Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    PNG Expo 2027: scheduling and planning notes for mining project teams

    October 9, 2026|

    Reviewed by Joe Ashwell

    PNG Expo 2027: scheduling and planning notes for mining project teams

    First reported on Australian Mining

    30 Second Briefing

    Early Bird tickets are now on sale for the 2027 PNG Mining and Industrial Exhibition and Conference (PNG Expo), to be held at the Sheraton Port Moresby Stanley Hotel & Suites on 26–27 May 2027. The event will again bring together mining, METS and industrial suppliers in Papua New Guinea’s capital, giving operators, contractors and OEMs a fixed window to schedule technical meetings, product demos and project briefings. Early booking allows site-based staff to align rosters, travel and accommodation for Port Moresby well in advance.

    Technical Brief

    • Hotel-based expo layout suits indoor equipment displays, control rooms, software, comms and process-plant instrumentation rather than large mobile fleets.
    • For similar regional hubs, hotel-integrated expos reduce downtime by clustering travel, technical training and contract negotiations.

    Our Take

    The 2026 PNG Expo piece in our database flagged an expanded floorplan and multi-stream conference in Port Moresby, which signals that the 2027 event at the Sheraton Port Moresby Stanley Hotel & Suites is likely being positioned as a follow-on hub for OEMs and contractors planning multi-year deployment into PNG projects.

    Within our 1271 Mining stories, PNG-specific project coverage is relatively sparse compared with Australia, so a recurring PNG Expo series backed by Australian Mining provides one of the more structured touchpoints for operators wanting to track regulatory, logistics and supply-chain developments in Port Moresby and beyond.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    SigraFi’s $35m ASGM facility: supply chain and risk notes for gold project teams
    Mining
    about 3 hours ago

    SigraFi’s $35m ASGM facility: supply chain and risk notes for gold project teams

    SigraFi has secured a $35 million credit facility from a consortium led by UAE-based Ronin Commercial Brokers to finance gold offtake from organised artisanal and small-scale gold mining cooperatives in the DRC, Zambia and South America. The company already works with PeaceGold in eastern DRC, covering 11 cooperatives and about 25,000 miners in Ituri Province, using multi-year contracts and guaranteed offtake at competitive prices. The model targets ASGM’s roughly 20% share of global newly mined gold by providing traceable, compliant supply to institutional refiners previously reliant on informal channels.

    Tahmoor Colliery sale: restart staging and ground control checks for engineers
    Mining
    about 2 hours ago

    Tahmoor Colliery sale: restart staging and ground control checks for engineers

    Completion of the Tahmoor Colliery sale in New South Wales to the GEAR/M Resources Consortium moves the underground coking coal mine closer to full restart, with about 150 workers already back on site undertaking initial mining activities. The new operator plans a staged ramp-up, progressively recalling additional personnel and recommissioning equipment to restore longwall production. Geotechnical and operational teams will be focused on revalidating ground control, ventilation and gas management systems after the shutdown period before returning to full output.

    Avonbank mineral sands mining licence: design and tailings notes for engineers
    Mining
    about 2 hours ago

    Avonbank mineral sands mining licence: design and tailings notes for engineers

    WIM Resource has secured a mining licence for the Avonbank mineral sands project in western Victoria, located about 15km north-east of Horsham, to extract a heavy mineral assemblage including zircon, titanium minerals and rare earth elements. The approval follows a formal assessment by Resources Victoria, clearing the way for large-scale dredge or dry mining of strandline-style deposits typical of the Murray Basin. For geotechnical and processing teams, the mix of zircon and rare earth-bearing minerals signals complex separation flowsheets and tailings management in fine-grained sands.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental