Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Sustainability

    Sulphur shortage and Indonesia’s nickel HPAL projects: risk lens for mine planners

    November 26, 2026|

    Reviewed by Joe Ashwell

    Sulphur shortage and Indonesia’s nickel HPAL projects: risk lens for mine planners

    First reported on MINING.com

    30 Second Briefing

    A sulphur shortage following the closure of the Strait of Hormuz threatens Indonesian high-pressure acid leach projects that would add more than 600,000 tonnes of nickel capacity, with sulphur imports down 29% year-on-year in H1 2026 and prices nearly tripling. Sulphur, which the IEA says makes up roughly half of HPAL operating costs, is being squeezed by competition from fertiliser producers, limiting supply for battery-grade nickel and cobalt extraction. At the same time, drought has forced 30%–45% production cuts at smelters in the Indonesia Morowali Industrial Park and falling ore grades are pushing stainless mills towards more pure nickel and scrap, now about 25% of feed.

    Technical Brief

    • Middle East previously supplied ~80% of Indonesia’s sulphur imports before the Strait of Hormuz closure.
    • Wood Mackenzie warns sulphur logistics normalisation will lag even if conflict disruptions ease.
    • Fertiliser sector demand is constraining reallocation of sulphur volumes to HPAL and other industrial users.
    • Indonesian HPAL plants convert sulphur to sulphuric acid for leaching nickel and cobalt into mixed hydroxide precipitate.
    • Indonesia produced an estimated 2.6 Mt nickel in 2025, about two-thirds of global mine output.
    • Drought at Indonesia Morowali Industrial Park cut smelter output 30%–45% as process water and coal barging faltered.
    • Falling ore grades are reducing nickel pig iron output, pushing stainless mills towards higher-purity nickel units.
    • Scrap now contributes ~25% of stainless steel feed, up from roughly 21%–22% a few years ago.
    • Wood Mackenzie expects refined cobalt consumption to decline this year despite battery-sector growth narratives.
    • London Metal Exchange cash nickel settled at US$15,060/t on the referenced Tuesday, framing current price risk.

    Our Take

    Wood Mackenzie has been a recurring source across our recent coverage, from AI-driven metals demand to China’s battery-metal build-out, which suggests its warning on sulphur constraints for Indonesia’s nickel sector will likely be taken seriously by financiers screening long-life laterite projects.

    The earlier piece linking $100/bbl Brent to higher sulphur and sulphuric acid costs indicates that Indonesia’s sulphur squeeze is not just a logistics issue via the Strait of Hormuz but also ties directly into global energy price volatility, complicating cost forecasts for high-acid leach flowsheets.

    With Indonesia already a focal point in our nickel and cobalt coverage tied to AI and battery demand, any sustained sulphur import decline of the scale reported here could push stainless and battery supply chains to lean harder on scrap and non-Indonesian feed, potentially reshaping regional cost curves.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 1 hour ago

    Jiangxi Siton at bauma CHINA 2026: underground fleet takeaways for mine engineers

    Jiangxi Siton is using bauma CHINA 2026 to showcase six underground models, signalling its push beyond China where it already supplies Latin American and Central Asian mines. The company, a key supplier to Jiangxi Copper and other major Chinese mining houses, is positioning its drilling, loading and haulage equipment for both hard rock and coal operations. For engineers, the message is that Chinese OEMs with proven export fleets are now credible alternatives to established Western brands for new underground project tenders and fleet renewals.

    Price floors for rare earth projects beyond China: financing lens for engineers
    Mining
    about 2 hours ago

    Price floors for rare earth projects beyond China: financing lens for engineers

    Western buyers are paying extreme premiums for rare earth oxides as China’s export controls bite, with high‑purity yttrium oxide at about US$1,650/kg in North America versus roughly US$9/kg in China and dysprosium oxide in Europe at about US$4,875/kg, around 22 times the Chinese price. Sprott’s Paul Wong and Jacob White argue that long‑term offtake contracts with price floors, such as MP Materials’ 10‑year US DoD deal at US$110/kg for NdPr and Lynas’ March 2025 floor agreement with JARE, are becoming critical to debt financing new separation and refining capacity. Equity markets remain weak, with the Sprott Rare Earths Ex‑China ETF down 30% since 30 September despite over US$100 million of net inflows, pushing developers towards structured contracts and, in cases like South Africa’s Steenkampskraal, staged lab‑to‑pilot separation trials with partners such as Remedy Metals.

    Kazatomprom bribery probe: operational and project risk notes for mine planners
    Mining
    about 2 hours ago

    Kazatomprom bribery probe: operational and project risk notes for mine planners

    Kazakhstan’s anti-corruption service has detained Kazatomprom operations chief Kuanysh Omarbekov in a widening bribery probe linked to former leaders of sovereign wealth fund Samruk-Kazyna, which controls 63% of the world’s largest uranium miner and managed $88 billion in assets at end-2025. Kazatomprom, whose operations are expected to yield 27,500–29,000 tonnes of uranium in 2026 (14,500–15,500 tonnes attributable), has removed Omarbekov and chief commercial officer Vladislav Baiguzhin, while insisting production and commercial teams remain intact. The investigation comes as Kazatomprom’s global depositary receipts fell nearly 10% in London to $49.80, and as Canadian partner Cameco advances 2026 deliveries from the Inkai mine totalling 10.4 million lb. U3O8.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental