Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Lucara’s giant Karowe diamonds: 2026 revenue uplift and pricing lens for mine planners

    November 17, 2026|

    Reviewed by Joe Ashwell

    Lucara’s giant Karowe diamonds: 2026 revenue uplift and pricing lens for mine planners

    First reported on MINING.com

    30 Second Briefing

    Lucara Diamond has lifted its 2026 revenue guidance to $140–$160 million, from $100–$130 million, after selling the 2,488-carat Motswedi diamond and a 1,303-carat stone from the Karowe mine in Botswana, with Q3 revenue up 19% year on year to $61.1 million on sales of 113,227 carats. Sales to HB Trading for +10.8-carat stones rose 28% to $48.5 million and made up 79% of quarterly revenue, while Clara platform revenue fell 30% to $1.4 million and will be phased out in favour of tenders from Q1 2027. With global natural diamond output expected to drop below 100 million carats in 2026 from over 150 million less than a decade ago, pricing strength is concentrating in large, rare stones, leaving miners reliant on smaller goods exposed to weaker, lab-grown–driven pricing.

    Technical Brief

    • Clara platform revenue dropped 30% to $1.4 million, driven by a 26% fall in price per carat.
    • Lucara has issued notice to end Clara supply in 2027, reverting those parcels to standard tenders.
    • Regular tender revenue stayed flat year-on-year as 11% lower prices were offset by higher volumes.
    • Q3 2026 net profit declined 11% to $6.6 million despite higher revenue, indicating margin compression.
    • Karowe production slipped 1.3% to 94,067 carats, still yielding a 316-carat stone plus seven 100–200 carat stones.
    • Global natural diamond output is projected to fall below 100 million carats in 2026, from >150 million less than 10 years ago.

    Our Take

    The stronger 2026 revenue outlook at Karowe comes as Lucara is already locked into a capital‑intensive underground expansion there; our earlier coverage of the updated feasibility study highlighted a 10‑year, 4.5‑million‑carat plan, so higher cash flow from exceptional stones will be important for de‑risking that spend.

    With 79% of quarterly revenue tied to the HB Trading arrangement and tender/Clara prices down double digits, Lucara’s pricing exposure is now heavily skewed to a single offtake‑style channel, which could be advantageous in a weak spot market but concentrates counterparty and contract‑renewal risk.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Perenti–AngloGold Ashanti Geita gold mine deal: contract and JV lens for engineers
    Mining
    about 1 hour ago

    Perenti–AngloGold Ashanti Geita gold mine deal: contract and JV lens for engineers

    Perenti’s African Underground Mining Services has secured a new five-year underground mining contract at AngloGold Ashanti’s Geita gold mine in Tanzania, valued at about A$1 billion (US$67 million) through to 31 October 2031. Work will continue to be delivered via the AUMS Geofields Tanzania joint venture with local partner Geofields, extending an underground operating presence that began when Geita shifted from open pit to underground in 2016. The award signals long-term continuity for underground development, production drilling and related services at one of East Africa’s key gold operations.

    Greenland Energy–80 Mile $97m merger: project funding and drilling lens for miners
    Mining
    about 1 hour ago

    Greenland Energy–80 Mile $97m merger: project funding and drilling lens for miners

    Greenland Energy’s agreed all-share merger with 80 Mile plc values 80 Mile at about £74 million ($97.6 million), a 71% premium, with its shareholders to hold roughly 50% of the enlarged Nasdaq-listed company. The deal consolidates 100% of the Jameson Land Basin licences and combines the Disko-Nuussuaq and Dundas nickel-copper-cobalt-PGE projects in Greenland with 80 Mile’s Italian biodiesel assets. Backed by Greenland Energy’s $37.4 million cash position, April’s $70 million raise and a £3 million convertible loan, the new vehicle signals stronger funding capacity for Arctic drilling and project development.

    China’s rare earth giants’ profit surge: supply controls explained for project teams
    Mining
    about 1 hour ago

    China’s rare earth giants’ profit surge: supply controls explained for project teams

    China Northern Rare Earth and China Rare Earth Resources and Technology more than doubled net profits in the first nine months of 2026 to 3.65 billion yuan and 408 million yuan respectively, driven by tighter state supply controls and sharply higher prices. Neodymium-praseodymium (NdPr) compound prices have climbed 62% since the controls began, reaching 719,000 yuan per tonne, after Beijing cut production quota holders from six firms to two and extended quotas to imported feedstock in 2025. The strengthened quota regime and mandatory flow reporting tighten supply for magnet, battery and defence manufacturers, while reinforcing China’s leverage over US downstream projects still years from production.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental