Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    MaxMine predictive fleet allocation: dispatch and haulage insights for mine planners

    November 27, 2026|

    Reviewed by Joe Ashwell

    MaxMine predictive fleet allocation: dispatch and haulage insights for mine planners

    First reported on MINING.com

    30 Second Briefing

    MaxMine has launched its Fleet Allocation tool, a predictive fleet allocation system that models haul circuits up to 40 minutes ahead using real-time and historical data updated every 10 seconds. The prediction engine applies mathematical and statistical modelling to loading, transit and dumping times, and auto-builds a dynamic road network from truck movements, removing the need for dispatchers to manually redraw changing haul routes. Piloted at mines in the Pilbara and Queensland, the tool lets dispatchers test truck additions or reallocations and see likely impacts on queues, waiting times and loader idle periods before committing.

    Technical Brief

    • Prediction engine classifies equipment activity across the full haul cycle: loading, transit and dumping segments.
    • Dynamic map auto-builds and updates the haul road network directly from logged truck trajectories.
    • Automation removes manual redrawing of haul routes as pits advance, dumps shift and ramps realign.
    • One pilot dispatcher refused to switch off the prototype after testing; it remained in use ~2 months.
    • Update cadence of 10 seconds supports near-real-time reaction to short-term haul circuit disturbances.
    • Tool is positioned as analogous to “air traffic control” for mining trucks, centralising route and timing decisions.
    • Early user demand accelerated MaxMine’s development roadmap, bringing Fleet Allocation to market sooner than planned.

    Our Take

    The new predictive allocation tool extends a rapid sequence of MaxMine launches (Pulse in July 2026 and the MAXI AI assistant in August 2026), signalling a push to build a full AI-enabled fleet management stack rather than point solutions for Australian operations in regions like the Pilbara and Queensland.

    Our database shows multiple recent MaxMine deployments across large contractors such as NRW Holdings and Macmahon, which suggests this predictive tool could be rolled out quickly across mixed OEM fleets rather than being tied to a single truck brand or commodity type in Australia.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    BC Securities Commission insider case: governance takeaways for gold project teams
    Mining
    about 2 hours ago

    BC Securities Commission insider case: governance takeaways for gold project teams

    BC Securities Commission confirmed that the BC Prosecution Service has stayed two Criminal Code insider trading charges laid in 2025 against investment fund operator Douwe van Hees, linked to information allegedly obtained from then–Westhaven Gold CFO and co-founder Shaun Pollard. Pollard, who served as Westhaven’s CFO for over 14 years until February 2025, had all charges against him dropped in October 2025. Van Hees had previously been released on C$150,000 bail and, through counsel at Martland Saulnier, continues to maintain his innocence.

    Nyrstar Budel zinc smelter halt: energy, cost and risk takeaways for engineers
    Mining
    about 2 hours ago

    Nyrstar Budel zinc smelter halt: energy, cost and risk takeaways for engineers

    Nyrstar, owned by Trafigura, will halt zinc production at its Budel electrolytic smelter in the Netherlands from 30 November, citing sharply higher energy costs and weak zinc smelter margins. CEO Matt Hadfield warned that sustained power price pressure is making European zinc processing uneconomic without rapid policy support to retain “strategic processing capacity”. The plant will be kept in safe care-and-maintenance, with no immediate redundancies among permanent staff, but a strategic review of Budel’s long-term future is still in progress.

    Hitachi excavator 100,000-hour milestone: reliability lessons for mine planners
    Mining
    about 2 hours ago

    Hitachi excavator 100,000-hour milestone: reliability lessons for mine planners

    A Hitachi EX5500-6 ultra-large hydraulic excavator at Vulcan Mozambique’s Moatize coal mine has surpassed 100,000 operating hours after 16 years of continuous 24-hour service, while remaining in active production. Delivered in June 2010 and reaching the milestone in July 2026, the unit has worked in Moatize’s complex geological geometry, where stringent mine planning and maintenance are required to sustain continuous loading operations. Vulcan now operates five Hitachi ultra-large excavators with 14 rigid dump trucks on site, supported by local Hitachi parts, servicing and technical assistance.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental