Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    MMD and next‑gen material movement: design and planning notes for mine engineers

    June 4, 2026|

    Reviewed by Tom Sullivan

    MMD and next‑gen material movement: design and planning notes for mine engineers

    First reported on International Mining – News

    30 Second Briefing

    MMD used The Electric Mine 2026 conference in Lisbon to detail its acquisition of global rights to an intelligent material handling system designed to integrate in-pit crushing, conveying and truck haulage. The company is positioning the technology for fully mobile and semi-mobile IPCC layouts, targeting higher throughput and lower energy use than conventional truck-only haulage, particularly in deep open pits. For mine planners and geotechnical teams, the approach implies earlier commitment to fixed crusher locations, re-profiled ramp geometries and tighter control of bench stability around conveyor corridors.

    Technical Brief

    • MMD has secured global rights to an intelligent material handling system from the original developer.

    Our Take

    Recent pieces on MMD’s TraxIQ platform and its acquisition of Anglo American’s IP show the company moving from being a pure equipment supplier towards offering integrated material-handling systems, which is likely to be a key talking point at The Electric Mine 2026 in Portugal.

    Our database links MMD’s latest HYD Sizer work in rare earth element and manganese projects to higher-moisture, variable-ore conditions, signalling that the ‘next generation’ theme here is as much about handling complex orebodies as it is about electrification or autonomy.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 5 hours ago

    Weichai LOVOL 200 t mining excavator: fleet design and loading insights for engineers

    Weichai-controlled LOVOL Heavy Industry has delivered its first FR2000F hydraulic mining excavator, a 212 t class machine, to an open-pit mine customer in China. The FR2000F is powered by a Weichai 12M33 low-speed, high-torque, fully electronically controlled engine with quad-turbocharging and an advanced modular design, aimed at high-load, continuous mining duty. The 200 t class size positions it for pairing with ultra-class haul trucks, potentially altering fleet configurations and loading cycle times on large benches.

    Boton–BHP–Hancock iron ore conveyors: design and reliability notes for engineers
    Mining
    about 5 hours ago

    Boton–BHP–Hancock iron ore conveyors: design and reliability notes for engineers

    Boton is deepening conveyor technology collaboration with BHP and Hancock Iron Ore, hosting senior delegations at its Wuxi headquarters to review performance of its high-wear belt materials and advanced splice designs on large iron ore overland systems. Discussions reportedly centred on extending belt life in abrasive Pilbara ores, optimising idler spacing and troughing angles for higher tonne-per-hour capacities, and integrating condition monitoring for early detection of misalignment and shell wear. For mine operators, the work signals continued incremental gains in conveyor availability and reduced maintenance shutdown frequency on long-haul ore routes.

    Mining
    about 7 hours ago

    PLS Pilgangoora mid-stream lithium plant: integration lessons for mine planners

    PLS has commissioned Australia’s first mine-site lithium mid-stream processing facility at its Pilgangoora Operation in Western Australia, with Premier Roger Cook officiating the opening, marking a shift from exporting raw spodumene concentrate towards higher-value battery materials. The Mid-Stream Demonstration Plant is integrated directly with the existing open-pit and concentrator complex, enabling on-site conversion steps that are normally performed at distant chemical refineries. For mine planners and process engineers, this signals growing interest in co-locating beneficiation and mid-stream refining to cut logistics, reduce intermediate handling and tighten quality control.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental