Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Sustainability

    Sphere’s One Eastside handover to PIC: design and sustainability notes for engineers

    August 5, 2026|

    Reviewed by Tom Sullivan

    Sphere’s One Eastside handover to PIC: design and sustainability notes for engineers

    First reported on The Construction Index

    30 Second Briefing

    Sphere has completed and handed over One Eastside, a 51-storey build-to-rent tower and Birmingham’s tallest skyscraper, to Pension Insurance Corporation, delivering 667 rental apartments plus co-working and amenity space on a remediated brownfield site. Construction used £15.7m of locally sourced materials, created 87 local jobs and 11 apprenticeships, with 61% of labour drawn from the surrounding area. The scheme incorporates new green space, on-site renewable energy infrastructure and the planting of 620 trees under the One Eastside Forest initiative to offset resident move-in emissions.

    Technical Brief

    • Brownfield plot previously housed a chemical engineering and advanced chemistry teaching facility for Birmingham Metropolitan College.
    • Annual economic value from the scheme is reported at £33.5m, supporting the local urban economy.
    • Local supply chain engagement included £15.7m spend on locally sourced construction materials.
    • Workforce strategy created 87 local jobs and 11 apprenticeships, with 61% of labour sourced nearby.
    • Environmental measures extend beyond on-plot green space to a 620-tree “One Eastside Forest” planting initiative.
    • Renewable energy infrastructure is integrated on site, reducing operational grid demand for a high-rise residential load profile.
    • Model demonstrates how tall build-to-rent towers can be used as anchors for local skills and supply-chain development.

    Our Take

    Within our 920 Infrastructure stories, very few UK schemes combine this scale of residential tower with quantified social value metrics like 61% local labour and 11 apprenticeships, signalling that One Eastside is being positioned as a benchmark for ‘measured’ community benefit in high‑rise delivery.

    Planting 620 trees under the One Eastside Forest initiative goes beyond typical Section 106‑style greening in our UK coverage and indicates that large private residential towers are starting to mirror institutional ESG frameworks, which may influence future investor requirements on similar schemes.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Strabag’s Pfaffensteig Tunnel contract: design and delivery notes for rail engineers
    Infrastructure
    3 months ago

    Strabag’s Pfaffensteig Tunnel contract: design and delivery notes for rail engineers

    Strabag and Group company Züblin have secured the design-and-build structural works for the ABS Gäubahn Nord/Pfaffensteig Tunnel in south-west Germany, centred on an 11km twin-bore rail tunnel linking Stuttgart Airport station directly to the Gäubahn line towards Switzerland. About 9.8km will be driven by two TBMs, with conventional tunnelling for the A8 motorway undercrossing and airport connection, plus a 240m cut-and-cover section, retaining structures, railway underpasses and a grade-separated crossing. A 3km surface section will be upgraded and partially realigned for 200km/h operation, delivered under an integrated project delivery model with Ed. Züblin, Wayss & Freytag and Strabag AG sharing tunnelling, structural and earthworks packages.

    National Grid TBM under the Thames: tunnelling design and risk notes for engineers
    Infrastructure
    5 months ago

    National Grid TBM under the Thames: tunnelling design and risk notes for engineers

    A 271.5‑tonne Herrenknecht Mixshield TBM, Caroline, has started driving a 2.2km electricity cable tunnel with a 4m internal diameter beneath the River Thames in Essex for National Grid’s Grain to Tilbury project, delivered by the Ferrovial BEMO joint venture. The drive will pass through variable Thames estuary ground conditions between 35m‑deep launch and reception shafts of 15m and 12m diameter, with tunnelling continuing into 2026 and overall scheme completion targeted for 2029. The new tunnel will replace the 1969 Thames Cable Tunnel and carry new high‑voltage circuits between Grain and Tilbury substations.

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers
    Infrastructure
    6 months ago

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers

    A 13.46m diameter Herrenknecht Mixshield TBM has broken through into the future Balboa station on Panama Metro Line 3 after completing the first-ever TBM undercrossing of the Panama Canal at depths exceeding 60m below sea level. The 5,600kW, 26,616kNm machine, fitted with an accessible cutterhead and more than 4,500 sensors linked via the Herrenknecht.Connected platform, has achieved peak advance of 150 segment rings (about 300m) per month through mixed sandstone, tuff, breccias and basalt. Around 1.5km of the 4.5km twin-track tunnel remains to final breakthrough.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy