Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Rio Tinto’s Barton and Canada’s $1T drive: project pipeline signals for engineers

    September 2, 2026|

    Reviewed by Joe Ashwell

    Rio Tinto’s Barton and Canada’s $1T drive: project pipeline signals for engineers

    First reported on MINING.com

    30 Second Briefing

    Rio Tinto chair Dominic Barton has been appointed chair of Invest in Canada and MEM Growth Partners founder Gurinder Grewal named CEO, tasked with steering a C$1 trillion ($720 billion) investment drive over five years into critical minerals, energy, artificial intelligence and major infrastructure. Ottawa expects about C$280 billion in federal capital and incentives to leverage more than C$1 trillion from public, private and institutional sources, building on C$96.8 billion of foreign direct investment in 2025. Invest in Canada will work closely with the federal Major Projects Office to move foreign investors from early interest to construction.

    Technical Brief

    • Invest in Canada, created in 2018, is now aligned under Minister Dominic LeBlanc’s Canada–U.S. trade and intergovernmental affairs portfolio.
    • Barton’s chair role is part‑time for three years; Grewal’s CEO role is full‑time for five.
    • Outgoing chair Karl Tabbakh remains on the board during transition, providing continuity on existing project pipelines.
    • Foreign direct investment inflows reached C$96.8 billion in 2025, the highest annual level since 2007.
    • The stock of foreign investment in Canada reached C$1.6 trillion at end‑2025, up 6.9% year‑on‑year.
    • Barton brings board‑level mining exposure from Rio Tinto and Teck Resources plus ambassadorial experience in China (2019–2021).
    • His prior roles at McKinsey (nine years global managing partner, six years Asia chair) add large‑project advisory experience.
    • Grewal’s background covers >25 years in energy, industrials, infrastructure and technology investing across the Americas and Europe.
    • He has raised debt, equity and structured capital and held an operating role in a Nasdaq‑listed advanced‑manufacturing company.

    Our Take

    In our Policy category, Canada‑linked copper and gold items increasingly reference permitting and incentive frameworks, so a dedicated Invest in Canada chair and CEO structure is likely to become a focal point for navigating approvals and de‑risking large greenfield projects for North American and Asian capital.

    The presence of Coal India and its Mahanadi Coalfields unit in both this piece and our recent critical minerals and coal analysis suggests that Canadian investment promotion will have to balance decarbonisation narratives with the reality that coal‑heavy jurisdictions like India remain central to near‑term commodity flows and offtake security.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Venezuela mining revival and Orinoco Arc: ESG and risk takeaways for project teams
    Policy
    about 3 hours ago

    Venezuela mining revival and Orinoco Arc: ESG and risk takeaways for project teams

    Venezuela’s push to reopen the Orinoco Mining Arc to global investors for gold, bauxite, coltan, iron ore and nickel is colliding with the presence of at least four uncontacted Indigenous peoples (Jödi/Hoti, Uwottüja/Piaroa, Yanomami and Eñepá/Panare) whose territories overlap or lie close to planned mining zones. Survival International reports 196 uncontacted groups worldwide, over 96% threatened by extractives, with Venezuelan Yanomami already facing mercury contamination, infectious disease and violent crime linked to illegal gold mining. The op-ed argues that without legally recognised territories, buffer zones, FPIC-compliant frameworks and IRMA-level safeguards, large-scale mining and associated access roads risk illegal encroachment, corporate complicity and potentially existential impacts on isolated communities.

    NatureScot biodiversity metric: key planning implications for project teams
    Policy
    about 3 hours ago

    NatureScot biodiversity metric: key planning implications for project teams

    NatureScot has launched a public consultation on the Scottish Planning Biodiversity Metric, a standardised tool required under National Planning Framework 4 (2023) to evidence biodiversity net gain on large-scale developments. The metric starts from a baseline habitat survey – covering grassland, peatland and woodland – to quantify pre-development biodiversity value and calculate the area and type of habitat creation or restoration needed to offset and enhance losses. Consultation on the working tool, user guide and habitat condition assessment runs to 30 November, with a refined version due in spring 2027.

    Tasmania road safety strategy consultation: design implications for engineers
    Policy
    about 15 hours ago

    Tasmania road safety strategy consultation: design implications for engineers

    Public consultation has opened on Tasmania’s next road safety strategy, which will build on the current Towards Zero Tasmanian Road Safety Strategy 2017–2026 and its data on serious and fatal crashes. The new framework will benchmark against national and global best-practice, including Safe System principles and low-speed urban design, while tailoring measures to local conditions such as rural highways and regional freight routes. For civil designers and traffic engineers, outcomes are likely to influence speed zoning, barrier selection, intersection treatments and funding priorities for high‑risk corridors.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    AllGeotechnicalInfrastructureHazardsEnvironmental