Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Nolans rare earths project: supply, processing and contract notes for mine planners

    May 22, 2026|

    Reviewed by Joe Ashwell

    Nolans rare earths project: supply, processing and contract notes for mine planners

    First reported on Australian Mining

    30 Second Briefing

    Arafura Rare Earths has approved construction of the Nolans rare earths project, 135km north of Alice Springs in the Northern Territory, after more than 20 years of exploration and feasibility work. Backed by federal funding and offtake support from international customers including Hyundai and Kia, Nolans is designed as an integrated mine and processing plant producing neodymium-praseodymium (NdPr) oxide for permanent magnets. The project strengthens non-Chinese supply options for magnet rare earths, with implications for long-term contracts, processing technology selection and downstream value-adding in Australia.

    Technical Brief

    • For other Australian mining projects, Nolans’ integrated flowsheet signals a shift towards local downstream processing.

    Our Take

    The recent final investment decision on the Nolans rare earths project, noted in our 21 May coverage, means this contract award phase is occurring with funding and execution risk already partly de‑risked, which typically sharpens pricing and competition among EPC and mining services bidders in the Northern Territory.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 11 hours ago

    RKX Rock Extraction electric pulse rock breaking: design and risk notes for mines

    RKX Rock Extraction is set to unveil an electric pulse rock-breaking system at Hillhead 2026, targeting operations where explosives are restricted or supply-constrained and hydraulic hammers are slow, noisy and maintenance-intensive. The Lisburn-based company’s technology uses high-voltage electrical pulses to fracture rock in situ, eliminating on-site explosive storage and reducing flyrock, vibration and dust. For mines and quarries facing tight vibration limits near infrastructure or communities, the method could open additional extraction zones and simplify permitting for selective breakage and scaling.

    Mining
    about 11 hours ago

    Pilar Gold PGDM Resemin–TEMPUS fleet: design and productivity notes for engineers

    Pilar Gold Inc has selected Resemin and Sotreq as strategic equipment partners to supply a new underground fleet for the restart and modernisation of its PGDM gold mining complex in Brazil. The ordered package includes Resemin jumbo drills and production rigs, paired with TEMPUS-branded underground support equipment, to mechanise drilling and production across the mine’s ramp-accessed stopes. The deal signals a shift from legacy fleets towards standardised, OEM-supported rigs, with implications for ground support design, development advance rates and maintenance planning at PGDM.

    Mining
    about 11 hours ago

    Greenland Resources’ Malmbjerg and LTU BOREAS: automation takeaways for mine planners

    Greenland Resources has joined Luleå Tekniska Universitet’s BOREAS consortium, alongside 12 other partners, to develop autonomous robotic systems for its Malmbjerg molybdenum project in central-east Greenland. The collaboration targets robotic support for construction, operation and maintenance in remote, high-relief terrain, where steep slopes, ice, and limited access complicate conventional open-pit development. For mine planners and geotechnical teams, the work signals future deployment of field robots for tasks such as bench inspection, slope monitoring and infrastructure upkeep under Arctic conditions.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental