Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    MasterMined optimisation platform: whole-of-mine decision insights for engineers

    November 18, 2026|

    Reviewed by Joe Ashwell

    MasterMined optimisation platform: whole-of-mine decision insights for engineers

    First reported on International Mining – News

    30 Second Briefing

    MasterMined is developing a systems-led mining optimisation platform that uses integrated data, visualisation and simulation to quantify the value of cross-discipline decisions. The approach links geology, geotechnical design, mine planning, development, materials handling, ventilation, infrastructure and production into a single operational model rather than separate silos. For engineers, this points to scenario testing of whole-of-mine constraints and trade-offs before implementation, potentially changing how cut-off grades, haul profiles, ventilation layouts and development sequences are selected.

    Technical Brief

    • For other mines, the approach implies a shift from discipline-optimised KPIs to whole-of-operation value metrics.

    Our Take

    MasterMined’s collaboration with International Mining places it alongside other technology-forward features in our database, such as Global Air Cylinder Wheels’ ASW order and Sandvik’s postgraduate mining engineering programme, signalling that the publication is increasingly a platform for operational innovation rather than just project news.

    Because International Mining is a recurring media partner for large conferences like IMARC, any operational tools or platforms MasterMined is showcasing are well positioned to be picked up in conference agendas or case-study sessions, which can accelerate adoption across multiple mine sites rather than through one-off pilots.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 2 hours ago

    Epiroc SmartROC D65 at Vicuña copper: drilling automation lens for mine planners

    Two Epiroc SmartROC D65 surface drill rigs will be deployed at the Vicuña copper project in Argentina, a 50:50 BHP–Lundin Mining joint venture described by Epiroc Southern Cone General Manager Patricio Lagarini as one of the world’s major emerging copper developments. The SmartROC D65 platform is typically used for 110–229 mm production blastholes and pre-split drilling in large open pits, bringing automated drilling sequences and GPS-based hole navigation suited to high-altitude Andean conditions. For mine planners and drill‑and‑blast engineers, the move signals early adoption of fully programmable, data-rich drilling for future large-scale pit development.

    Ground View Pakistan: skills pipeline and mining shift explained for engineers
    Mining
    about 3 hours ago

    Ground View Pakistan: skills pipeline and mining shift explained for engineers

    Pakistan’s Quaid-i-Azam University Earth Sciences department reports record undergraduate intake in geology and geophysics even as master’s and PhD applications have halved in a decade, from over 70 to about 30 per semester, amid rising mineral exploration demand. Chair of department Dr Shazia Naseem says mineral work is now overtaking petroleum, with graduates split roughly 50:50 between oil and gas and mining roles at OGDC, Mari, Pakistan Oilfields and private explorers. Around 20–30% of graduates leave to work abroad, creating a skills drain just as projects such as Reko Diq and “untapped” Balochistan prospects need local expertise.

    Mining
    about 2 hours ago

    Multotec’s trommel screens: optimisation lessons for plant and process engineers

    Multotec argues that trommel screens remain undervalued in plant optimisation despite being central to size classification and stable downstream performance in milling and leaching circuits. The company points to incremental advances such as modular polyurethane or rubber panels, optimised open-area layouts, and improved scroll and lifter configurations that raise screening efficiency and reduce blinding and wear. For plant engineers, the message is that detailed trommel design and maintenance strategies can materially affect throughput, circulating loads, and liner life without major capital changes elsewhere in the circuit.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental