expectations for tailings facilities across the Andean region in particular.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Meeka hits nameplate at Andy Well: throughput and ore sorting lens for planners
    Mining
    about 3 hours ago

    Meeka hits nameplate at Andy Well: throughput and ore sorting lens for planners

    Meeka Metals has reached its nameplate 600,000 tonnes per annum processing rate at the Andy Well gold operation in Western Australia, with the plant running at an annualised ~600ktpa through July and August and recording higher peak throughput over the period. An ore sorter is scheduled for commissioning in October, targeting higher feed grades and reduced mill load by rejecting low-grade material ahead of the existing circuit. For plant and mine planners, stable operation at nameplate before adding pre-concentration reduces ramp-up risk and supports more predictable metallurgical performance.

    Greenland Mines’ Sarfartoq rare earth acquisition: NPV, IRR and mine plan lens
    Mining
    about 3 hours ago

    Greenland Mines’ Sarfartoq rare earth acquisition: NPV, IRR and mine plan lens

    Greenland Mines has closed its US$35 million acquisition of the Sarfartoq rare earth project from Neo Performance Materials, securing a carbonatite-hosted NdPr deposit near Kangerlussuaq, about 60 km from Greenland’s main international airport. An independent Initial Assessment on the ST1 deposit alone, which occupies under 1% of the 191 km² licence, reports a pre-tax NPV of ~US$2.05 billion and IRR of 118.6%, based on Indicated and Inferred resources and a nine-year mine plan. The company plans immediate infill drilling, pilot-scale metallurgical test work, mine engineering and expanded environmental and social baseline studies to advance to pre-feasibility.

    Maritana’s Boorara drilling and 2027 restart: planning insights for mine engineers
    Mining
    about 3 hours ago

    Maritana’s Boorara drilling and 2027 restart: planning insights for mine engineers

    Maritana Minerals has completed over 17,000m of reverse-circulation drilling in 119 holes at the Boorara gold project near Kalgoorlie, progressing it as the first planned ore source for the Black Swan processing hub ahead of a targeted mid-2027 restart. The campaign focuses on resource conversion and was run in parallel with grade-control drilling to tighten pre-production mine planning. For geotechnical and mine design teams, the dense drilling grid should materially refine orebody geometry, grade continuity and pit optimisation for the initial restart phase.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental