Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    NexGen expands Sask uranium drilling: key takeaways for mine planners and engineers

    August 27, 2026|

    Reviewed by Tom Sullivan

    NexGen expands Sask uranium drilling: key takeaways for mine planners and engineers

    First reported on MINING.com

    30 Second Briefing

    NexGen Energy is expanding drilling at the Patterson Corridor East discovery in Saskatchewan’s Athabasca Basin, adding a fifth rig after gamma probe results showed continuous high-grade uranium, including hole RK-26-293 with 4.7 metres above 10,000 cps and a 0.1-metre interval over 61,000 cps. Additional holes RK-26-290c1 and RK-26-294 returned 19.5 metres and 6.9 metres respectively above 10,000 cps, with 3.1 metres in RK-26-294 exceeding 61,000 cps, and mineralisation remains open in most directions. The company has drilled 20,138.7 metres of a planned 42,000 metres while concurrently building the nearby Rook I project at the Arrow deposit, 3.5 km west.

    Technical Brief

    • Continuous core samples are dispatched to the Saskatchewan Research Council Geoanalytical Laboratory for independent uranium assay.
    • PCE lies in the Athabasca Basin, over 600 km southeast of Saskatoon, implying remote logistics.
    • Mineralisation remaining open in most directions suggests additional drilling along strike and down-dip is likely.
    • Similar Athabasca projects often transition from gamma-guided exploration to resource definition drilling once SRC assays confirm grade continuity.

    Our Take

    Canada’s new national uranium strategy, which highlights Athabasca Basin projects including NexGen’s, means any additional high‑grade discoveries near the Arrow deposit could quickly gain strategic importance for meeting the country’s 2035 export‑doubling ambitions.

    NexGen’s repeated appearance in our uranium‑tagged coverage, alongside Cameco and Denison Mines, indicates it is now consistently grouped with established Canadian producers in policy and market discussions rather than being viewed purely as a single‑asset developer.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    US DOE $10M critical minerals R&D: process insights for mining engineers
    Mining
    about 2 hours ago

    US DOE $10M critical minerals R&D: process insights for mining engineers

    The US Department of Energy has awarded $10 million via the Critical Materials Innovation Hub to seven early-stage R&D projects targeting more efficient recovery and refining of rare earth elements, gallium, copper and other critical materials. Funded work includes chloride-based molten salt electrolysis for heavy rare earth production at Case Western Reserve, hydro and bio-hydrometallurgical copper extraction at Colorado School of Mines, and nanobubble–surfactant–reactive oxygen leaching of copper sulphides at the University of Arizona. FAST Metals, Indium Corporation, Oak Ridge National Laboratory and the University of Illinois will trial solid-phase extraction, advanced ion-exchange resins and redox-adsorbents to recover gallium and mixed rare earth oxides from bauxite-alumina circuits, zinc refinery residues and industrial byproduct streams.

    Maglut Heavy Industries rare earth strategy: ARC-1 process insights for mine planners
    Mining
    about 2 hours ago

    Maglut Heavy Industries rare earth strategy: ARC-1 process insights for mine planners

    Maglut Heavy Industries is developing a chromatography-based rare earth processing platform at its pilot-scale Long Beach, California facility, reporting 99.9%+ purity for individual rare earth oxides using its ARC-1 water-based separation process. The company designs and manufactures its own resin and ligand systems, aiming for globally competitive costs versus conventional solvent extraction as US defence contractors face January 2027 rules to eliminate Chinese rare earth magnets. A demonstration-scale plant is planned to be fully operational by August 2027, producing commercial rare earth oxides and potentially expanding to other critical minerals.

    Gold price retreats from three‑month high: risk notes for mine planners
    Mining
    about 2 hours ago

    Gold price retreats from three‑month high: risk notes for mine planners

    Gold retreated from a three-month high after July US PCE inflation printed at 3.7% headline and 3.3% core, with Comex December futures down 1% to $4,649.10/oz and spot off 1.4% at $4,592.53 by late morning in New York. The pullback follows a 14% August surge in bullion, driven by US Treasury bond-market intervention and a 28-tonne weekly inflow into gold-backed ETFs, ahead of Kevin Warsh’s first Jackson Hole speech as Fed chair. Gold and silver miners still post outsized August gains, with Eldorado up 55%, Equinox 53% and Newmont 41%.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental