Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Sandvik’s 27-unit fleet for Orken: mechanised mine design notes for engineers

    September 28, 2026|

    Reviewed by Joe Ashwell

    First reported on International Mining – News

    30 Second Briefing

    Sandvik will supply a 27-unit underground fleet to Orken LLP, the iron ore division of Qarmet JSC, to mechanise development at the Atasu operation in the Western Karazhal mine, Kazakhstan. The package includes 13 Toro TH430 trucks and five Toro LH410 loaders, shifting the mine from manual development headings to fully mechanised haulage and loading. The move signals higher development advance rates and more consistent ground support installation, with implications for ventilation design, traffic management and maintenance planning in existing drifts.

    Technical Brief

    • Fleet order totals 27 Sandvik units, centred on Toro® TH430 trucks and Toro® LH410 loaders.
    • Supply is contracted directly with Orken LLP, iron ore division of Qarmet JSC.
    • Deployment is targeted at the Atasu operation within the Western Karazhal underground iron ore mine.
    • Transition to mechanised equipment will require reconfiguring existing development profiles for truck–loader turning and passing.
    • Increased diesel fleet density will drive revised mine ventilation modelling and auxiliary fan placement in headings.
    • Maintenance planning will shift from ad hoc repairs to scheduled component change-outs based on OEM service intervals.
    • Similar brownfield mechanisation projects often trigger updates to ground support QA/QC and development drilling standards.

    Our Take

    Sandvik’s 27-unit underground fleet for Orken LLP in Kazakhstan sits alongside multiple recent items in our database where the company is pushing underground loaders and trucks into highly competitive markets such as Australia, suggesting it is consolidating share in hard-rock load-and-haul rather than chasing greenfield OEM niches.

    With iron ore as the commodity and both Atasu and Western Karazhal in play, this order reinforces that Sandvik’s underground portfolio is not just tied to battery-electric flagships highlighted at its Turku ‘Future of Mining 2026’ event, but is still being deployed at scale in conventional iron ore operations where power infrastructure or capital constraints can delay BEV adoption.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 2 hours ago

    EACON AHS at Zijinshan mine: design lessons for long tunnel haul layouts

    EACON Mining Technology has validated an autonomous haulage capability at Zijinshan copper-gold mine that keeps trucks running driverless through extended tunnel sections where GNSS/RTK positioning and network connectivity drop out. The system uses on-board perception and localisation to operate without full dependence on conventional high-definition maps, targeting long underground or covered haul segments rather than short blind spots. For mine planners and automation teams, this points to AHS designs that can tolerate sustained signal loss in complex pit–portal–tunnel layouts.

    Brightstar’s Two Mile Hill resource doubles: mine design implications for engineers
    Mining
    about 3 hours ago

    Brightstar’s Two Mile Hill resource doubles: mine design implications for engineers

    Brightstar Resources has nearly doubled the mineral resource estimate at its Two Mile Hill–Shillington deposit in Western Australia to 24.6Mt at 1.8g/t for 1.45Moz of gold, as part of ongoing mining studies for the Sandstone gold project. The revised MRE, covering both the tonalite-hosted Two Mile Hill intrusion and the adjacent Shillington shear-hosted mineralisation, materially upgrades the scale of potential open pit and underground options. Geotechnical and mine design teams will now be able to re-optimise pit shells, underground stoping layouts and scheduling around the larger, higher-confidence inventory.

    Northern Star rejects $38bn Gold Fields bid: asset and project lens for engineers
    Mining
    about 3 hours ago

    Northern Star rejects $38bn Gold Fields bid: asset and project lens for engineers

    Northern Star Resources has rejected a confidential all‑scrip takeover proposal from Gold Fields that valued the ASX‑listed gold producer at about $38 billion and sought 100 per cent of its fully paid ordinary shares. The board said the offer failed to reflect the “fundamental value” of its asset base, including its 50 per cent interest in the KCGM Super Pit in Kalgoorlie and other tier‑one Australian operations. The move signals continued confidence in Northern Star’s standalone growth pipeline and may delay further consolidation in the WA gold sector.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental