    Samphire uranium extraction trial: ISR design and groundwater insights for engineers

    First reported on Australian Mining

    30 Second Briefing

    Alligator Energy has begun uranium extraction in the field leach trial at its Samphire in-situ recovery (ISR) project near Whyalla, South Australia, a key step towards proving commercial ISR performance in the Eyre Peninsula’s shallow sandstone aquifers. The trial will operate a closed-circuit lixiviant system through a dedicated wellfield to generate real-time data on uranium recovery, solution chemistry and groundwater behaviour under controlled drawdown. Results will drive final well spacing, pump sizing and process plant design, and feed into regulatory approvals for full-scale ISR mining.

    Technical Brief

    • Field leach trial is being run under South Australian uranium ISR regulatory framework and radiation codes.
    • Groundwater extraction and reinjection are being controlled to maintain hydraulic containment within the designated wellfield boundary.
    • Radiation exposure for site personnel is managed via time–distance–shielding protocols and continuous dosimetry.
    • Lixiviant handling and storage use bunded tanks and lined transfer areas to prevent surface contamination.
    • Baseline and ongoing groundwater quality sampling around the trial area is required for environmental compliance.
    • Decommissioning of trial wells will need approved plugging and abandonment procedures to protect overlying aquifers.
    • Outcomes are expected to inform ISR safety case development for other shallow sandstone uranium systems in South Australia.

    Our Take

    The current extraction trial at the Samphire uranium project follows quickly on Alligator Energy’s launch of a bankable feasibility study in February 2026, signalling that testwork outcomes are likely being fed directly into project economics and design rather than treated as a standalone pilot phase.

    In our database of uranium-tagged Mining pieces, Samphire is one of the few Australian in‑situ recovery (ISR) projects progressing through both detailed construction planning and BFS in parallel, which typically shortens the timeline to a final investment decision but raises the premium on getting early hydrogeological and safety data right.

    DevEx Resources’ December 2025 move to acquire Alligator Energy’s assets places the South Australia–based Samphire project within a broader multi-commodity portfolio that also includes lithium, which may influence future capital allocation between uranium and battery-materials targets if the ISR trial results are marginal rather than clearly robust.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Endurance Gold Reliance step-outs: resource and metallurgy lens for mine planners
    Mining
    about 11 hours ago

    Endurance Gold Reliance step-outs: resource and metallurgy lens for mine planners

    Endurance Gold’s 2026 drilling at the Reliance project in southern British Columbia has returned high-grade step-outs outside the current resource, including 14.7 metres at 7.67 g/t gold and 0.13% antimony from 75.9 metres in DDH26-128 and 12 metres at 3.07 g/t gold from 98.2 metres in DDH26-129, a 60-metre step-out along the Eagle trend. The 8,000-metre diamond programme, with seven holes (1,899 metres) already completed at southern Eagle and two deep tests at Imperial, targets conversion of near-surface ounces and deeper Royal Shear extensions. Reliance currently hosts 19.6 million inferred tonnes at 2.3 g/t gold (1.45 million oz), with metallurgical work aiming to improve recoveries beyond earlier 84.7% gold to concentrate.

    Mining
    about 11 hours ago

    Caterpillar 794 AC at Quellaveco 500 Mt milestone: haul design notes for engineers

    Caterpillar’s autonomous 794 AC haul truck fleet at Anglo American’s Quellaveco copper mine in Moquegua, Peru has passed 500 Mt of material moved, with Ferreyros supporting the deployment as Caterpillar’s local representative. The fully autonomous trucks operate on steep, high-altitude pit ramps typical of Andean copper operations, integrating with digital fleet management and high-precision guidance systems. The milestone signals growing confidence in large-scale autonomous haulage for greenfield copper projects, with implications for haul road design, traffic management rules, and maintenance planning.

    Mining
    about 11 hours ago

    Los Bronces–Andina JV: integrated mine plan implications for planners and geotechs

    Anglo American, via its 50.1%-owned Anglo American Sur SA, and Codelco have finalised a definitive agreement to run a joint mine plan for the adjacent Los Bronces and Andina copper operations in central Chile, after securing all competition and regulatory approvals. The integrated planning covers two large-scale open pits sharing the same Andean district, enabling coordinated sequencing of ore bodies, waste dumps and tailings storage across property boundaries. For mine planners and geotechnical teams, this opens scope for shared slope design, haul road rationalisation and potentially consolidated infrastructure for high-altitude water and power supply.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy