Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Philippi-Hagenbuch Hardox 500 Tuf truck floors: wear-life gains for mine fleets

    April 10, 2026|

    Reviewed by Joe Ashwell

    Philippi-Hagenbuch Hardox 500 Tuf truck floors: wear-life gains for mine fleets

    First reported on International Mining – News

    30 Second Briefing

    Philippi-Hagenbuch is switching all custom HiVol® haul truck bodies to floors built from SSAB Hardox® 500 Tuf, an abrasion-resistant steel with a nominal hardness of 500 HBW. The upgrade targets high-impact loading zones in off-highway trucks handling coarse, sharp ore, where floor gouging and wear typically drive frequent liner replacement. For mine operators, harder monolithic floors can extend body life, reduce downtime for relining, and allow more aggressive loading with large buckets or rock boxes without rapidly thinning the floor plate.

    Technical Brief

    • Floor plates are now specified as Hardox 500 Tuf, replacing previous lower-hardness steels in HiVol bodies.
    • Philippi-Hagenbuch is standardising this material change across all custom-engineered off-highway truck body designs.
    • Hardox 500 Tuf is supplied by SSAB, giving a single-source wear steel specification for floors.

    Our Take

    Both Philippi-Hagenbuch’s use of Hardox 500 Tuf and Schlam Payload’s Xeroline trays with SSAB Zero™ steel show SSAB steadily embedding its high-hardness plate across competing truck body OEMs, which can lock mines into SSAB’s supply chain for wear-critical components.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Brightstar’s 225.7m at Two Mile Hill: bulk underground design notes for engineers
    Mining
    28 minutes ago

    Brightstar’s 225.7m at Two Mile Hill: bulk underground design notes for engineers

    Brightstar Resources has reported a 225.7m intercept grading 3.11g/t gold from 284m depth in hole TMHRCD26006A at the Two Mile Hill–Shillington deposit, including a high-grade core of 19m at 24.3g/t, at its Sandstone project in Western Australia. The broad, unconstrained mineralisation from infill drilling materially strengthens the potential for a bulk underground mining scenario rather than a narrow-vein approach. Geotechnical and mine design teams will now be able to model a large, continuous orebody at depths beyond 280m, with implications for stope geometry, ground support and ventilation planning.

    Weir’s WARMAN MCR² mill circuit pump: reliability and wear-control notes for plant engineers
    Mining
    28 minutes ago

    Weir’s WARMAN MCR² mill circuit pump: reliability and wear-control notes for plant engineers

    Weir has launched the WARMAN MCR² mill circuit pump, targeting mineral processing plants facing more complex ores, higher slurry throughputs and harsher mill circuit conditions. The next-generation design builds on existing WARMAN MCR technology to give operators tighter control over wear behaviour, maintenance intervals and asset condition across variable campaigns. For plant engineers, the pump is aimed at stabilising performance in high-duty SAG and ball mill circuits where inconsistent liner and impeller wear can drive unplanned shutdowns and reduced availability.

    Nova powers IGO turnaround: late‑life mine cashflow lessons for planners
    Mining
    28 minutes ago

    Nova powers IGO turnaround: late‑life mine cashflow lessons for planners

    IGO’s Nova nickel–copper–cobalt mine in Western Australia generated $228.4 million in operating cash flow in FY25–26 as it approaches end of mining in the December 2026 quarter. The operation produced 15,304 tonnes of nickel in concentrate, 6754 tonnes of copper and 548 tonnes of cobalt, with IGO chief executive Ivan Vella calling it one of Nova’s strongest operational years. The strong cash generation late in mine life signals continued focus on grade control, cost discipline and decommissioning planning over the next 18 months.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental