Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    QME 2024: key takeaways for Bowen Basin mine planners and engineers

    March 31, 2026|

    Reviewed by Tom Sullivan

    QME 2024: key takeaways for Bowen Basin mine planners and engineers

    First reported on Australian Mining

    30 Second Briefing

    Queensland Mining & Engineering Exhibition (QME) will return to the Mackay Showgrounds from 22–24 July 2024, bringing together underground coal, METS and decarbonisation suppliers across more than 250 exhibitors. The event will feature live demonstrations of autonomous and battery-electric equipment, mine ventilation and dust-control systems, and digital fleet management platforms tailored to Bowen Basin operations. For geotechnical and operations teams, QME offers direct access to OEM engineers, case studies from nearby longwall and dragline sites, and cross-industry sessions on decarbonising diesel haulage and improving asset life.

    Technical Brief

    • Cross-industry presence (mining, energy, heavy civil) encourages transfer of haulage, power and asset-management practices between sectors.

    Our Take

    QME’s role in Mackay sits within a cluster of recent Australian Mining coverage where the exhibition is increasingly a platform for full-scale equipment demonstrations, as seen in the 2026 floor-space expansion that prioritised outdoor heavy plant displays.

    Several supplier-focused pieces in our database – including on XCMG’s battery-electric fleets and Kal Tire/Decoda’s haul-road hazard detection – signal that events backed by Australian Mining and Prime Creative Media are becoming key venues for miners to assess decarbonisation and digital safety technologies side by side.

    With 2187 tag-matched ‘Projects’ and ‘Product’ pieces in our coverage, QME’s Australia-based forum gives OEMs and contractors a relatively rare chance to cross-pollinate project lessons and product development in person, which can shorten adoption cycles for new kit in operating mines.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 8 hours ago

    Boliden’s controlling stake in Nexa Resources: portfolio and capex lens for mine planners

    Boliden AB will acquire all of Votorantim SA’s shares in Nexa Resources SA, taking a 64.68% controlling stake while Votorantim retains about 7%, consolidating ownership of Nexa’s zinc and polymetallic operations in Brazil and Peru. The deal gives Boliden strategic control over Nexa’s integrated mining–smelting chain, including large-scale assets such as the Cerro Lindo and Vazante mines and Três Marias smelter. Engineers should watch for potential changes in capital allocation, mine life extension strategies and brownfield expansion across Nexa’s Latin American portfolio.

    Mining
    about 8 hours ago

    IMARC 2026 Innovation & Investment Alley: key takeaways for mine project teams

    IMARC will return its Innovation & Investment Alley in 2026, with Editorial Director Richard Roberts saying the event will again assemble one of the sector’s strongest line-ups of mining technology leaders and early‑stage innovators. More than 500 solution providers are expected in Melbourne, giving mine operators, contractors and investors concentrated access to digital mining platforms, automation vendors and equipment OEMs in a single venue. For engineers, the alley offers a dense snapshot of deployable technologies and pilot‑ready concepts that could feed directly into 2027–2030 project pipelines.

    Mining
    about 8 hours ago

    Metso Simberi expansion package: flowsheet and risk notes for gold plant engineers

    Metso has secured multiple process technology packages for the New Simberi Gold Project Expansion in Papua New Guinea, supplying grinding, flotation, thickening and filtration equipment. The project is owned by Simberi Gold Company Limited, a 50:50 joint venture between Lingbao Gold Group and St Barbara Limited, with engineering delivery led by Pitch Black Group. The deal signals further standardisation of Metso’s integrated comminution–flotation–tailings dewatering flowsheets on brownfield gold expansions in the Asia–Pacific region.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental