Geomechanics.io

  • Free Tools
Sign UpLog In
AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Lynas–JARE rare earths deal to 2038: supply-chain and project signals for miners

    March 10, 2026|

    Reviewed by Joe Ashwell

    Lynas–JARE rare earths deal to 2038: supply-chain and project signals for miners

    First reported on Australian Mining

    30 Second Briefing

    Lynas Rare Earths has extended its supply and funding agreement with Japan Australia Rare Earths (JARE) to 2038, locking in long-term offtake for Japanese customers and continued support for its Mt Weld mine and downstream processing assets. The deal secures financing flexibility through JARE’s existing loan facilities while underpinning feedstock for Lynas’ cracking and leaching plants in Kalgoorlie and Kuantan. For rare earths project developers, the move signals sustained Japanese backing for non-Chinese NdPr and heavy rare earth supply chains.

    Technical Brief

    • Extended tenor allows Lynas to align mine life, reserve conversion and downstream plant life with contracted demand.

    Our Take

    Rare earths appear in only 74 keyword‑matched pieces across our mining coverage, so a long‑dated offtake into Japan positions Lynas Rare Earths as one of a relatively small group of operators with visibility on demand beyond the 2030s.

    Locking in Japanese offtake to 2038 from Australia effectively underpins non‑Chinese supply for high‑spec magnets and electronics, which is likely to support financing and expansion decisions for Lynas’ upstream and processing assets even if spot rare earth prices remain volatile.

    With no specific project named in this deal, the commitment looks portfolio‑wide for Lynas Rare Earths, giving Amanda Lacaze room to optimise feed between Australian operations and any future debottlenecking or new plants while still meeting JARE’s contracted volumes.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Gold and silver price weakness: planning implications for mine project teams
    Mining
    about 10 hours ago

    Gold and silver price weakness: planning implications for mine project teams

    Gold slipped below $5,100/oz on Friday, touching about $5,020 and heading for a second straight weekly loss as the Middle East war drives up oil and gas prices and keeps interest rate cut expectations low. The metal has traded in a tight $5,000–$5,200/oz range since an early-month spike after the US-Israeli strike on Iran, and is now almost 9% off its late-January record near $5,600/oz, though still 17% higher year-to-date. Silver fell almost 5% to just above $80/oz, with only a 10% gain so far in 2026.

    Rio Tinto’s Nemaska lithium plant slowdown: schedule and feed risks for mine planners
    Mining
    about 12 hours ago

    Rio Tinto’s Nemaska lithium plant slowdown: schedule and feed risks for mine planners

    Rio Tinto is slowing construction of the Nemaska lithium hydroxide conversion plant at Bécancour, Quebec, cutting its contractual workforce by about 50% while keeping several hundred workers on site, but still targets commissioning this decade and first production in 2028. The plant is roughly 70% complete, designed for 32,000 tonnes per year of lithium hydroxide, with Rio planning US$300 million of investment alongside a C$200 million commitment from the Quebec government, which retains 46.1%. Nemaska’s integrated project is based on a 26‑year Whabouchi open‑pit/underground mine producing 200,000 tonnes of spodumene concentrate annually, though Rio is reassessing feed against its Galaxy hard rock project, with a decision due in H2 2026.

    Oil shock and mining costs: BMO sensitivities unpacked for project teams
    Mining
    about 17 hours ago

    Oil shock and mining costs: BMO sensitivities unpacked for project teams

    Rising Brent crude above $100/bbl could lift iron ore cash costs by about 20%, copper by 16% and gold by 9% if prices hold near that level, BMO Capital Markets estimates from Wood Mackenzie data. Historical sensitivities show iron ore costs rising ~4.2% for every 10% oil increase, versus 3.5% for copper and 1.9% for gold, with diesel now only ~5% of copper site costs but higher energy feeding through power, consumables, labour and equipment. Africa and the Americas appear less exposed than Europe and Asia, while sulphur and ammonia flows via the Strait of Hormuz threaten acid and explosives input costs.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.