Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Sustainability

    Meiteng’s full-size coal dry separation plant in Mongolia: design notes for mine engineers

    May 25, 2026|

    Reviewed by Joe Ashwell

    Meiteng’s full-size coal dry separation plant in Mongolia: design notes for mine engineers

    First reported on International Mining – News

    30 Second Briefing

    Meiteng Technology’s full-size intelligent coal dry separation plant in Mongolia has run stably since October 2025, using its proprietary DCP Full-Size Coal Dry Separation Dream Plant system under harsh continental climate conditions. The installation applies fully dry, sensor-based coal separation without process water, reducing reliance on traditional dense medium circuits and associated tailings dams. For mine operators in arid or freezing regions, the project signals growing viability of large-scale dry beneficiation where water supply, freezing pipelines and slurry management constrain conventional plants.

    Technical Brief

    • The installation is described as “intelligent”, implying integrated sensor control, automated sorting logic and centralised plant optimisation.
    • Dry separation eliminates slurry handling equipment, enabling a simplified plant layout and reduced rotating machinery inventory.
    • Absence of process water circuits removes risk of pipeline freezing, pump cavitation and thickener rake torque overloads in sub‑zero conditions.

    Our Take

    Meiteng Technology’s coal work in Mongolia sits alongside its XRT ore sorting deployments for lead-zinc in Tajikistan (commissioned in 2026), signalling a push to commercialise intelligent dry or pre-concentration separation across multiple bulk and base-metal commodities.

    Stable operation reported from 2025 positions this DCP Full-Size Coal Dry Separation Dream Plant as an early reference site; for other coal projects tagged under ‘Projects’ and ‘Sustainability’, such a reference can materially de‑risk adoption of dry separation in arid or water‑constrained regions.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 11 hours ago

    Sandvik underground fleet at Kamoa-Kakula: haulage and maintenance lens for engineers

    Sandvik has secured an order from Kamoa Copper SA for 19 Toro® underground trucks and loaders for the Kamoa-Kakula Copper Complex in the Democratic Republic of the Congo, taking the site’s Sandvik underground fleet to more than 100 units. The equipment will support one of the world’s largest underground Sandvik fleets at a single mine, operated by the Ivanhoe Mines–Zijin Mining joint venture. For engineers, the scale signals sustained high-volume, trackless underground haulage and significant long-term demand for OEM parts, maintenance capacity, and fleet management systems.

    Mining
    about 11 hours ago

    Metso Durarok™ primary sizer at Yenipazar mine: design and throughput notes for engineers

    Metso has secured a €25 million order from Aldridge Mineral Madencilik A.Ş., part of CVK Mining, to supply key minerals processing equipment for the Yenipazar polymetallic mine in Türkiye, including one of its first Durarok™ primary sizers. The package, booked in Metso’s Minerals segment for 2026, will support primary crushing and downstream processing for a deposit containing multiple base and precious metals. For engineers, early adoption of the Durarok™ sizer at Yenipazar will be a reference case for hard-rock primary sizing performance in Turkish conditions.

    Mining
    about 11 hours ago

    Volvo Autona / earth autonomous haulage: key takeaways for mine planners

    Volvo Autonomous Solutions has launched Autona / earth, a commercial autonomous haulage system for mines and quarries built around an autonomous Volvo FH truck and an in-house developed virtual driver. The package is delivered as Transport-as-a-Service, with Volvo providing the vehicle automation stack, site infrastructure, operational support and maintenance rather than selling trucks outright. The system is designed to plug into existing mine haulage operations, signalling a shift towards OEM-managed autonomous fleets where OEMs assume more responsibility for uptime and performance.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental