Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Sustainability

    Morgan Sindall at Birchington Primary: low‑carbon block design notes for engineers

    March 25, 2026|

    Reviewed by Tom Sullivan

    Morgan Sindall at Birchington Primary: low‑carbon block design notes for engineers

    First reported on The Construction Index

    30 Second Briefing

    Morgan Sindall Construction has begun phase-two works on a £13.4m replacement teaching block at RAAC-affected Birchington Church of England Primary School in Kent, delivering a two-storey, 1,455 sqm facility with 10 classrooms, a hall, ICT suite and extended hard-play areas by summer 2027. The timber-frame structure will be fabricated off site, use bio-solar roofing with extensive PV panels, and be powered by ground source heat pumps, with embodied carbon tracked via the CarboniCa tool. Reclaimed bricks from demolished buildings will be reused as façade detailing, supported by Encore Environment’s waste management input and Morgan Sindall’s 10-tonne carbon challenge.

    Technical Brief

    • Phase one delivered two temporary accommodation blocks to decant pupils from RAAC-affected buildings.
    • Morgan Sindall’s contract with the Department for Education is valued at £13.4m for this scheme.
    • Phase two scope includes full demolition of former teaching buildings prior to constructing the permanent block.
    • Internal layout adds four group rooms, a dedicated library, kitchen and ICT suite to the 10 classrooms.

    Our Take

    With both this scheme and the Burnside Secondary Pupil Referral Unit being delivered for the Department for Education, Morgan Sindall Construction is consolidating its position on DfE frameworks, which typically favours repeat contractors that can demonstrate consistent delivery and carbon performance across multiple sites.

    The use of a quantified 10-tonne carbon reduction challenge on a relatively modest primary school project in Kent signals that Morgan Sindall’s sustainability tools (such as CarboniCa) are now being normalised on mainstream southern home counties education work, not just on flagship low-energy builds like Broadford Primary School.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Strabag’s Pfaffensteig Tunnel contract: design and delivery notes for rail engineers
    Infrastructure
    about 1 month ago

    Strabag’s Pfaffensteig Tunnel contract: design and delivery notes for rail engineers

    Strabag and Group company Züblin have secured the design-and-build structural works for the ABS Gäubahn Nord/Pfaffensteig Tunnel in south-west Germany, centred on an 11km twin-bore rail tunnel linking Stuttgart Airport station directly to the Gäubahn line towards Switzerland. About 9.8km will be driven by two TBMs, with conventional tunnelling for the A8 motorway undercrossing and airport connection, plus a 240m cut-and-cover section, retaining structures, railway underpasses and a grade-separated crossing. A 3km surface section will be upgraded and partially realigned for 200km/h operation, delivered under an integrated project delivery model with Ed. Züblin, Wayss & Freytag and Strabag AG sharing tunnelling, structural and earthworks packages.

    National Grid TBM under the Thames: tunnelling design and risk notes for engineers
    Infrastructure
    3 months ago

    National Grid TBM under the Thames: tunnelling design and risk notes for engineers

    A 271.5‑tonne Herrenknecht Mixshield TBM, Caroline, has started driving a 2.2km electricity cable tunnel with a 4m internal diameter beneath the River Thames in Essex for National Grid’s Grain to Tilbury project, delivered by the Ferrovial BEMO joint venture. The drive will pass through variable Thames estuary ground conditions between 35m‑deep launch and reception shafts of 15m and 12m diameter, with tunnelling continuing into 2026 and overall scheme completion targeted for 2029. The new tunnel will replace the 1969 Thames Cable Tunnel and carry new high‑voltage circuits between Grain and Tilbury substations.

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers
    Infrastructure
    4 months ago

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers

    A 13.46m diameter Herrenknecht Mixshield TBM has broken through into the future Balboa station on Panama Metro Line 3 after completing the first-ever TBM undercrossing of the Panama Canal at depths exceeding 60m below sea level. The 5,600kW, 26,616kNm machine, fitted with an accessible cutterhead and more than 4,500 sensors linked via the Herrenknecht.Connected platform, has achieved peak advance of 150 segment rings (about 300m) per month through mixed sandstone, tuff, breccias and basalt. Around 1.5km of the 4.5km twin-track tunnel remains to final breakthrough.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy