Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Contract Award

    MinRes mining services half-year record: contracting signals for mine planners

    March 3, 2026|

    Reviewed by Joe Ashwell

    MinRes mining services half-year record: contracting signals for mine planners

    First reported on Australian Mining

    30 Second Briefing

    Mineral Resources’ mining services division posted a record first-half result, with volumes and revenue boosted by strong external demand and ramp-up activity at the Onslow Iron project in Western Australia. The business expanded crushing and processing contracts across multiple iron ore hubs, while deploying additional mobile crushing plants and higher-capacity haulage fleets to lift throughput. For contractors and mine operators, the performance signals continued appetite for outsourced crushing, screening and haulage, particularly on large-scale Pilbara-style iron ore developments.

    Technical Brief

    • For similar greenfield iron ore hubs, outsourced crushing–haulage packages can de-risk early-stage capex and schedule.

    Our Take

    In our database of 1107 Mining stories, Mineral Resources (MinRes) features disproportionately in Australia-tagged project coverage, signalling that its contracting arm is now as closely watched as its upstream iron ore and lithium positions.

    Related coverage of MinRes commissioning the Onslow Iron port facilities at Port of Ashburton suggests that record mining services volumes are being underpinned by in-house demand from its own large iron ore projects, rather than third-party work alone.

    The Lamb Creek iron ore development in the Pilbara, already flagged in recent articles as a 7.5 Mtpa project, indicates a growing internal pipeline that could smooth MinRes’ mining services utilisation across multiple hubs in Western Australia.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 3 hours ago

    Orica’s Danafloat copper flotation move: integration and design notes for plant engineers

    Orica has moved into copper processing chemistry by acquiring FMC Corporation’s Danafloat™ range of high-performance flotation collectors, used for copper and other “future facing” commodities. The deal covers proprietary formulations designed to maximise sulphide ore recovery and improve concentrate grade while reducing reagent dosage and environmental impact. For concentrator operators, this adds a major explosives and blasting supplier into the flotation reagent supply chain, potentially enabling tighter integration between upstream fragmentation and downstream recovery optimisation.

    National Group backing mining excellence: project delivery lessons for engineers
    Mining
    about 3 hours ago

    National Group backing mining excellence: project delivery lessons for engineers

    Queensland-based mining services provider National Group is sponsoring a community-focused award recognising resources companies that show strong engagement and deliver measurable change across the sector. The award targets operators and contractors working in Queensland’s coal, metals and quarrying projects, with assessment centred on local employment, training programmes and long-term community investment rather than short-term donations. For geotechnical and mining teams, this signals growing scrutiny of how project delivery, contractor selection and site rehabilitation strategies translate into tangible regional benefits.

    Smarter filtration solutions: dewatering and tailings design notes for plant engineers
    Mining
    about 4 hours ago

    Smarter filtration solutions: dewatering and tailings design notes for plant engineers

    Smarter filtration solutions in wet mineral processing are focusing on high-pressure tower filter presses for slurry dewatering, such as Thejo’s vertical plate designs that deliver low-moisture filter cakes and high filtrate recovery. Suppliers are pairing these presses with automated cloth washing, cake discharge monitoring and optimised cycle control to stabilise throughput and reduce unplanned downtime. For plant designers, the shift is towards integrating filtration with upstream thickening and downstream dry stacking to cut fresh water intake and tailings storage volumes.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.