Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    OreNova’s AI DFS tools for Horizon Gold: schedule and capex lens for engineers

    September 22, 2026|

    Reviewed by Joe Ashwell

    OreNova’s AI DFS tools for Horizon Gold: schedule and capex lens for engineers

    First reported on International Mining – News

    30 Second Briefing

    OreNova Engineering is deploying proprietary AI-based design tools to accelerate the definitive feasibility study for Horizon Gold’s Gum Creek project in Western Australia, targeting faster engineering of the mineral processing plant. The Perth-based firm is using automated process modelling and plant layout optimisation to compress design cycles that traditionally take months into weeks, while iterating multiple comminution and gold recovery flowsheets. For project engineers, this points to shorter DFS schedules, earlier capex definition and the ability to rapidly compare alternative plant configurations under varying throughput and ore characteristics.

    Technical Brief

    • OreNova’s proprietary AI tools are being applied specifically to Gum Creek’s mineral processing plant engineering.
    • Gum Creek, in Western Australia, is being positioned as a potential major new gold operation.
    • OreNova Engineering is Perth-based, enabling close interaction with Horizon Gold’s local study team.
    • AI workflows are being integrated with conventional process engineering rather than replacing standard design checks.
    • Horizon Gold gains in-house optionality to test multiple process plant concepts without full manual redesign.
    • For similar Australian gold projects, such tools could materially compress front-end engineering and design resourcing.

    Our Take

    OreNova Engineering already features in our database for AI-based compression of mineral processing plant engineering schedules (9 March 2026 item), so its deployment at Horizon Gold’s Gum Creek project signals that these tools are moving from development into live project workflows in Western Australia.

    Among gold-tagged mining pieces in our coverage, relatively few explicitly reference AI or artificial intelligence, suggesting Gum Creek could become an early test case for whether AI-driven design materially shortens DFS timelines for mid-tier Australian gold developers.

    With both OreNova and Horizon Gold based in the Perth/Western Australia corridor, this collaboration underscores how much of the early applied AI work in our mining project coverage is clustering around local engineering consultancies rather than global EPCMs, which may influence who smaller gold operators turn to for DFS support.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Ada Tepe mine waste benchmark: closure design and lessons for engineers
    Mining
    about 8 hours ago

    Ada Tepe mine waste benchmark: closure design and lessons for engineers

    Ada Tepe, Bulgaria’s first greenfield mine in over 40 years, has completed open-pit gold production and moved into rehabilitation, using dry-stack tailings and paste backfill to minimise conventional wet tailings storage. The Dundee Precious Metals operation was designed with filtered tailings deposition on a lined facility, progressive reclamation of waste rock dumps, and strict water recycling to limit discharge to local catchments. Its closure approach, including reshaping benches and re-vegetation to blend with the Rhodope Mountains terrain, is being positioned as a reference model for future EU mine waste projects.

    Mining
    about 8 hours ago

    Valmet flotation valves: control stability and recovery insights for plant engineers

    Valmet slurry flow specialist Juha Häkkinen sets out how flotation performance hinges on stable level control, correct valve sizing and consistent aeration across conventional cells, columns and flash flotation circuits. He focuses on control-valve behaviour in slurry duties, including cavitation, erosion and hysteresis, and how poor valve selection destabilises froth depth and air–slurry mixing. The piece points to tighter valve control and tailored trim designs as practical levers to improve recovery and reduce reagent overuse in brownfield flotation plants.

    Mining
    about 8 hours ago

    Platinum Blasting at New Burton mine: blast design and control notes for planners

    Platinum Blasting Services has secured the drill-and-blast contract for Argo Natural Resources’ New Burton Mine in Queensland’s Bowen Basin, extending a relationship established through similar services at the Broadlea Mine over the past two years. The scope will cover production drilling and blasting for open-cut coal operations in one of Australia’s highest-intensity blasting regions, where tight control of vibration, overpressure and fragmentation is critical for nearby infrastructure and dragline/shovel productivity. For mine planners and geotechnical teams, continuity of a single blasting contractor across Broadlea and New Burton should simplify blast design benchmarking, wall control practices and reconciliation of fragmentation performance.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental