Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Santa Rita underground portal first blast: design and schedule notes for mine planners

    March 28, 2026|

    Reviewed by Tom Sullivan

    Santa Rita underground portal first blast: design and schedule notes for mine planners

    First reported on International Mining – News

    30 Second Briefing

    Atlantic Nickel and Appian Capital Advisory have fired the inaugural blast for the first underground access portal at the Santa Rita nickel mine in Bahia, Brazil, marking the physical start of the open-pit to underground transition. Portal and associated preliminary works are progressing in parallel with completion of the underground Definitive Feasibility Study, allowing mine design, scheduling and ground support assumptions to be validated against actual rock conditions. For geotechnical and planning teams, this sequencing reduces schedule risk and enables earlier refinement of underground development and ventilation layouts.

    Technical Brief

    • Initial blast establishes the first underground access portal for Santa Rita’s sub-surface mine infrastructure.
    • Underground works are classed as “preliminary”, enabling early establishment of services, ground support and logistics.
    • Portal development is being advanced before full underground production capex is committed.
    • Parallel DFS and field works allow early calibration of cost, schedule and geotechnical design inputs.
    • For similar open-pit-to-underground assets, this sequencing reduces idle time between final pit and first stopes.

    Our Take

    Nickel items in our database increasingly centre on long-life sulphide assets, so underground development at the Santa Rita mine in Bahia positions Atlantic Nickel to stay relevant as laterite-heavy supply faces higher processing costs.

    Brazil appears only sporadically in our 1161 Mining stories, which suggests Santa Rita’s underground phase could become a reference case for permitting and operating larger-scale base metal underground expansions in the country.

    With Appian Capital Advisory Ltd backing Atlantic Nickel, Santa Rita’s move underground fits a pattern in our coverage where private-equity-owned nickel operations are pushed to unlock deeper resources rather than rely solely on open-pit extensions.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 9 hours ago

    Boliden’s controlling stake in Nexa Resources: portfolio and capex lens for mine planners

    Boliden AB will acquire all of Votorantim SA’s shares in Nexa Resources SA, taking a 64.68% controlling stake while Votorantim retains about 7%, consolidating ownership of Nexa’s zinc and polymetallic operations in Brazil and Peru. The deal gives Boliden strategic control over Nexa’s integrated mining–smelting chain, including large-scale assets such as the Cerro Lindo and Vazante mines and Três Marias smelter. Engineers should watch for potential changes in capital allocation, mine life extension strategies and brownfield expansion across Nexa’s Latin American portfolio.

    Mining
    about 9 hours ago

    IMARC 2026 Innovation & Investment Alley: key takeaways for mine project teams

    IMARC will return its Innovation & Investment Alley in 2026, with Editorial Director Richard Roberts saying the event will again assemble one of the sector’s strongest line-ups of mining technology leaders and early‑stage innovators. More than 500 solution providers are expected in Melbourne, giving mine operators, contractors and investors concentrated access to digital mining platforms, automation vendors and equipment OEMs in a single venue. For engineers, the alley offers a dense snapshot of deployable technologies and pilot‑ready concepts that could feed directly into 2027–2030 project pipelines.

    Mining
    about 9 hours ago

    Metso Simberi expansion package: flowsheet and risk notes for gold plant engineers

    Metso has secured multiple process technology packages for the New Simberi Gold Project Expansion in Papua New Guinea, supplying grinding, flotation, thickening and filtration equipment. The project is owned by Simberi Gold Company Limited, a 50:50 joint venture between Lingbao Gold Group and St Barbara Limited, with engineering delivery led by Pitch Black Group. The deal signals further standardisation of Metso’s integrated comminution–flotation–tailings dewatering flowsheets on brownfield gold expansions in the Asia–Pacific region.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental