Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Select £5m JCB order: fleet and utilisation insights for UK project teams

    August 26, 2026|

    Reviewed by Tom Sullivan

    Select £5m JCB order: fleet and utilisation insights for UK project teams

    First reported on The Construction Index

    30 Second Briefing

    Select Plant Hire has placed a £5m order with JCB via dealer Greenshields JCB for new heavy plant, including JCB 370X tracked excavators, 245XR and 145XR reduced tailswing excavators, 9-tonne dual-drive site dumpers and JCB Loadall telehandlers. The investment targets major UK construction and infrastructure projects where reduced tailswing machines and dual-drive dumpers are needed for constrained, high-cycling sites. JCB will support the fleet with after-sales service aimed at maximising uptime and lifecycle value under intensive hire utilisation.

    Technical Brief

    • After-sales support is framed around lifecycle value, indicating emphasis on planned maintenance and uptime guarantees.

    Our Take

    In our infrastructure coverage, JCB has featured repeatedly in sizeable UK fleet renewals, including Ashbrook’s £18m JCB-focused refresh and Ridgway Rentals’ recent additions, signalling that OEM-backed finance and dealer networks (such as Greenshields JCB) are underpinning a broad upgrade cycle in the hire sector.

    For United Kingdom plant-hire operators like Select Plant Hire, clustering large orders with a single OEM such as JCB typically simplifies parts, telematics and operator training regimes, but also increases exposure to that supplier’s pricing and lead-time risks on future projects.

    The run of JCB stories in our database—from heavy excavators for AMD Contract Services to hydrogen-powered Hydromax record work—suggests the brand is positioning itself as both a mainstream fleet backbone and a technology flag-bearer, which can be leveraged by hire firms in marketing to major infrastructure clients.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Strabag’s Pfaffensteig Tunnel contract: design and delivery notes for rail engineers
    Infrastructure
    4 months ago

    Strabag’s Pfaffensteig Tunnel contract: design and delivery notes for rail engineers

    Strabag and Group company Züblin have secured the design-and-build structural works for the ABS Gäubahn Nord/Pfaffensteig Tunnel in south-west Germany, centred on an 11km twin-bore rail tunnel linking Stuttgart Airport station directly to the Gäubahn line towards Switzerland. About 9.8km will be driven by two TBMs, with conventional tunnelling for the A8 motorway undercrossing and airport connection, plus a 240m cut-and-cover section, retaining structures, railway underpasses and a grade-separated crossing. A 3km surface section will be upgraded and partially realigned for 200km/h operation, delivered under an integrated project delivery model with Ed. Züblin, Wayss & Freytag and Strabag AG sharing tunnelling, structural and earthworks packages.

    National Grid TBM under the Thames: tunnelling design and risk notes for engineers
    Infrastructure
    6 months ago

    National Grid TBM under the Thames: tunnelling design and risk notes for engineers

    A 271.5‑tonne Herrenknecht Mixshield TBM, Caroline, has started driving a 2.2km electricity cable tunnel with a 4m internal diameter beneath the River Thames in Essex for National Grid’s Grain to Tilbury project, delivered by the Ferrovial BEMO joint venture. The drive will pass through variable Thames estuary ground conditions between 35m‑deep launch and reception shafts of 15m and 12m diameter, with tunnelling continuing into 2026 and overall scheme completion targeted for 2029. The new tunnel will replace the 1969 Thames Cable Tunnel and carry new high‑voltage circuits between Grain and Tilbury substations.

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers
    Infrastructure
    7 months ago

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers

    A 13.46m diameter Herrenknecht Mixshield TBM has broken through into the future Balboa station on Panama Metro Line 3 after completing the first-ever TBM undercrossing of the Panama Canal at depths exceeding 60m below sea level. The 5,600kW, 26,616kNm machine, fitted with an accessible cutterhead and more than 4,500 sensors linked via the Herrenknecht.Connected platform, has achieved peak advance of 150 segment rings (about 300m) per month through mixed sandstone, tuff, breccias and basalt. Around 1.5km of the 4.5km twin-track tunnel remains to final breakthrough.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.

    AllGeotechnicalInfrastructureHazardsEnvironmental