Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Product
    Projects

    Metso dry grinding at Jerritt Canyon: design and water-balance notes for plant engineers

    November 16, 2026|

    Reviewed by Joe Ashwell

    Metso dry grinding at Jerritt Canyon: design and water-balance notes for plant engineers

    First reported on Australian Mining

    30 Second Briefing

    Metso has secured an order to supply its Metso Loesche VRM dry grinding technology and auxiliary equipment to First Majestic Silver’s Jerritt Canyon gold mine restart project in Nevada, marking one of the first deployments of this VRM system in hard-rock gold operations. The vertical roller mill will run in dry mode, eliminating process water from the grinding circuit and reducing the need for large slurry pumps and thickeners. For plant designers, the package signals a shift towards more compact grinding layouts and lower water balances in brownfield gold restarts.

    Technical Brief

    • Order scope covers dry grinding technology only, with Metso as OEM for both core mill and ancillaries.
    • VRM selection indicates a move away from traditional SAG/ball mill wet circuits at this brownfield site.
    • Compact VRM footprint is suited to existing Jerritt Canyon plant geometry and restart CAPEX constraints.
    • Dry grinding configuration reduces reliance on slurry handling infrastructure during recommissioning of the process plant.
    • Metso positions this reference as an early hard‑rock mining deployment of its Loesche-derived VRM platform.
    • For similar mining restarts, dry VRM circuits may simplify permitting where water rights are constrained.

    Our Take

    Metso’s Jerritt Canyon order sits alongside several other recent gold-sector installations in our database, such as Eldorado Gold’s Skouries filter presses, signalling that Metso is deepening its role in critical-path process equipment for gold projects rather than just greenfield studies.

    The use of Metso Loesche VRM dry grinding in Nevada is consistent with Metso’s current push on energy-efficient comminution solutions highlighted at IMARC 2026, which likely reflects pressure on US gold operations to cut power and water intensity in arid regions.

    With First Majestic Silver traditionally associated with Mexican silver operations, the Jerritt Canyon restart in Nevada broadens its North American gold footprint, which in our coverage tends to give mid-tier precious metals producers more optionality in hedging and jurisdictional risk management.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Austral–Hammer Metals takeover: copper pit options and risks for mine planners
    Mining
    about 1 hour ago

    Austral–Hammer Metals takeover: copper pit options and risks for mine planners

    Austral Resources has secured Federal Court approval for its scheme of arrangement to acquire Hammer Metals, with the deal becoming legally effective on 16 November and aimed at expanding copper operations in north-west Queensland. The transaction consolidates Austral’s existing Lady Annie–type heap leach and SX–EW copper production footprint with Hammer’s Mount Isa–region exploration ground, including several IOCG and copper–gold targets. For geotechnical and mine planners, the combined tenure increases optionality for open-pit and potential underground copper development in a tightly contested Queensland copper belt.

    Tungsten Mining’s Watershed project: DFS economics and design notes for engineers
    Mining
    about 1 hour ago

    Tungsten Mining’s Watershed project: DFS economics and design notes for engineers

    Tungsten Mining’s definitive feasibility study for the Watershed tungsten project in Far North Queensland reports a pre-tax net present value of $1.57 billion and internal rate of return of 70 per cent, with post-tax figures of $1.11 billion NPV and 57 per cent IRR. The project centres on open-pit extraction of scheelite and wolframite ores, with processing via conventional crush–grind–flotation to produce tungsten concentrate. These economics signal a potentially high-margin Australian tungsten supply source, relevant for long-term offtake and project finance decisions.

    Mount Isa critical minerals hub: feasibility insights for process engineers
    Mining
    about 1 hour ago

    Mount Isa critical minerals hub: feasibility insights for process engineers

    A proposed critical minerals and rare earths research centre in Mount Isa has secured a $965,000 commitment from the Australian and Queensland governments and Mount Isa City Council to fund a feasibility study. The concept focuses on metallurgical testing, piloting and treatment of critical minerals and rare earths, potentially giving North West Queensland miners local access to bench‑scale and pilot‑scale process development instead of sending samples interstate. For geometallurgy and flowsheet design teams, a local hub could shorten testwork lead times and de‑risk new processing routes for complex orebodies.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental