Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Santa Rita underground portal first blast: design and schedule notes for mine planners

    March 28, 2026|

    Reviewed by Tom Sullivan

    Santa Rita underground portal first blast: design and schedule notes for mine planners

    First reported on International Mining – News

    30 Second Briefing

    Atlantic Nickel and Appian Capital Advisory have fired the inaugural blast for the first underground access portal at the Santa Rita nickel mine in Bahia, Brazil, marking the physical start of the open-pit to underground transition. Portal and associated preliminary works are progressing in parallel with completion of the underground Definitive Feasibility Study, allowing mine design, scheduling and ground support assumptions to be validated against actual rock conditions. For geotechnical and planning teams, this sequencing reduces schedule risk and enables earlier refinement of underground development and ventilation layouts.

    Technical Brief

    • Initial blast establishes the first underground access portal for Santa Rita’s sub-surface mine infrastructure.
    • Underground works are classed as “preliminary”, enabling early establishment of services, ground support and logistics.
    • Portal development is being advanced before full underground production capex is committed.
    • Parallel DFS and field works allow early calibration of cost, schedule and geotechnical design inputs.
    • For similar open-pit-to-underground assets, this sequencing reduces idle time between final pit and first stopes.

    Our Take

    Nickel items in our database increasingly centre on long-life sulphide assets, so underground development at the Santa Rita mine in Bahia positions Atlantic Nickel to stay relevant as laterite-heavy supply faces higher processing costs.

    Brazil appears only sporadically in our 1161 Mining stories, which suggests Santa Rita’s underground phase could become a reference case for permitting and operating larger-scale base metal underground expansions in the country.

    With Appian Capital Advisory Ltd backing Atlantic Nickel, Santa Rita’s move underground fits a pattern in our coverage where private-equity-owned nickel operations are pushed to unlock deeper resources rather than rely solely on open-pit extensions.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Buffalo Potash permit at Disley: design, risk and process notes for mine engineers
    Mining
    about 9 hours ago

    Buffalo Potash permit at Disley: design, risk and process notes for mine engineers

    Buffalo Potash has secured Saskatchewan approval to complete construction and operate its Disley initial production module, a 125,000 t/y soluble-grade potash facility 50 km northwest of Regina using a patented horizontal line-drive brine circulation method through parallel horizontal wells. The C$41.5 million module will test selective underground dissolution of potassium chloride with sodium-chloride-saturated brine and supply local agriculture, drilling-fluid markets and potassium-chloride brine for regional oilfields, ahead of planned 500,000 t/y Disley East and West expansions to about 1.13 Mt/y. The permit, which runs to 30 April and excludes future modules, requires groundwater characterisation, air-quality compliance and financial assurance, while the project proceeds without a feasibility study or declared reserves, elevating technical and economic risk.

    Exiro-led takeover of Vale’s Manitoba nickel complex: key points for mine planners
    Mining
    about 9 hours ago

    Exiro-led takeover of Vale’s Manitoba nickel complex: key points for mine planners

    Exiro Minerals, Orion Resource Partners and Canada Growth Fund have acquired an 81.1% stake in Vale’s Thompson nickel operations in northern Manitoba, committing up to US$200 million to sustain and develop the six-decade-old complex. The new vehicle, Exiro Nickel, takes over day-to-day control of two operating underground mines, the adjacent concentrator and exploration ground along the 135 km Thompson Nickel Belt, while Vale Base Metals retains an 18.9% interest. A multi-year offtake agreement keeps Vale buying nickel concentrate from the Thompson mill, providing a defined outlet for future production.

    Mining
    about 9 hours ago

    Moeve–Emerita 100% renewable diesel deal in Spain: decarbonisation notes for mines

    Moeve and Emerita Resources have signed Spain’s first mining-sector agreement to deploy 100% renewable diesel (HVO) at industrial scale, designating Moeve as preferred supplier of this second-generation biofuel. The HVO, derived from waste and residue feedstocks rather than food crops, is claimed to cut lifecycle CO2 emissions by up to 90% compared with conventional diesel. For mine operators, the drop-in fuel compatibility with existing diesel engines offers a near-term route to decarbonise haul trucks and auxiliary fleets without major equipment changes.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental