Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects

    Qiyuan Green Power–Shenzhen Kehua deal: BEV haul truck charging lens for mines

    June 18, 2026|

    Reviewed by Tom Sullivan

    First reported on International Mining – News

    30 Second Briefing

    Battery swapping and charging specialist Shanghai Qiyuan Green Power Technology and EV charging group Shenzhen Kehua Hengsheng Technology have signed a strategic cooperation agreement to jointly develop energy replenishment systems for new energy heavy trucks. The partnership is expected to focus on integrated fast-charging and battery-swapping infrastructure suitable for high-duty-cycle mining haul fleets and other heavy logistics applications. For mine operators, this signals growing vendor collaboration around standardised high-power interfaces and depot-scale charging layouts, which could simplify BEV haul truck deployment and power system planning.

    Technical Brief

    • Cooperation agreement formally signed between Shanghai Qiyuan Green Power Technology Co Ltd and Shenzhen Kehua Hengsheng Technology Co Ltd.
    • Scope explicitly targets “new energy heavy trucks”, i.e. high-mass, high-duty-cycle commercial vehicles.
    • Collaboration centres on a “comprehensive energy replenishment system”, implying integrated charging, swapping and power-conditioning hardware.

    Our Take

    Because this JV sits in the Projects-tagged subset of our database, it is likely to translate into deployable on-site systems rather than just product co-development, which matters for miners trying to de-risk BEV fleet rollouts constrained by weak grid connections.

    Qiyuan Green Power and Shenzhen Kehua both come from the Chinese power and electronics ecosystem, and their cooperation suggests that Chinese-origin charging platforms could become the default for underground and open-pit BEV fleets unless Western OEMs and utilities-backed providers move faster on mine-specific solutions.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    First Phosphate G7 LOIs and offtakes: project finance lens for mine planners
    Mining
    about 3 hours ago

    First Phosphate G7 LOIs and offtakes: project finance lens for mine planners

    First Phosphate has secured letters of interest for up to C$275 million in guarantees from Denmark’s Export and Investment Fund and additional LOIs from Italy’s CDP, SIMEST and MAIRE to advance the Bégin-Lamarche mine and a Ballestra-technology phosphoric acid plant at Port Saguenay under the G7 Critical Minerals Resilience and Production Alliance. Bégin-Lamarche hosts 41.5 million indicated pit-constrained tonnes at 6.49% P2O5 and 214 million inferred tonnes at 6.01% P2O5 in igneous ore targeted for LFP battery-grade phosphoric acid. The company has also locked in offtake for at least 200,000 t/y of phosphate concentrate and 60,000 t/y of phosphoric acid, de-risking project financing and downstream integration.

    Hudbay’s Copper Mountain mine expansion: design, strip ratio and life-of-mine notes
    Mining
    about 3 hours ago

    Hudbay’s Copper Mountain mine expansion: design, strip ratio and life-of-mine notes

    Hudbay Minerals has broken ground on the New Ingerbelle expansion at the Copper Mountain mine in British Columbia, a pushback of the historic Ingerbelle pit walls designed to access higher-grade ore with a stripping ratio about three times lower than current mining areas. Using existing Copper Mountain mill and fleet infrastructure, the project is forecast to produce about 750,000 tonnes of copper, 900,000 oz of gold and 5.5 million oz of silver, extending mine life beyond 2040. New Ingerbelle, now a B.C. priority resource project, preserves over 800 direct jobs and has refreshed participation agreements with the Upper and Lower Similkameen Indian Bands.

    Guardian Metal Nevada tungsten projects: water rights deal explained for mine planners
    Mining
    about 3 hours ago

    Guardian Metal Nevada tungsten projects: water rights deal explained for mine planners

    Guardian Metal Resources has acquired Lincoln Estates Group LLC in Nevada, adding 841 acres of land and 2,540 acre-feet per year of water rights across three permits in the Lincoln County Water District to support its Tempiute and Pilot Mountain tungsten projects. Lincoln Estates lies less than 10 miles from the historic Tempiute (ex-Emerson) mine, a past Union Carbide producer last operated in the 1980s, and complements a US Department of War US$6.2 million award to advance Pilot Mountain. The deal materially de-risks water supply for mine redevelopment in a state where groundwater allocation is a critical permitting constraint.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy