Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Solvay–Viridis rare earths deal: clay-hosted REE lessons for project engineers

    June 1, 2026|

    Reviewed by Tom Sullivan

    Solvay–Viridis rare earths deal: clay-hosted REE lessons for project engineers

    First reported on International Mining – News

    30 Second Briefing

    Solvay has signed a Letter of Intent with Viridis Mining and Minerals to process Brazilian rare earth materials at its La Rochelle plant in France, targeting a strategic supply by 2028 to bolster non-Chinese feedstock. The agreement centres on Viridis’ ionic clay rare earth projects in Brazil, with Solvay providing separation and refining capacity at an established solvent-extraction and roasting facility. For project developers, the move signals continued demand for clay-hosted REE resources and reinforces the importance of downstream-compatible mineralogy and impurity control in new deposits.

    Technical Brief

    • For other clay-hosted REE projects, compatibility with existing solvent-extraction circuits is becoming a critical design and metallurgical test criterion.

    Our Take

    Solvay already appears in our rare earths coverage as one of a small group of non-Chinese processors, so bringing Brazilian feed into the La Rochelle plant reinforces a Europe-based processing route at a time when China still controls almost all global refining capacity, as noted in the 2026-05-25 rare earth dominance piece.

    Brazil is emerging repeatedly in our database as a key rare earths source country, including the proposed USA Rare Earth–Serra Verde transaction now under antitrust review (2026-05-12), so Viridis’ material being processed in France suggests more Brazilian-origin rare earths may be locked into Western downstream supply chains rather than shipped to Asia.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Brightstar’s 305m gold hit at Two Mile Hill: bulk underground potential for engineers
    Mining
    about 8 hours ago

    Brightstar’s 305m gold hit at Two Mile Hill: bulk underground potential for engineers

    Brightstar Resources has reported its largest Sandstone result at the Two Mile Hill deposit in WA, intersecting 305m at 2.66g/t gold from 503m depth in diamond hole TMHDD26005. The interval contains multiple high-grade zones, including 4.1m at 26.1g/t, 5.5m at 25.2g/t and 4m at higher-grade material within the broader mineralised envelope. The scale and continuity of this intercept materially upgrade the grade-times-width profile of Two Mile Hill, supporting potential for bulk underground mining scenarios and further deep drilling.

    BHP record WA community spend: procurement signals for mining contractors
    Mining
    about 8 hours ago

    BHP record WA community spend: procurement signals for mining contractors

    BHP has reported a record $1.1 billion in community expenditure across Western Australia for FY2026, including $627 million in procurement from Indigenous and Traditional Owner businesses. The miner’s 2026 Western Australia Community Development Report also details more than $850 million in payments to local suppliers, councils and community partners, signalling a heavy regional spend alongside its iron ore and nickel operations. For contractors and service providers, the scale of Indigenous and local sourcing points to strong demand for WA-based capability and joint ventures.

    AIC Mines’ 18.7Mt Mt Cuthbert copper project: planning signals for mine engineers
    Mining
    about 8 hours ago

    AIC Mines’ 18.7Mt Mt Cuthbert copper project: planning signals for mine engineers

    AIC Mines has closed a $70 million acquisition of Materra Metals, securing 100 per cent ownership of the Mt Cuthbert copper project in north‑west Queensland and adding 18.7 million tonnes of copper resources to its portfolio. The company plans a major drilling program in 2027, signalling a shift from resource consolidation to definition drilling and potential mine planning at Mt Cuthbert. For geotechnical and mine planners, the deal points to upcoming demand for pit design, hydrogeology, and infrastructure studies in a historically underdeveloped copper district.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental