Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Sandvik’s new 63 t Toro load and haul line-up: planning notes for mine engineers

    September 9, 2026|

    Reviewed by Joe Ashwell

    Sandvik’s new 63 t Toro load and haul line-up: planning notes for mine engineers

    First reported on International Mining – News

    30 Second Briefing

    Sandvik is overhauling its 23-vehicle Toro® load and haul line-up, with the new Toro® TH663i Gen2 underground truck introducing a 63‑t payload platform as a central element of the Turku factory’s “Future of Loading and Hauling” programme. The TH663i Gen2 builds on the i-series digital architecture and automation readiness already used across Sandvik’s intelligent trucks, targeting high-capacity, long-haul underground applications. For mine planners, the larger payload and integrated data capabilities signal scope to re-optimise ramp profiles, fleet sizing, and traffic management in deep-level operations.

    Technical Brief

    • Automation‑ready hardware and control systems are now being embedded at build stage rather than retrofitted.
    • Turku’s test facilities are being used to validate long‑haul duty cycles and structural fatigue on heavier trucks.
    • Load and haul redesign is coordinated with Sandvik’s underground drilling and rock support portfolio for fleet interoperability.
    • Data integration work in Turku targets common telemetry formats to simplify mixed‑fleet dispatch and maintenance planning.
    • For other OEMs, Turku’s model shows consolidation of design, digital integration and manufacturing in a single hub.

    Our Take

    The expansion of Sandvik’s load and haul offering to 23 vehicles at Turku lines up with the broader Future of Mining 2026 push seen in Tampere, signalling that Finland is becoming the company’s core European hub for underground fleet development and customer engagement.

    The 63 t Toro TH663i I Gen2 truck showcased in Turku complements the ‘Sami’ concept machine unveiled in Tampere, indicating Sandvik is pairing near-term, high-payload production units with longer-horizon AI and automation testbeds rather than treating them as separate technology tracks.

    Across our Mining coverage, Sandvik appears frequently in both ‘Projects’ and ‘Product’ tags, and the Turku load-and-haul line-up suggests the company is using product breadth, rather than single-asset flagship machines, to lock in fleet standardisation decisions at large underground operations.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 2 hours ago

    CDE–Stevin Rock Al Ghail wash plants: process and tailings notes for engineers

    CDE Group has secured orders from Stevin Rock to design and build two modular sand and aggregates wash plants rated at 1,000 t/h and 250 t/h for the company’s Al Ghail limestone operation in the UAE. The plants will process material from a site producing over 100 Mt/y, targeting improved recovery of manufactured sand and washed aggregates from high-volume quarry fines. For process and tailings engineers, the scale signals continued investment in wet processing to maximise resource utilisation and reduce waste in large Gulf limestone quarries.

    Marimaca’s thick Pampa Medina copper-silver hit: growth and pit design notes for engineers
    Mining
    about 3 hours ago

    Marimaca’s thick Pampa Medina copper-silver hit: growth and pit design notes for engineers

    Marimaca Copper has intersected 216 metres grading 0.96% copper and 7.2 g/t silver from 466 metres in hole SPRD-15 at Pampa Medina in Chile’s Antofagasta Region, including 62 metres at 2.2% copper and 21.5 g/t silver from 602 metres, extending the copper-silver system 300 metres. Step-out holes such as SPD-13 (222 metres at 0.5% copper from 194 metres) and SPRD-12 (56 metres at 0.95% copper from 748 metres) support continuity of oxide and sulphide mineralisation across a 3 km by 1.5 km footprint. With 30,000 metres of drilling planned in 2026 and Pampa Medina only 28 km from the fully permitted Marimaca oxide project (179 Mt at 0.42% copper, 50,000 t/y cathode over 13 years), the results point to a potentially large sulphide growth option adjacent to near-term heap-leach development.

    Rio Tinto acquires Aurukun bauxite project: development and approvals lens for engineers
    Mining
    about 3 hours ago

    Rio Tinto acquires Aurukun bauxite project: development and approvals lens for engineers

    Rio Tinto has agreed to acquire the Aurukun Bauxite Project in Queensland from Glencore and Mitsubishi Development, adding to its regional bauxite portfolio anchored by the Weipa operations about 200 km north, which produce over 30 million tonnes of bauxite per year. Aurukun remains at Mineral Development Licence stage with no Mining Lease granted, and the Wik Waya Traditional Owners say they were not consulted on the sale. Financial terms were undisclosed and completion depends on Queensland government and other Australian regulatory approvals.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    AllGeotechnicalInfrastructureHazardsEnvironmental