Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Sandvik Tampere drill plant expansion: capacity and lead-time impacts for mine planners

    September 2, 2026|

    Reviewed by Joe Ashwell

    First reported on International Mining – News

    30 Second Briefing

    Sandvik’s SEK260 million expansion of its Tampere, Finland rock drill plant has reached a key phase, with the new factory area, CNC machine tools and automation systems installed and production ramp-up underway. The 2023-launched programme targets higher output of top hammer and down-the-hole drills for both underground and surface rigs, consolidating core component manufacturing at a single European hub. For mine operators and contractors, the added capacity should ease lead times on OEM drill strings and support fleet standardisation across Sandvik’s latest automated drilling platforms.

    Technical Brief

    • Investment totals SEK260 million, allocated to factory expansion, CNC equipment and automation at Tampere.

    Our Take

    The recent large equipment order for Kamoa-Kakula copper operations indicates Sandvik’s underground fleet is gaining share at tier-one mines, and expanded rock drill output from Finland will help the company support similar multi-unit contracts without long lead times.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 15 hours ago

    Sandvik IEC 62443-4-1 ML3: cybersecurity implications for intelligent mines

    Sandvik has secured IEC 62443-4-1 Maturity Level 3 certification for its secure product development lifecycle, making it one of the first mining OEMs to reach this cybersecurity benchmark. The independently audited ML3 rating confirms that threat modelling, secure coding, vulnerability management and patch processes are systematically built into the design and maintenance of its intelligent mining equipment and digital systems. For mines deploying connected fleets, autonomous loaders and remote drilling rigs, this signals stronger protection against cyber intrusion at both equipment and control-system level.

    BME’s VIPERTRON electronic initiation system: design and timing notes for mine engineers
    Mining
    about 15 hours ago

    BME’s VIPERTRON electronic initiation system: design and timing notes for mine engineers

    BME has launched the VIPERTRON electronic initiation system, a lightweight, compact blasting solution designed for agile deployment in quarries and surface mines using robust radio-frequency communication between field units and the blasting control. The system targets operations still using NONEL by offering tighter timing accuracy and more consistent blast performance, while maintaining simple, portable hardware for crews working in constrained benches and multiple small shots. For engineers, the key shift is towards electronic timing control without the complexity and bulk of traditional wired electronic detonator systems.

    Brightstar’s Laverton expansion corridor: mine planning and haulage lens for engineers
    Mining
    about 15 hours ago

    Brightstar’s Laverton expansion corridor: mine planning and haulage lens for engineers

    Brightstar Resources has secured five exploration licences comprising Panther Metals’ Mikado project around its new Laverton processing plant in Western Australia under a 100 per cent binding tenement sale agreement. The deal consolidates tenure immediately adjacent to the planned processing hub, giving Brightstar direct control over near-plant feed sources rather than relying on satellite ore trucking. For mine planners and geotechs, the enlarged footprint enables integrated pit design, waste dump siting and haulage optimisation across a contiguous land package.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    AllGeotechnicalInfrastructureHazardsEnvironmental