Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Santa Rita underground portal first blast: design and schedule notes for mine planners

    March 27, 2026|

    Reviewed by Tom Sullivan

    Santa Rita underground portal first blast: design and schedule notes for mine planners

    First reported on International Mining – News

    30 Second Briefing

    Atlantic Nickel and Appian Capital Advisory have fired the inaugural blast for the first underground access portal at the Santa Rita nickel mine in Bahia, Brazil, marking the physical start of the open-pit to underground transition. Portal and associated preliminary works are progressing in parallel with completion of the underground Definitive Feasibility Study, allowing mine design, scheduling and ground support assumptions to be validated against actual rock conditions. For geotechnical and planning teams, this sequencing reduces schedule risk and enables earlier refinement of underground development and ventilation layouts.

    Technical Brief

    • Initial blast establishes the first underground access portal for Santa Rita’s sub-surface mine infrastructure.
    • Underground works are classed as “preliminary”, enabling early establishment of services, ground support and logistics.
    • Portal development is being advanced before full underground production capex is committed.
    • Parallel DFS and field works allow early calibration of cost, schedule and geotechnical design inputs.
    • For similar open-pit-to-underground assets, this sequencing reduces idle time between final pit and first stopes.

    Our Take

    Nickel items in our database increasingly centre on long-life sulphide assets, so underground development at the Santa Rita mine in Bahia positions Atlantic Nickel to stay relevant as laterite-heavy supply faces higher processing costs.

    Brazil appears only sporadically in our 1161 Mining stories, which suggests Santa Rita’s underground phase could become a reference case for permitting and operating larger-scale base metal underground expansions in the country.

    With Appian Capital Advisory Ltd backing Atlantic Nickel, Santa Rita’s move underground fits a pattern in our coverage where private-equity-owned nickel operations are pushed to unlock deeper resources rather than rely solely on open-pit extensions.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    US Elemental Nasdaq path and McDermitt lithium: project timing and risk notes for engineers
    Mining
    about 9 hours ago

    US Elemental Nasdaq path and McDermitt lithium: project timing and risk notes for engineers

    Jindalee Lithium will spin out its US assets into Nasdaq-bound US Elemental via a merger with a US-listed SPAC, retaining about 80% ownership and targeting a Q3–Q4 2026 listing as work accelerates at the McDermitt lithium project on the Oregon–Nevada border. A 2024 pre-feasibility study for McDermitt, one of the two largest known US lithium resources alongside Thacker Pass, outlined a 60+ year mine life from only part of the resource, with in-fill drilling and a full feasibility study scheduled for 2026–27. McDermitt’s inclusion in the FAST-41 federal permitting programme aims to secure key permits by end-2028, positioning the project ahead of many peers while remaining insulated from current construction cost spikes.

    Litus–UWin Nanotech critical minerals JV: flowsheet design notes for engineers
    Mining
    2 days ago

    Litus–UWin Nanotech critical minerals JV: flowsheet design notes for engineers

    Calgary-based Litus has signed a 25 May memorandum of understanding with Taiwan’s UWin Nanotech to jointly develop selective extraction, separation, recovery and purification flowsheets for cobalt, lithium, nickel and other elements from battery recycling and other secondary sources. The collaboration will combine Litus’ LiNC one-step direct lithium extraction platform for low- and high-concentration brines and its ReLiGN battery recycling process with UWin’s hydrometallurgical systems used in Apple-certified e‑waste and Li-ion recycling. Engineers should watch for integrated nanomaterial–hydromet circuits targeting both critical minerals and rare earth elements in circular supply chains.

    Gold price erases 2026 gains: cost-of-carry and project impacts for miners
    Mining
    2 days ago

    Gold price erases 2026 gains: cost-of-carry and project impacts for miners

    Gold fell as much as 3.5% to $4,315/oz, its lowest since March, erasing 2026 gains after a strong US May nonfarm payrolls print pushed Treasury yields and the dollar higher and lifted Fed rate hike odds. US gold futures dropped over 3.2% to $4,342/oz, with CME FedWatch now pricing about a 68% chance of a December hike versus roughly 50% pre-data. Since the Iran war began and the Strait of Hormuz closure drove energy prices up, bullion has slid nearly 18%, raising the cost of carry for non-yielding gold.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental