Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Op-Ed

    Stock market bear trend: cross-asset signals and risks for mining investors

    November 24, 2026|

    Reviewed by Tom Sullivan

    Stock market bear trend: cross-asset signals and risks for mining investors

    First reported on MINING.com

    30 Second Briefing

    Technical analyst Chris Vermeulen of The Technical Traders argues that a true equity bear market requires at least a 20% drawdown plus an extended period of “price damage”, and says current conditions do not yet meet that threshold. He contends gold, silver and mining equities have been in a bear phase since early 2026 and warns that a broader stock market downturn would likely drag metals lower rather than provide a safe haven. Vermeulen urges precious metals investors to prioritise cross-asset price action, sentiment and capital flows over bullish narratives or FOMO, calling price “the ultimate indicator”.

    Technical Brief

    • Vermeulen defines a formal equity bear market mechanically as a minimum 20% index drawdown.
    • He stresses that time-in-market is a second requirement, needing prolonged “price damage”, not a fast dip.
    • Cross-asset confirmation is central to his method: he tracks flows between equities, metals and other classes.
    • Narrative-only theses are rejected; he requires bullish stories to be validated by trend reversals and breakouts.

    Our Take

    The early‑2026 bear‑trend horizon for equities in this Technical Traders op‑ed sits against our coverage of a 26% drawdown in the MINING.COM TOP 50 by late 2026, suggesting that gold and silver producers may still be in the middle, not the end, of an equity repricing cycle.

    Another op‑ed in August 2026 from Momentum Structural Analysis argued for a ‘furious’ six‑ to 12‑month move led by silver, so this piece’s bear‑market framing gives project developers and Top of Mine readers a useful contrast between equity‑market risk and bullish monetary‑metal narratives.

    With 475 keyword‑matched pieces on gold and silver in our database, this analysis is part of a dense cluster of monetary‑metal commentary, which can help operators benchmark their own price and financing assumptions against a wide range of cycle views rather than a single forecast.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Waratah’s shallow Goldenclad hit: open-pit potential and drilling notes for mine planners
    Mining
    about 2 hours ago

    Waratah’s shallow Goldenclad hit: open-pit potential and drilling notes for mine planners

    Waratah Minerals has reported a standout diamond drill intercept of 10m at 12.18g/t Au from 49m depth within a broader 17m interval at 7.35g/t at the Goldenclad prospect in New South Wales. The mineralisation in hole GCD002 occurs at relatively shallow depths, materially improving open-pit potential and drill economics compared with typical deeper lode targets in the region. Results support Waratah’s strategy to grow the existing Spur gold project resource footprint, with follow-up drilling likely to focus on lateral continuity and down-dip extensions of the high-grade zone.

    PC Gold’s $1.59bn Spring Hill plan: mine design and risk notes for engineers
    Mining
    about 2 hours ago

    PC Gold’s $1.59bn Spring Hill plan: mine design and risk notes for engineers

    PC Gold’s pre-feasibility study for the Spring Hill project in the Northern Territory sets out a $1.59 billion pre-tax valuation and a maiden 951,000-ounce gold ore reserve, supporting a standalone open-pit and underground operation. The plan targets production of about 1.03 million ounces of gold over an initial 9.5-year mine life, implying moderate-scale processing and sustained ore delivery from both surface and underground stopes. Geotechnical design will need to accommodate long-term pit wall stability and underground access sequencing over nearly a decade of concurrent operations.

    Gateway Panakin fresh-rock gold hit: targeting depth potential for mine planners
    Mining
    about 2 hours ago

    Gateway Panakin fresh-rock gold hit: targeting depth potential for mine planners

    Gateway Mining has intersected fresh-rock gold grading 1m at 16.5g/t from recent aircore drilling at the Panakin prospect within its Yandal gold project in Western Australia. The mineralisation occurs beneath transported cover, indicating untested fresh-rock potential beyond the existing regolith anomalies that have guided earlier programmes. For explorers and resource modellers, the result suggests scope for higher-grade lodes at depth and justifies follow-up RC or diamond drilling to define geometry, continuity and potential open-pit or underground development scenarios.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental