Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Safety

    Samphire uranium extraction trial: ISR design and groundwater insights for engineers

    March 23, 2026|

    Reviewed by Tom Sullivan

    Samphire uranium extraction trial: ISR design and groundwater insights for engineers

    First reported on Australian Mining

    30 Second Briefing

    Alligator Energy has begun uranium extraction in the field leach trial at its Samphire in-situ recovery (ISR) project near Whyalla, South Australia, a key step towards proving commercial ISR performance in the Eyre Peninsula’s shallow sandstone aquifers. The trial will operate a closed-circuit lixiviant system through a dedicated wellfield to generate real-time data on uranium recovery, solution chemistry and groundwater behaviour under controlled drawdown. Results will drive final well spacing, pump sizing and process plant design, and feed into regulatory approvals for full-scale ISR mining.

    Technical Brief

    • Field leach trial is being run under South Australian uranium ISR regulatory framework and radiation codes.
    • Groundwater extraction and reinjection are being controlled to maintain hydraulic containment within the designated wellfield boundary.
    • Radiation exposure for site personnel is managed via time–distance–shielding protocols and continuous dosimetry.
    • Lixiviant handling and storage use bunded tanks and lined transfer areas to prevent surface contamination.
    • Baseline and ongoing groundwater quality sampling around the trial area is required for environmental compliance.
    • Decommissioning of trial wells will need approved plugging and abandonment procedures to protect overlying aquifers.
    • Outcomes are expected to inform ISR safety case development for other shallow sandstone uranium systems in South Australia.

    Our Take

    The current extraction trial at the Samphire uranium project follows quickly on Alligator Energy’s launch of a bankable feasibility study in February 2026, signalling that testwork outcomes are likely being fed directly into project economics and design rather than treated as a standalone pilot phase.

    In our database of uranium-tagged Mining pieces, Samphire is one of the few Australian in‑situ recovery (ISR) projects progressing through both detailed construction planning and BFS in parallel, which typically shortens the timeline to a final investment decision but raises the premium on getting early hydrogeological and safety data right.

    DevEx Resources’ December 2025 move to acquire Alligator Energy’s assets places the South Australia–based Samphire project within a broader multi-commodity portfolio that also includes lithium, which may influence future capital allocation between uranium and battery-materials targets if the ISR trial results are marginal rather than clearly robust.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 17 hours ago

    Boliden’s controlling stake in Nexa Resources: portfolio and capex lens for mine planners

    Boliden AB will acquire all of Votorantim SA’s shares in Nexa Resources SA, taking a 64.68% controlling stake while Votorantim retains about 7%, consolidating ownership of Nexa’s zinc and polymetallic operations in Brazil and Peru. The deal gives Boliden strategic control over Nexa’s integrated mining–smelting chain, including large-scale assets such as the Cerro Lindo and Vazante mines and Três Marias smelter. Engineers should watch for potential changes in capital allocation, mine life extension strategies and brownfield expansion across Nexa’s Latin American portfolio.

    Mining
    about 17 hours ago

    IMARC 2026 Innovation & Investment Alley: key takeaways for mine project teams

    IMARC will return its Innovation & Investment Alley in 2026, with Editorial Director Richard Roberts saying the event will again assemble one of the sector’s strongest line-ups of mining technology leaders and early‑stage innovators. More than 500 solution providers are expected in Melbourne, giving mine operators, contractors and investors concentrated access to digital mining platforms, automation vendors and equipment OEMs in a single venue. For engineers, the alley offers a dense snapshot of deployable technologies and pilot‑ready concepts that could feed directly into 2027–2030 project pipelines.

    Mining
    about 17 hours ago

    Metso Simberi expansion package: flowsheet and risk notes for gold plant engineers

    Metso has secured multiple process technology packages for the New Simberi Gold Project Expansion in Papua New Guinea, supplying grinding, flotation, thickening and filtration equipment. The project is owned by Simberi Gold Company Limited, a 50:50 joint venture between Lingbao Gold Group and St Barbara Limited, with engineering delivery led by Pitch Black Group. The deal signals further standardisation of Metso’s integrated comminution–flotation–tailings dewatering flowsheets on brownfield gold expansions in the Asia–Pacific region.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental