Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    SpectraFlow analyser at Conglin iron ore mine: process control gains for engineers

    May 4, 2026|

    Reviewed by Tom Sullivan

    SpectraFlow analyser at Conglin iron ore mine: process control gains for engineers

    First reported on International Mining – News

    30 Second Briefing

    SpectraFlow Analytics has secured an order from Conglin Group for a SpectraFlow Crossbelt Analyser at an iron ore operation in Xinjiang, Western China, extending its installed base beyond existing systems in Brazil and other major iron ore regions. The online analyser, mounted directly over the conveyor, provides continuous, real-time ore quality measurements, enabling tighter control of grade variability before the plant. For process and mine engineers, this supports more stable feed to crushers and mills, improved blending strategies and reduced reliance on periodic belt or stockpile sampling.

    Technical Brief

    • Online analyser deployment at Conglin follows earlier iron ore installations in Brazil and other global operations.

    Our Take

    Iron ore pieces in our database increasingly feature online and in-pit sensing, suggesting Conglin Group’s Xinjiang operation is aligning with a wider move among Chinese producers to tighten grade control and reduce variability in feed to mills.

    Xinjiang iron ore mines tend to be far from coastal steel hubs, so improved real-time analysis can help Conglin optimise blending and transport from Western China, which is typically more logistics‑constrained than coastal operations importing Brazilian ore.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 8 hours ago

    Schlam installation kit programme: interface control and uptime gains for mines

    Schlam has launched a new in-house engineered installation kit programme for mining truck bodies and excavator buckets, giving sites a standardised, end-to-end package covering attachment supply and fit-out. Developed under a three-year product development effort, the kits are designed to integrate with Schlam’s load and haul attachments, reducing the need for bespoke on-site fabrication and ad hoc hardware selection. For maintenance and asset teams, this points to more predictable installation times, simplified spares management and tighter control of attachment interface geometry.

    Integra’s 74% reserve lift at Florida Canyon: project economics for mine planners
    Mining
    about 21 hours ago

    Integra’s 74% reserve lift at Florida Canyon: project economics for mine planners

    Integra Resources’ updated feasibility study for the Florida Canyon heap leach mine in Nevada lifts proven and probable reserves 74% to 1.1 million oz at 0.31 g/t, raises planned output to 82,000 oz gold per year over eight years, and boosts the 5% NPV to US$601 million using a US$4,200/oz price. All-in sustaining costs climb 43% to US$2,331/oz with recovery steady at 62%, but post-tax free cash flow is projected at US$800 million, averaging US$90 million annually. Integra is drilling 42,500 metres around the existing operation to grow resources and fund its DeLamar gold-silver project in Idaho.

    DRC critical minerals strategy: price-setting and supply risks for mine planners
    Mining
    about 21 hours ago

    DRC critical minerals strategy: price-setting and supply risks for mine planners

    Democratic Republic of Congo has shifted from price-taker to price-setter in cobalt by imposing ARECOMS-managed export quotas and planning state stockpiles of cobalt, coltan and germanium. Cobalt prices have climbed from about $21,000/t in early 2025 to just over $56,000/t, with Kinshasa forecasting $2.3 billion in fiscal revenues this year versus an estimated $617 million without intervention. Advisory input from Vectus Global and new investment moves such as Virtus Minerals’ acquisition of Chemaf signal tighter supply discipline and a push for higher value-added partnerships.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy