Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Northern Star March gold surge: ramp-up implications for mine planners and contractors

    April 2, 2026|

    Reviewed by Tom Sullivan

    Northern Star March gold surge: ramp-up implications for mine planners and contractors

    First reported on Australian Mining

    30 Second Briefing

    Northern Star Resources’ March quarter gold sales have surged, signalling a production ramp-up across its Western Australian assets including Kalgoorlie Consolidated Gold Mines and the Super Pit. Management is positioning for record output in FY25–26 as processing throughput and mine development advance at key hubs such as Yandal and Pogo, supported by higher mill utilisation and improved grade control. For contractors and suppliers, the trajectory points to increased demand for underground development, open-pit fleet capacity, and plant optimisation services over the next 12–18 months.

    Technical Brief

    • Kalgoorlie Consolidated Gold Mines and Super Pit operations remain the dominant contributors to group sales volumes.

    Our Take

    Recent coverage of Northern Star Resources shows a pivot from a "challenging" period at its Kalgoorlie operations (January 22, 2026 item) toward fleet expansion and productivity gains, underlined by the commissioning of eight new Liebherr machines at the Super Pit in March 2026.

    With gold highlighted repeatedly in our database and a 40% price surge in 2025 lifting sector valuations, Kalgoorlie Consolidated Gold Mines in WA is operating in a price environment that tends to support higher stripping ratios and deeper cutbacks, which can justify ramp-up strategies despite cost pressures.

    Northern Star’s sale of a 50% interest in a high-grade undeveloped Northern Territory gold project to MGX Resources (February 5, 2026) suggests a capital-allocation focus on core Australian hubs like Kalgoorlie, which aligns with any planned production ramp-up at Kalgoorlie Consolidated Gold Mines in the 2025–26 window.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    38 minutes ago

    CDE–Stevin Rock Al Ghail wash plants: process and tailings notes for engineers

    CDE Group has secured orders from Stevin Rock to design and build two modular sand and aggregates wash plants rated at 1,000 t/h and 250 t/h for the company’s Al Ghail limestone operation in the UAE. The plants will process material from a site producing over 100 Mt/y, targeting improved recovery of manufactured sand and washed aggregates from high-volume quarry fines. For process and tailings engineers, the scale signals continued investment in wet processing to maximise resource utilisation and reduce waste in large Gulf limestone quarries.

    Marimaca’s thick Pampa Medina copper-silver hit: growth and pit design notes for engineers
    Mining
    44 minutes ago

    Marimaca’s thick Pampa Medina copper-silver hit: growth and pit design notes for engineers

    Marimaca Copper has intersected 216 metres grading 0.96% copper and 7.2 g/t silver from 466 metres in hole SPRD-15 at Pampa Medina in Chile’s Antofagasta Region, including 62 metres at 2.2% copper and 21.5 g/t silver from 602 metres, extending the copper-silver system 300 metres. Step-out holes such as SPD-13 (222 metres at 0.5% copper from 194 metres) and SPRD-12 (56 metres at 0.95% copper from 748 metres) support continuity of oxide and sulphide mineralisation across a 3 km by 1.5 km footprint. With 30,000 metres of drilling planned in 2026 and Pampa Medina only 28 km from the fully permitted Marimaca oxide project (179 Mt at 0.42% copper, 50,000 t/y cathode over 13 years), the results point to a potentially large sulphide growth option adjacent to near-term heap-leach development.

    Rio Tinto acquires Aurukun bauxite project: development and approvals lens for engineers
    Mining
    about 1 hour ago

    Rio Tinto acquires Aurukun bauxite project: development and approvals lens for engineers

    Rio Tinto has agreed to acquire the Aurukun Bauxite Project in Queensland from Glencore and Mitsubishi Development, adding to its regional bauxite portfolio anchored by the Weipa operations about 200 km north, which produce over 30 million tonnes of bauxite per year. Aurukun remains at Mineral Development Licence stage with no Mining Lease granted, and the Wik Waya Traditional Owners say they were not consulted on the sale. Financial terms were undisclosed and completion depends on Queensland government and other Australian regulatory approvals.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental