Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    North Stanmore mining licence deal: tenure and design implications for mine planners

    June 3, 2026|

    Reviewed by Tom Sullivan

    North Stanmore mining licence deal: tenure and design implications for mine planners

    First reported on Australian Mining

    30 Second Briefing

    Victory Metals has signed a Native Title Mining Agreement with the Wajarri Yamaji Aboriginal Corporation for the North Stanmore heavy rare earth project, clearing a key requirement for granting a Western Australian mining lease. The clay-hosted deposit, about 6km north of Cue, targets dysprosium and terbium within a broader rare earth assemblage considered strategically important for permanent magnets and defence supply chains. The agreement gives Traditional Owners defined cultural heritage protections and benefits while giving the proponent tenure certainty to progress mine design, approvals and funding.

    Technical Brief

    • Agreement with Wajarri Yamaji Aboriginal Corporation is a prerequisite step before Western Australian mining lease issue.
    • Tenure certainty enables detailed mine design, including pit geometry, haul roads and waste landform planning.
    • Native Title arrangements will need to be integrated into project approvals schedule and construction mobilisation sequencing.
    • Cultural heritage protection conditions may constrain drill-and-blast patterns, access tracks and surface infrastructure locations.
    • Early licence clarity allows geotechnical and hydrogeological fieldwork to be timed ahead of wet-season access issues.
    • Funding processes can now proceed on the basis of a defined mining tenure pathway, reducing permitting risk.

    Our Take

    North Stanmore is one of only a handful of heavy rare earth element projects in our mining database, and the combination of clay-hosted mineralisation and strong leach results reported on 1 April 2026 positions Victory Metals towards the lower end of the processing complexity spectrum for HREEs in Western Australia.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Electra–WMC Ontario cobalt refinery deal: cashflow and offtake lens for engineers
    Mining
    about 9 hours ago

    Electra–WMC Ontario cobalt refinery deal: cashflow and offtake lens for engineers

    Electra Battery Materials has signed a five-year working-capital and commercial partnership term sheet with Swiss commodities trader WMC Group AG to finance cobalt feedstock purchases and market battery-grade cobalt sulfate from its Temiskaming Shores refinery in northern Ontario. The deal covers logistics management, inventory working capital and exclusive marketing of output up to the plant’s nameplate capacity as Electra restarts North America’s only cobalt sulfate refinery, backed by US and Canadian government funding. The structure is aimed at smoothing the operating cash cycle as the project moves from construction and commissioning into production.

    SSR–Roxmore $464M deal: Nevada gold mine capex and NPV lens for planners
    Mining
    about 9 hours ago

    SSR–Roxmore $464M deal: Nevada gold mine capex and NPV lens for planners

    SSR Mining will acquire Nevada-focused Roxmore Resources for C$660.1 million in cash, securing the Converse open-pit project 6 km west of its Marigold mine, where a PEA outlines 250,000 oz. per year over 15 years, with a post-tax NPV of $2.7 billion at $3,600/oz. gold and a 42.8% IRR. Converse, hosting 103 million indicated tonnes at 0.65 g/t and 218 million inferred tonnes at 0.43 g/t, could lift SSR’s US output to 350,000–400,000 oz. annually from 2033–2042, despite an $829 million initial capex. In parallel, an updated Marigold plan extends mine life to 20 years, boosts probable reserves 43% to 4.6 million oz., and more than triples post-tax NPV to $3.3 billion, with life-of-mine capex rising to $1.3 billion and Buffalo Valley (700,000 oz. reserves) feeding first ore from 2029.

    The Ore Wars 2002–2026: iron ore price cycles mapped for mine planners
    Mining
    about 9 hours ago

    The Ore Wars 2002–2026: iron ore price cycles mapped for mine planners

    Iron ore’s journey from a $13/t, annually negotiated benchmark in 2002 to a daily traded futures market peaking at $237.57/t in May 2021 is mapped in MINING.COM’s “Ore Wars” interactive, tracking 49 key inflection points. The timeline covers BHP’s failed $140 billion bid for Rio Tinto, the collapse to $37/t in December 2015, the Samarco and Brumadinho tailings disasters, and China’s push for yuan‑denominated pricing. For mine planners and marketers, it neatly links price shocks to supply surges, port stockpiles, freight rates and single‑buyer risk.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental